Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.8 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹6.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹7.5 L+₹67,813.03 (10.0%)Admitted-Fee/PreQual/Technical/Finance | +10.00% | ₹7.5 L+₹67,813.03 (10.0%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹6,781
Closing Date
23 Jul 2026, 5:00 pmClosed
Commissioner, Brahmapur Municipal Corporation
BRAHMAPUR, ODISHA, 760002
Development of bathing ghat of Kamapalli bandha in ward no. 32
2026_ORULB_134208_33
BeMC(BAM)/328/2026-27
Open Tender
Civil Works - Others
Percentage
75 days
BRAHMAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
₹6,781
Yes
27 Jul 2026
9 Jul 2026
24 Jul 2026
9 Jul 2026
23 Jul 2026
9 Jul 2026
9 Jul 2026 - 18 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in ordinary soil within initial lead of 50 m and initial lift of 1.50 m including rough dressing and breaking the clods, etc all complete as per direction of engineer- in-charge. | - | Cum | 306 | - |
| 2 | Dismantling removing cement concrete flooring 7.5 cm to 10 cm thick including stacking the useful materials for reuse and removing the debris withen 50 mt lwad. Per 1sqm (data for 9.30 sqm) | - | Sqm | 878.09 | - |
| 3 | Conveyance of excavated earth by mechanical means within 5km lead with loading and unloading the same | - | Cum | 34.2 | - |
| 4 | Supply and filling the F & P with filling sand of approved quality with well watered & rammed including cost, conveyance, royalty & all taxes, etc., complete. | - | Cum | 9.9 | - |
| 5 | Supplying all materials, labour, T&P for C.C. (1:4:8) using 40 mm size HG HAND BROKEN metal including laying, compacting, curing, with all cost, conveyance, royalty & taxes, etc., complete. | - | Cum | 6,239.4 | - |
| 6 | Supplying all materials, labour, T&P for M20 using 10 mm to 20 mm size HG Crusher Broken chips for RCC works including hoisting and laying, compacting, curing with all cost, conveyance, royalty & taxes, etc., complete. | - | Cum | 6,312.69 | - |
| 7 | Supplying fitting and placing uncoated HYSD steel reinforcement including cutting bending binding and placing the steel rods in position with cost binding wire 18 to 20 gauge | - | Qtl | 9,389.87 | - |
| 8 | Rigid & smooth centering & shuttering for R.C.C. and C.C. works including false works, dismantling and removing them from the site after casting, curing including cost of materials etc., complete. | - | Sqm | 769.2 | - |
| 9 | Rigid & smooth centering & shuttering for R.C.C. and C.C. works including false works, dismantling and removing them from the site after casting, curing including cost of materials etc., complete. | 24 | Sqm | 252.38 | ₹6,057.12 |
| 10 | Supplying all materials ,labour, T&P for 6mm thick cement plaster (1:4) including curing, cost & conveyance, royalty & all taxes, etc., complete | - | Sqm | 188.39 | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
DTCN1.pdf
Tender Documents • 1.60 MB
BOQ_600123.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .