Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹3.8 L
EMD Value
₹7,620
Closing Date
10 Dec 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
EE PWD Dn. Asind
Repair and Mtc. Work in DLP Roads under Risk and cost Special Repair of Damaged CD work Batera to Pratappura Road Km 0/800.
2025_CEPWD_516199_14
NIT16
Open Tender
Repair and Maintenance Works
Percentage
30 days
Asind
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
EE/RISL
₹7,620
Yes
1 Dec 2025
1 Dec 2025
11 Dec 2025
1 Dec 2025
10 Dec 2025
1 Dec 2025
Providing & fabricating steel reinforecemnt for RCC work including cutting, bending, placing in position and binding complete including cost of binding wire as per MoRTH Specification : Section 1000 & 1600 TMT Steel reinforcement
Providing and filling in foundation trenches and at the back of abutments, wing walls etc. and below pipe bed in layers not exceeding 150mm thick including watering and compacting, including all lead and lifts.Filter media behind abutment, wing and return wall [MoRTH Specification :Clause : 2504]
Providing, laying, spreading and compacting specified graded crushed stone in sub-base course including premixing the material at OMC in mechanical mixer (Pug mill), carriage of mixed material, laying in uniform layers with motor grader, F.E.loader on a prepared surface and compacting with vibratory compactor to achieve the desired density including all material, labour, machinery, lighting barricading and maintenance of diversion complete.[MoRTH specification Clause 401] with all lead
Providing, laying, spreading and compacting crushed graded stone aggregate of as per table 400-10 and 400-11 to Wet Mix Macadam specification including premixing the material with water to OMC in mechnical mixer as per approved design mix, carriage of mixed material by Tipper to site, laying in uniform layers with motor grader/F.E. Loader/paver finisher in sub base / base course on a well prepared under base and compacting with vibratory roller to achieve the desired density including lighting, guarding, barricading and maintance of diversion etc. (MoRTH specification : Clause 406) by mechanical means with all lead
Construction of un-reinforced, without Dowl Bar plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per MoRTH specification clause 602.
Add Extra For Dowel Bar for Cement Concrete Pacement as per Drawing and MoRTH Specification 602.2.8
Providing and laying stone masonry work in cement mortar 1:6 with mechanical mixer for foundation (any level) complete including all scaffolding etc. but excluding pointing and plastering as per drawing and technical specification as per MoRTH Specification : Section 1000,1400 Random rubble masonry
Providing Cement plaster 20mm thick in cement mortar 1:3 at all levels as per MoRTH Specfication: Clause:1000 & 1300
White/colour washing of parapets, kerbs, railing, boundry stone, guide stone, poles, trees guard etc. complete.New surface three coats
Providing and laying granular sub-base material having P.I.not more than 6, including compacted thickness and consolidation by 8-10 tonne power roller at OMC to achieve desired density to required camber and grade including cost of water and hire charges of machinery, including T&P and all lead of material from quarry (compacted thickness to be measured). Grading as per MoRTH specification : Table 400-1, 400-2 with CBR value not less than 15 ii)To achieve 95% Proctor density
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.03 MB
Tendernotice_2.pdf
PDF • 13.92 MB
Tendernotice_3.pdf
PDF • 0.58 MB
Tendernotice_4.pdf
PDF • 1.44 MB
14TD.pdf
Tender Documents • 0.18 MB
BOQ_921088.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .