| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹38,706.25Accepted-Finance | 1 | Accepted-Finance qualified | |
| 2 | 2₹39,292+₹585.75 (1.51%)Accepted-Finance | 2 | Accepted-Finance qualified | |
| 3 | 3₹39,379+₹672.75 (1.74%)Accepted-Finance | 3 | Accepted-Finance qualified | |
| 4 | 4₹41,005.65+₹2,299.40 (5.94%)Accepted-Finance | 4 | Accepted-Finance qualified | |
| 5 | 5₹54,106+₹15,399.75 (39.8%)Accepted-Finance | 5 | Accepted-Finance qualified |
Tender Value
Refer Docs
EMD Value
₹15,000
Closing Date
4 Dec 2019, 4:00 pmClosed
EXECUTIVE ENGINEER
Electric Division, JPDCL Udhampur
Ht and LT lines
2019_PDD_86185_1
ED/UDH/36 of 2019-20, Dated 04-11-2019
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
District Udhampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹750
Executive Engineer Elect. Division JPDCL, Udhampur
₹15,000
10 Aug 2021
20 Nov 2019
6 Dec 2019
20 Nov 2019
4 Dec 2019
20 Nov 2019
20 Nov 2019 - 27 Nov 2019
Erection/Maintenance of HT/LT Line & Creation/Augmentation of Substations
Survey for laying of 11KV Line
Route clearance/Branch cutting of trees
Unloading of 9 mtr long ST Poles
Unloading of 8 mtr long ST Poles
Unloading of 8 mtr long PCC Poles
Unloading of other material
Erection of 9 mtr long ST Pole (ST-410SP33)including pit excavation and backfilling , ramming including fixing of 1 no. crossarm, top pin clamp and braces for HT/LT Line
Erection of 8 mtr long ST Pole (ST-410SP33)including pit excavation and backfilling , ramming including fixing of 1 no. crossarm, top pin clamp and braces for HT /LTLine
Erection of 9 mtr long PCC Pole Including pit excavation and backfilling with ramming including fixing of 1 no. crossarm, top pin clamp and braces for HT /LT Line
Erection of 8 mtr long PCC Pole Including pit excavation and backfilling with, ramming including fixing of 1 no. crossarm, top pin clamp and braces for HT /LT Line
Laying,Stringing,tensioning,binding of 0.02/ 0.03 ACSR (Squirrel/Weasel conductor),fixing of hardware fittings and jointing for HT/ LT Line
Fixing of jumper sets for Tension Points including cutting of conductor of requisite length for LT Lines (set of 5 jumpers)
Fixing of jumper sets for Tension Points including cutting of conductor of requisite length for HT Lines (set of 3 jumpers )
Erection of Danger plates with clamps
Erection of Anti Climbing devices with clamps
Making and fixing of cradle guard of 8 SWG G I Wire comprising of 10 no.cross pieces per span including connection to earth on both ends
Earthing of poles complete with a spiral placed 1.5 m below ground level
Earthing of poles complete 2.5 m long with 20 mm Rod Earthing in soft soil
Earthing of poles complete 2.5 m long with 20 mm Rod Earthing in hard soil
Painting of ST poles .crossarms,clamps etc. with one coat of Red oxide Paint and 2 coats of Aluminium paint on 1 no. pole
Painting of crossarms,clamps etc. with one coat of Red oxide Paint and 2 coats of Aluminium paint on 1 no. pole
Erection of Guy Rod complete with guy insulator 2 no, turn buckles 2 no 1.8 m long 16mm dia solid GS Stay rod, anchor plate (200x200x6mm)2 no.,7/3.15 mm Guy wire complete
Cement bottoming as per REC Standards in 1:2:4 mix 0.5cum /pole including cost of material
Fixing of crossarms with clamps upto and including 3feet
Fixing of crossarms with clamps above 3ft and including 6feet
Fixing of crossarms with clamps above 6ft and including 9feet
Fixing of MS V crossarms
Fixing of braces
Fixing of 1 no. Pin insulator /Shackle insulator including pin etc.on LV Lines
Fixing of 1 no. Pin insulator /Shackle insulator including pin etc.on 11KV Lines
Unloading of 25 KVA Transformer
Unloading of 63KVA Transformer
Unloading of 100KVA Transformer
Unloading of 250KVA Transformer
Unloading of 400KVA /630 kvaTransformer
Installation of 11KV Lightening Arrestor
Installation of G.O Set including fixing of crossarms for mounting the set
Installation of HG Fuse Set including fixing of crossarms for mounting the set
Fixing of crossarm bed for placement of Transformer
Mounting of Transformer on crossarm bed including HV/LV Earting connections for 25KVA
Mounting of Transformer on crossarm bed including HV/LV Earting connections 63KVA/ 100KVA
Mounting of Transformer on crossarm bed including HV/LV Earting connections for 250KVA DT /400KVA DT
Mounting of Transformer on platform bed including HV/LV Earting connections for 630 KVA DT
Installation of LT Circuit including laying of cables to and from switchgear and installation of Switchgear including thimbling of cable,terminating ,making end connections upto 25KVA
Installation of LT Circuit including laying of cables to and from switchgear and installation of Switchgear including thimbling of cable,terminating ,making end connections ABOVE 25KVA upto 100KVA
Installation of LT Circuit including laying of cables to and from switchgear and installation of Switchgear including thimbling of cable,terminating ,making end connections Above 100KVA upto 630KVA
Wherever required fixing of backup protection of fuses on busbar insulators and connecting .
Replacement of damaged Disc insulators with hardware fitting in each tension stringing
Fixing of top clamp for Pin Insulators
Fixing of U/D clamp for LV Shackle Insulators
Crimping of thimbles to the cable ends for replacement/repair worksupto 70mm sq
Crimping of thimbles to the cable ends for replacement/repair works above 70 mm sq upto 185mm sq
Crimping of thimbles to the cable ends for replacement/repair works above 185mm sq
Carriage of ST poles 9m from unloading/stacking site to erection site upto first 100 mtrs IN PLAIN AREAS
Carriage of ST poles 9m from unloading/ stacking site to erection site for every additional 50 mtrs IN PLAIN AREAS
Carriage of ST poles 8m from unloading/stacking site to erection site upto first 100 mtrs IN PLAIN AREAS
Carriage of ST poles 8m from unloading/ stacking site to erection site for every additional 50 mtrs IN PLAIN AREAS
Carriage of PCC poles 9m from unloading/stacking site to erection site upto first 100 mtrs IN PLAIN AREAS
Carriage of PCC poles 9m from unloading/ stacking site to erection site for every additional 50 mtrs IN PLAIN AREAS
Carriage of PCC poles 8m from unloading/stacking site to erection site upto first 100 mtrs IN PLAIN AREAS
Carriage of PCC poles 8m from unloading/ stacking site to erection site for every additional 50 mtrs IN PLAIN AREAS
Carriage of ACSR condutor/Steel/accessories from stacking site to erection site upto first 100 mtrs IN PLAIN AREAS
Carriage of ACSR condutor/Steel/accessories from stacking site to erection site for every additional 50 mtrs IN PLAIN AREAS
Carriage of ST poles 9m from unloading/stacking site to erection site upto first 100 mtrs IN SEMI HILLY AREAS
Carriage of ST poles 9m from unloading/ stacking site to erection site for every additional 50 mtrs IN SEMI HILLY AREAS
Carriage of ST poles 8m from unloading/stacking site to erection site upto first 100 mtrs IN SEMI HILLY AREAS
Carriage of ST poles 8m from unloading/ stacking site to erection site for every additional 50 mtrs IN SEMI HILLY AREAS
Carriage of PCC poles 9m from unloading/stacking site to erection site upto first 100 mtrs IN SEMI HILLY AREAS
Carriage of PCC poles 9m from unloading/ stacking site to erection site for every additional 50 mtrs IN SEMI HILLY AREAS
Carriage of PCC poles 8m from unloading/stacking site to erection site upto first 100 mtrs IN SEMI HILLY AREAS
Carriage of PCC poles 8m from unloading/ stacking site to erection site for every additional 50 mtrs IN SEMI HILLY AREAS
Carriage of ACSR condutor/Steel/accessories from stacking site to erection site upto first 100 mtrs IN SEMI HILLY AREAS
Carriage of ACSR condutor//Steel/accessories from stacking site to erection site for every additional 50 mtrsIN SEMI HILLY AREAS
Carriage of ST poles 9m from unloading/stacking site to erection site upto first 100 mtrs IN HILLY AREAS
Carriage of ST poles 9m from unloading/ stacking site to erection site for every additional 50 mtrs IN HILLY AREAS
Carriage of ST poles 8m from unloading/stacking site to erection site upto first 100 mtrs IN HILLY AREAS
Carriage of ST poles 8m from unloading/ stacking site to erection site for every additional 50 mtrs IN HILLY AREAS
Carriage of PCC poles 9m from unloading/stacking site to erection site upto first 100 mtrs IN HILLY AREAS
Carriage of PCC poles9m from unloading/ stacking site to erection site for every additional 50 mtrs IN HILLY AREAS
Carriage of PCC poles 8m from unloading/stacking site to erection site upto first 100 mtrs IN HILLY AREAS
Carriage of PCC poles 8m from unloading/ stacking site to erection site for every additional 50 mtrs IN HILLY AREAS
Carriage of ACSR Weasel condutor/Steel/accessories from stacking site to erection site upto first 100 mtrs IN HILLY AREAS
Carriage of ACSR Weasel condutor//Steel/accessories from stacking site to erection site for every additional 50 mtrs IN HILLY AREAS
R K ELECTRICALS CONSTRUCTION AND SUPPLIERS
R S CONSTRUCTION
M/S R. V ENTERPRISES
MAHA SHAKTI ELECTRICAL WORKS
pankaj panotra
Patiaya Enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .