Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.6 LAdmitted-Fee/PreQual/Technical/Finance | -20.00% | ₹1.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.7 L+₹8,581.40 (5.36%)Admitted-Fee/PreQual/Technical/Finance | -15.71% | ₹1.7 L+₹8,581.40 (5.36%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2 L
EMD Value
₹4,000
Closing Date
9 Sept 2026, 6:55 pmClosed
Executive Engineer REW Pulwama
Executive Engineer REW Pulwama
FINDC2627103045-(DEVEOPMENT OF SCHOOL PREMISES BWO TILES AT GOVT PRIMARY SCHOOL GOJERBASTI MUJDAJAN NARGISTAN ARIPAL)
2026_RDPR_322606_4
e- NIT No. 107/2026-27 Dated 27-08-2026
Open Tender
Civil Works
Percentage
45 days
Pulwama
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Pulwama
₹4,000
10 Sept 2026
27 Aug 2026
10 Sept 2026
27 Aug 2026
9 Sept 2026
27 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E.work in surface excavation not exceeding 30 cm in depth and exceeding 1.5 m in width as well as 10 sqm on plan etc as directed by site incharge Engineer | 24.01 | Sqm | 91.75 | ₹2,202.92 |
| 2 | P/Laying of stone solling incl.carriage complete job | 7.83 | cum | 1,200 | ₹9,396 |
| 3 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 10.77 | cum | 5,733.6 | ₹61,750.87 |
| 4 | Chequerred precast cement concrete tiles 22mm thick in footpath and courtyard, jointed with neat cement slurry mixed with pigment to matchthe shade of the tiles, including rubbing, cleaning and curing complete, on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand) . Ordinary cement without any pigment. | 112.87 | sqm | 903.85 | ₹1,02,017.55 |
| 5 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 0.19 | cum | 6,591.25 | ₹1,252.34 |
| 6 | Head load of all key materials for 300 M | 25.01 | Cum | 506.11 | ₹12,657.81 |
| 7 | Carriage of sand from an average lead of 28 kms | 7.41 | cum | 535.64 | ₹3,969.09 |
| 8 | carraige of Stone Agg from an average lead of 26 kms | 9.77 | cum | 510.34 | ₹4,986.02 |
| 9 | Provision for sign board and Photographs and other unforseen items | 1 | Job | 1,800 | ₹1,800 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
BOQ_1082475.xls
BOQ • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .