Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.0 LAccepted-AOC | ₹6.0 L | 1 | Accepted-AOC OK |
| 2 | 2₹6.1 L+₹7,383 (1.22%)Rejected-Finance | ₹6.1 L+₹7,383 (1.22%) | 2 | Rejected-Finance OK |
Tender Value
₹6.1 L
EMD Value
₹6,100
Closing Date
27 Dec 2024, 3:00 pmClosed
THE COMMISSIONER
TIRUCHENGODE MUNICIPALITY
Water Supply Fund 24-25-Attending Bust for Cable Replacement MV Panel to Raw Water LT cable 3.5 core 240 Sq.mm at Avathipalayam, 215HP Flex Compensated Magnetic Amplifier Soft Starter Spares Unit-II Avathipalaym Booster Station,215HP HSC Pump Unit I
2024_MAWS_510151_10
4597/2024/E1
Open Tender
Civil Works - Water Works
Works
90 days
TIRUCHENGODE MUNICIPALITY
-
1 document required · 1 mandatory
₹0
₹6,100
4 Feb 2025
17 Dec 2024
27 Dec 2024
17 Dec 2024
27 Dec 2024
17 Dec 2024
Amount
Cable Replacement MV Panel to Raw Water LT cable 3.5 core 240 Sq.mm at Avathipalayam
Supply and delivery of LT Cable 3.5 Core 240Sqmm 1.1 KV GRADE ARMOURED ALUMINIUM CONDUCTOR CROSS LINKED POLY ETHYLENE INSULATED PVC SHEATHED CABLES (TWAD SR 23-24 page-124)
CABLE LAYING for laying below GL including earth work 95 to 240 sq.mm (TWAD SR 24-25 page-126)
CABLE Clamps 95 to 240 sq.mm (TWAD SR 24-25 page-127)
RATE FOR CABLE JOINTS INCLUDING JOINTING MATERIALS AND LABOURL.T. CABLES 3.5 core 240sq.mm (TWAD SR 24-25 page-125)
Supply and delivery of LT Cable 3.5 Core 240Sqmm 1.1 KV GRADE ARMOURED ALUMINIUM CONDUCTOR CROSS LINKED POLY ETHYLENE INSULATED PVC SHEATHED cable joint kits etc complte.
215HP Flex Compensated Magnetic Amplifier Soft Starter Spares Unit-II Avathipalaym Booster Station
Labour Charges for Dismantling of moulding removing of burnt out winding and rewainding etc complete R.Y.B phases with 40%.80%.100% tapping series connecting providing overall insulation with fibre class insulation tape and sleeves, including out ends cable fixing leads and coating with varnish etc complete.
Supply and delivery of 8,9,10 SWG Copper enamled transformer winding wire etc complete.,
Supply and delivery of F-class insulation paper (After adjusting old scrab materials)
Labour charges for connecting the contactor and acessories assembly contactor CT Realy and its Acessories modified single time method, internal circuits power circuits including control wire copper legs Aluminium legs tools etc, complete.
215HP HSC Pump Unit I Avathipalayam.
Dismantling and removing the top cover pump, removing the impeller shaft and other roating damaged and wornout meterials from the roating assembly etc complete.
Supply and fixing of New Bronze Shaft Sleeve after adjusted the old scrap meterial etc complete.
Supply and fixing of impeller shield ring after adjusted the old scrap meterial etc complete.
Supply and fixing of water Thrower after adjusted the old scrap meterial etc complete.
Supplay and fixing of SS 304 Shaft key after adjusting old scrap materials etc complete.
Supplay and fixing of impiller lock nut after adjusting old scrap materials etc complete.
Supplay ,delivery and fixing of pump brarings for DE side N 309 after adjusting old scrap materials etc complete.
Supplay ,delivery and fixing of pump brarings for DE side 6309/C3 after adjusting old scrap materials etc complete.
Charges for pr pump DE & NDE side bearing housing sleeve in CI Materials to connect the bearing seating area to rectify the loose condition etc complete.
Charges for fixing pump packing sheet top cover complete new bolt & nut after adjusting old scrap materials/
Charges for the bed alignment commissioning lead lfit, tools and zero- Zero accurancy and painting etc complete.
Suppy, delivery and fixing of Fenner 120 Tyre coupling with 12mm Bolt nuts 16 Nos.( spare-1 no)
Conveyance of power pump set its Accessories for viceversa up to 20 to 40 kms etc complete. [TWAD SR-24-25, Page-205, Items-]
Supply MS Bolt Nut (TWAD SR 24-25 page-31)
Supply of 3 Ply RI Sheet (6mm) (TWAD SR 24-25 page-31)
Mobile Crane (12 Tonne)
7.5 HP wash water Unit- 1&2 Mono block Pumpset Avathipalayam Treatment Plant.
Removel of Monoblock pumpset at its assecories etc complete.
Dismantling the Pump set and top cover and worn out spares.
Removing the Damaged winding wire and stator cleaning and rewinding the stator with 'F' class insulation materials applying two coats Dr.Beck insulation varnish ect.after adjusting old scrap materials.
Supply and fixing of DE & NDE side bearings after adjusting old scrap materials.
Supply and fixing of DE & NDE side bearings sleeves including lathe works after adjusting old scrap materials.
Supply and fixing of rope gland stud with SS nuts after adjusting old scrap materials.
Supply and fixing of Gun metal pump bush including lathe works after adjusting old scrap materials.
Reassembling the stator and rotor completely, painting and testing ect.
Reassembly of Monoblock pumpset at its assecories etc complete.
Conveyance of power pump set its Accessories for viceversa up to 10 to 20 kms etc complete. [TWAD SR-24-25, Page-205, Items-]
THREE PHASE PANEL BOARD STAR- DELTA STATER 10HP (TWAD SR 24-25 page-120)
add GST 18%
S S INFRA (BID ID -1218443)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .