Loading…
Loading…
Tender Value
₹1.7 Cr
EMD Value
₹3.4 L
Closing Date
28 Jul 2026, 10:00 am2d left
Executive Engineer
Office of the Executive Engineer CD, APWD, Campbell Bay
Construction of Inspection Bungalow (Doubled Storeyed 04 Nos Rooms) for APWD, Campbell Bay.
2026_APWD_23887_1
14//EE/CD/CB/2026-27
Open Tender
Civil Works - Buildings
Percentage
300 days
Executive Engineer CD, APWD, Campbell Bay
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹3.4 L
21 Jul 2026
21 Jul 2026
29 Jul 2026
21 Jul 2026
28 Jul 2026
21 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. | |||||
| 1.1 | All Kinds of soil | 56.5 | cum | 271.4 | ₹15,334.1 |
| 2Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m | |||||
| 2.1 | All Kinds of soil | 177 | cum | 401.5 | ₹71,065.5 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 132 | cum | 181.9 | ₹24,010.8 |
| 4Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. | |||||
| 4.1 | Beyond 30 cm girth upto and including 60 cm girth | 5 | each | 492.3 | ₹2,461.5 |
| 5Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||
| 5.1 | 1:2:4 (1 Cement : 2 coarse sand (zone - III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.6 | cum | 20,821.75 | ₹12,493.05 |
| 5.2 | 1:3:6 (1 Cement : 3 coarse sand (zone - III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) | 27.1 | cum | 19,267.1 | ₹5,22,138.41 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
Tenderdocument14.pdf
Tender Documents • 0.95 MB
BOQ_25314.xls
BOQ • 0.46 MB
Instructions-to-bidders.pdf
Additional Documents • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].