Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.0 L+₹4,427.23 (2.28%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹2.0 L+₹5,902.97 (3.04%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹4,000
Closing Date
19 May 2026, 2:00 pmClosed
EE
S/O
Laying of 300 mm dia 40 Mtr. Sewar line and 03 Nos. Construction M.H. in Duda Colony Ward -57.
2026_DOLBU_1147265_2
JalKal / 427 / EE Zone 5 /
Open Tender
Miscellaneous Works
Percentage
30 days
Jal Kal Vibhag Kanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Jal Kal Vibhag
₹4,000
8 Jun 2026
11 May 2026
19 May 2026
11 May 2026
19 May 2026
11 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantlling of C.C. Road & its sta-cking old Mat. including Supply of lab,T&P all Comp.. For sewer line 300 mm dia for M.H | 57.72 | m^2 | 205 | ₹11,832.6 |
| 2 | Cutting of kharanja & its stacking old mat with supply of lab, T&P all complete For sewer line 300 mm dia for M.H | 57.72 | m^3 | 230 | ₹13,275.6 |
| 3 | Excavation of trenches in mixed soil including supply of lab, T&P all complete For sewer line 300 mm dia for M.H | 93.32 | CUM | 279.15 | ₹26,050.28 |
| 4 | Concrete work 12:6:1 with all Complete For sewer line 300 mm dia for M.H | 3.7 | CUM | 3,640 | ₹13,468 |
| 5 | Making barricading arrangement with sal, ballies lab, T&P etc all compl. For S.L For M.H | 104 | CUM | 118 | ₹12,272 |
| 6 | 1st class brick work with 1:4 cement & coarse sand mortar including supply of all mat., lab., etc all complete. | 1.63 | m^3 | 5,150 | ₹8,394.5 |
| 7 | 15 mm thick plaster in 1:4 cement & L. Sand mortar extra neat finishing etc all complete including supply of all mat., lab., T&P, watering & | 18 | Rmt | 150 | ₹2,700 |
| 8 | Providing beir to retain sewage water etc all comp. | 4 | Days | 450 | ₹1,800 |
| 9 | RCC work with cement, appd. C-sand, & 2 cm gauge apped. Stone ballast in the proportion of 1:2:4 in slab etc all complete. | 0.8 | m^3 | 7,300 | ₹5,840 |
| 10 | Mild steel or iron work in plain work such as reinforced concrete of reinforced B/W , rough to required shape necessary including binding for proper completion of the work. | 0.63 | m^2 | 5,500 | ₹3,465 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.37 MB
BOQ_2146208.xls
BOQ • 0.35 MB
2.pdf
Tender Documents • 1.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .