| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
₹2.2 L
EMD Value
₹4,500
Closing Date
16 Nov 2024, 6:00 pmClosed
EE(C), BSNL CD-II, Hyderabad
Executive Engineer (C), BSNL Civil Division-II, Room No. 703, VII floor, BSNL Bhawan, Adarsh Nagar, Hyderabad - 500063
Dismembering of existing 21m high Tubular- Angular Rooftop Tower with H-V Gantry including dismantling RCC Beams and Column foundations etc., on terrace of Gpl2 floor Building, HAYATHNAGAR-TE (HD-2031) and transportation of materials to NACHARAM Hyd
2024_BSNL_213703_1
NIT No. 67/NIT/CECTSCZ/HYD/2024-25
Open Tender
Civil Works
Item Rate
30 days
Hayathnagar Hyderabad
Please refer Tender documents.
4 documents required · 4 mandatory
₹590
Accounts Officer (Cash), O/o PGMT, BSNL HTD BA
₹4,500
19 Nov 2024
7 Nov 2024
18 Nov 2024
7 Nov 2024
16 Nov 2024
7 Nov 2024
7 Nov 2024 - 16 Nov 2024
Amount
Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-charge. With cement mortar 1:4 (1 cement : 4 fine sand).
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.
Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work (Payment shall be made on the cross sectional area of R.C.C. or R.B. work) as per direction of Engineer in-charge.
Extra for scrapping, cleaning and straightening reinforcement from R.C.C. or R.B. work.
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar
Disposal of cement concerete debries to dumping ground (lead about 15km) by mechanical transport, including bringing the materials to ground floor from terrace loading and unloading complete. (Net quantity with out voids will be measured for payment)
Dismembering of roof top structural steel standard tubular/ angular Roof top tower of 21 m height with angular bracings and vertical and horizontal cable gantry, platforms and ladder with safety rings, antenna mounts etc., of steelwork in built up sections in angles, tees, flats, channels and pipes including all gusset plates, bolts, nuts, cutting rivets, welding etc. and also the cables/pvc pipes fixed to the gantry, including dismembering, lifting and stacking on terrace floor etc., complete as per the directions of Engineer-in-charge. (NOTE:- The rate includes cost of all operations involved in dismantling, dismembering the tower and connected cable gantry upto the BTS room/ shelter, ladder, etc., and stacking on terrace and making arrangements for weighing of tower steel materials and submission of weighing bill, including hire charges and labour charges of tools, plants and machineries, transport to weighing machine and insurance, safety provisions, etc., all complete)
Charges for Mechanical Transportation of 21m high 3 Legged Roof top Tower members, gantry members, ladder with safety rings etc., comprising of MS Tubes, angles, flats, channels, pipes, nuts, and bolts etc., of varying sizes and lengths from site of work at HAYATHNAGAR to Departmental stores at NACHARAM or/ any other specified place in Hyderabad which is within 20 Km lead from the place of work. The entire lot of Tower materials including horizontal & vertical gantry (approximatley 5.20 tonnes) shall be transported in a single lot. The job includes cost of transporting of dismantled tower, gantry, ladder materials including loading, unloading, transporting and handing over at stores at the designated location in Hyderabad etc., complete as per the directions of Engineer-in-charge.
Rebate for Taking away the reinforcement bars obtained from dismantled RCC work in beams, columns etc as per the directions of Engineer-in-charge. (The actual weight of reinfocement bars shall be measured for payment and agency has to arrange for weighing of bars and submit the bill)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .