| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 CrAccepted-AOC | ₹3.7 Cr Quoted ₹7.6 Cr | L1 | Accepted-AOC Amount Including GST |
| 2 | l2₹10.7 Cr+₹3.0 Cr (39.4%)Rejected-Finance | ₹10.7 Cr+₹3.0 Cr (39.4%) | l2 | Rejected-Finance Rject |
| 3 | l3₹11.2 Cr+₹3.6 Cr (46.4%)Rejected-Finance GAT NO 787 4 5 A P VELU TAL BHOR DIST PUNE PUNE BANGALORE HIGHWAY AT POST VELU PUNE MAHARASHTRA 412205 | PUNE | MAHARASHTRA | 412205 | ₹11.2 Cr+₹3.6 Cr (46.4%) | l3 | Rejected-Finance Reject |
Tender Value
₹3.0 Cr
EMD Value
₹5.9 L
Closing Date
19 Nov 2020, 3:30 pmClosed
DGM FSCL
Faridabad Smart City Limited 3rd Floor, Nain Sadan Building Plot No. 35, 20A, Faridabad, Haryana.
PROVIDING SMART VISUAL IDENTITY PANEL OVER METRO PILLARS ALONG NH 44 IN ABD OF FARIDABAD SMART CITY INCLUDING ONE YEAR OF MAINTENANCE
2020_HRY_147717_1
FSCL/2020/2717
Open Tender
Civil Works - Others
Works
180 days
Faridabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹820
Commissioner MC Faridabad( CEO FSCL)
₹5.9 L
FSCL, Office
3 May 2021
15 Oct 2020
20 Nov 2020
15 Oct 2020
19 Nov 2020
16 Oct 2020
21 Oct 2020
Amount
Conceptualisation, Designing , Development, Manufacturing ,Supplying and Fixing 3 mm FR Grade (class B) ACM cladding over existing Metro pillars as perdesired circular shaped, composite panels will be cladded & wrapping over Al. frame work clamping type to be made by using Al. flat of 65 X 5 mm (±2mm) thick bolted & tightended on both ends as an clamping arrangements over the existing Metro pillar without any making holes by drilling or welding and Prismatic film duly digital printed on recommended platform machine with non flammable water based green inks.One extra layer of transparent UV lamination to increase the life of printing pasted over base sheeting in full & finally bonded/ pasted through mechanical roller machine on 3 mm ACM (FR Class B Grade) & fixed on Aluminium flat framing, The complete solution shall be such that the same can be dismantled and reinstalled without any damage to Visual Identity Panel as well as Metro Pillars and should sustain the performance for warranty period of five years without compromising the original appearance
Applying priming coat with cement primer in all shades on newly plastered of concrete exterior surfaces. (HSR 16.25)
Finishing walls with 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives. (DSR 13.48A) New work (Two or more coats applied @ 1.43 litre/ 10 sqm. Over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm. (DSR 13.48A.1)
Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineerin- charge .The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding. (DSR No. 14.72)
Conceptualization , Designing , Development , Supplying and Applying Prismatic reflective Sheeting over existing Metro RCC Beams as per shaped , wrapping over directly on RCC beam by using Polyurethane sealant as basic coat to prepare surface preparation and proper curing and adhesive primer applying two coat as per recommended intervals . After that reflective film digital printed on recommended platform machine with green inks and further one extra layer of transparent UV Lamination to increase the life of printing pasted over complete printing area bonded /pasted through hand rollers and squeezes applications and all edges will also be sealed by edge sealers complete excluding scaffolding etc.
Dismantling and reinstallation of existing graphics ACP panels already installed on the metro pillars by using scaffolding/ crane, tools and equipment, labour inclusing missing hardware/ repairs required (if any) as per the entire satisfaction of Engineer-in-charge.
Cleaning of already fixed facia, and graphic works on metro pillar by using cleanig solvents as recommended by eng in charge with all consumables, tools,equipments inculding scafoldding/ tower Ladder. A pillar to be done once in two month.
MILESTONE CORPORATION
KALPANA GLASS FIBRE PRIVATE LIMITED
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .