Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.4 LAccepted-AOC H NO 2298 VPO NINDANA TEHSIL MEHAM ROHTAK 124513 | ROHTAK | HARYANA | 124513 | 1 | Accepted-AOC Being Lowest | |
| 2 | 2₹1.7 L+₹33,945 (24.3%)Rejected-AOC MAIN ROAD VPO BALDHAN KALAN DISTRICT REWARI 123411 | REWARI | REWARI | HARYANA | 123411 | 2 | Rejected-AOC Higher Rate | |
| 3 | 3₹1.8 L+₹36,094 (25.8%)Rejected-AOC | 3 | Rejected-AOC Higher Rate |
Tender Value
₹1.8 L
EMD Value
₹3,600
Closing Date
8 Jul 2021, 5:00 pmClosed
Executive Engineer Horticulture Division PWD GGM
Executive Engineer Horticulture Division PWD B and R Branch GGM
ANNUAL MAINTENANCE OF LANDSCAPING WORK OF NEW CIVIL REST HOUSE BAWAL FOR THE YEAR 2021-2022. ( PERIOD FROM 01.08.2021 TO 31.03.2022 ) ( 8 MONTHS)
2021_HRY_177884_1
EE/HORT/PWD/GURUGRAM
Open Tender
Miscellaneous
Works
240 days
Gurugram
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
₹3,600
Yes
28 Oct 2021
30 Jun 2021
9 Jul 2021
30 Jun 2021
8 Jul 2021
30 Jun 2021
Amount
Maintenance of fine grass lawn for Eight Months including fertilizer application, DAP @ 20gm/sqm, urea 40gm/sqm, watering,weeding, top dressing with good earth and manure mixture 2:1 @ 0.01cum per sqm, maintaining fine level, regular mowing andremoval of rubbish with all lifts and leads. (HSR :- 26.10) (Excluding cost of Material ) (Labour work only).
Maintaining the hedges for Eight Months including watering, hoeing weeding trimming and shaping ,replacement of casualty as andwhen noticed, application of Farm yard manure @ 0.0127 m layer over surface, application of insecticide chlorpyriphos @ 2mlper sqm twice , urea @40gm and DAP @10 gm per sqm once in a year. (HSR 26.35) (Excluding cost of Material ) (Labour work only).
Maintenance of tree for Eight Months for the age of tree of 4th, 5th and next years including weeding, hoeing, plant protection, the watering from Deptt. source, application of 4 ml chlorpyriphos four times, 0.0289 cum FYM each, 50gm urea twice, replacement of casualty etc.(HSR 26.15.2) (Excluding cost of Material ) (Labour work only).
Maintenance of shrub for Eight Months including weeding, hoeing, plant protection, watering from Deptt. source, application of 4 mlchlorpyriphos four times in a year , 0.0289cum FYM each, 20 gm urea and 20 gm DAP twice, replacement of casualty etc. (HSR 26.19) Individual shrubs(HSR :- 26..19.1) (Excluding cost of Material ) (Labour work only).
Maintenance of indoor specimen potted plants for Eight Months including watering, application of fertilizer NPK 20:20:20 @30 gm ,and vermi compost 100 gm twice , manure, snowcem/ apex every month, replacement of pot plate, broken pot, dead plant with same specie of plant etc.(HSR :- 26.47) ( Pot Size more than 30 Cm) (Excluding cost of Material ) (Labour work only).
Maintenance of indoor potted plants for Eight Months including watering, application of fertilizer NPK 20:20:20 @20 gm ,and vermi compost 50 gm , manure, snowcem/ apex every month, replacement of pot plate, broken pot, dead plant with same specie of plant etc.(HSR :- 26.45) (Excluding cost of Material ) (Labour work only).
The Gaur Co-Operative Multi Purpose Society Ltd.
The Yadav Cooperative LandC Society Ltd. Sohna
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .