| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAccepted-AOC | ₹2.3 L | L1 | Accepted-AOC NIL |
| 2 | L2₹2.4 LRejected-Finance | ₹2.4 L | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | Dhanabakkiyam & Co L2 | P K S and Co L1 |
|---|---|---|---|---|---|
| 1.00Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B etc.,complete | |||||
| 1.01 | Footings | 9 | M3 | 280 ₹2,520 | 276 ₹2,484 |
| 2.00 | Plain Cement concrete 1:4:8 (one cement, four sand, eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication. | 2 | m3 | 5,900 ₹11,800 | 5,838 ₹11,676 |
| 3.00Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed | |||||
| 3.01 | Plinth Beam | 21 | m2 | 580 ₹12,180 | 575 ₹12,075 |
| 3.02 | Columns upto 3.00m height | 9 | m2 | 720 ₹6,480 | 710 ₹6,390 |
| 4.00 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 0.45 | m3 | 7,300 ₹3,285 | 7,270 ₹3,271.5 |
| 5.00 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - | 4 | m3 | 8,500 ₹34,000 | 8,411 ₹33,644 |
| 6.00 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors as per standard specification.. | 361 | Kg | 95 ₹34,295 | 92 ₹33,212 |
| 7.00 | Brick Work in Cement Mortor 1:5 Mix (one cement, five sand ) using new best country Bricks of size 8 ¾” x 4 ¼” x 2 ¾” from approved quarry including cost and conveyance of all materials to site. loading and unloading charges and labour charges for mixing, laying and curing etc. complete. complying with std. specifications. | 5 | m3 | 7,580 ₹37,900 | 7,556 ₹37,780 |
Tender Value
₹2.8 L
EMD Value
₹2,800
Closing Date
15 Dec 2025, 3:00 pmClosed
Executive Officer, Jalakandapuram Town Panchayat
Executive Officer Jalakandapuram Town Panchayat Salem District 636501
Construction of Compound Wall At Ward No 8 Compost Yard West Side Area in Jalakandapuram Town Panchayat
2025_DTP_629518_1
95/2025-1
Open Tender
Civil Works
Jalakandapuram Town Panchayat Limit
Construction of Compound Wall At Ward No 8 Compost Yard West Side Area in Jalakandapuram Town Panchayat
2 documents required · 2 mandatory
₹0
₹2,800
Yes
2 Jan 2026
6 Dec 2025
16 Dec 2025
6 Dec 2025
15 Dec 2025
6 Dec 2025
Amount
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B etc.,complete
Footings
Plain Cement concrete 1:4:8 (one cement, four sand, eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication.
Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed
Plinth Beam
Columns upto 3.00m height
Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers -
Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors as per standard specification..
Brick Work in Cement Mortor 1:5 Mix (one cement, five sand ) using new best country Bricks of size 8 ¾” x 4 ¼” x 2 ¾” from approved quarry including cost and conveyance of all materials to site. loading and unloading charges and labour charges for mixing, laying and curing etc. complete. complying with std. specifications.
Plastering with cement mortar 1:5 (One cement and five sand) ,12 mm thick in all floors including cost and conveyance of all materials to site etc,complete as per standard specifications
Supply and fixing of M.S Grills with Doors and Windows with one coat of Red oxide with Primer including all costs such as welding,grinding and fabrication charges, cost and conveyance of all materials to site etc,complete as per standard specification.
Exterior Emulsion paint Two coats with good quality of approved Emulsion paint including cost of all materials to site and all labour charges for mixing applying and proper curring etc., Complete
Painting two coats with Ready Mixed Enamel Paint over the new iron works of approved quality and colour without priming coat including the cost all materials etc.,complete, in all floors.
Dhanabakkiyam & Co (BID ID -1532744)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_752783.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_752783.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid