Loading
Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.8 LAccepted-AOC 72 133 THOTTILPATTY SALEM CAMP METTUR DAM 636456 | METTUR DAM | SALEM | TAMIL NADU | 636456 | ₹16.8 L Quoted ₹15.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹16.4 LRejected-AOC 99B4 WEST MAIN ROAD CAUVERY NAGAR METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | ₹16.4 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | KSS Engineering Contractor L1 | G S SRINIVASA ENTERPRISES PRIVATE LIMITED L2 |
|---|---|---|---|---|---|
| 1.00 | Transporting the refractory from MTPS-II central store to boiler "0" mtr, leading and lifting to the required elevation of boiler by providing chain block, pulley and rope. | 5,000 | kgs | 22.25 ₹1.1 L | 24.1 ₹1.2 L |
| 2.00 | Removing of old refractory and bringing to ‘0’m, including cost of all consumables, tools and plants etc., | 5,000 | kgs | 7.25 ₹36,250 | 8.6 ₹43,000 |
| 3.00 | Cutting and welding of clamp and arresting the buck stay plate, renewal/ reconditioning of cotter pin in the buckstay connecting corner plate including consumables and hire charges for T&Ps | 50 | Nos | 12,562 ₹6.3 L | 13,160 ₹6.6 L |
| 4.00 | Providing shuttering for refractory and applying new refractory in the required area of buckstay location including consumables and hire charges for T&Ps. | 5,000 | kgs | 33 ₹1.6 L | 34.6 ₹1.7 L |
| 5.00 | Removing the damaged leveller beam and providing new one at required elevation after removing the arresting clamps, positioning the beam, cutting and welding of leveller beam stiffner plates and its allied works, restoration of the clamps after renewal work and preparing scaffolding arrangements. Devoluting the scrap to store if required. | 3 | Nos | 20,445 ₹61,335 | 21,419 ₹64,257 |
| 6.00 | Removing the damaged leveller beam in front & rear side of boiler Right side of water wall ('S') panel 55 deg slope area in boiler 1st pass and providing new one at required elevation after removing the arresting clamps, positioning the beam inclined of 55°, cutting and welding of leveller beam stiffener plates and its allied works, restoration of the clamps after renewal work and preparing scaffolding arrangements with highest safety provision in 'S' panel 55 deg slope area. Devoluting the scrap to store if required | 3 | Nos | 32,160 ₹96,480 | 33,690 ₹1.0 L |
| 7.00 | Transporting of new Leveller Beam from '0'mtr to various required elevation and bringing the damaged one to '0'mtr. | 6 | Nos | 7,161 ₹42,966 | 7,502 ₹45,012 |
| 8.00 | Lifting the buckstay connecting corner plate and hanger pin wherever it is needed in the boiler with providing proper chain block supports for re-fixing the cotter pin including the charges like consumables, T&P’s and etc., | 10 | Nos | 14,719 ₹1.5 L | 15,420 ₹1.5 L |
| 9.00 | Removal of G.I sheet and insulation three layer (60mm x 3 = 180mm thick) from front, rear, left and right side water wall panels outside buck stay from 43 mtr to 65 mtr elevation, whichever required area in Boiler 1st pass and refixing after completion of rectification works | 40 | m2 | 4,251 ₹1.7 L | 4,454 ₹1.8 L |
| 10.00 | Cost for Required I-Beam (Size 250 X125 6.9mm) | 1,000 | kgs | 90 ₹90,000 | 100 ₹1 L |
Tender Value
Refer Docs
EMD Value
₹17,200
Closing Date
18 Aug 2025, 2:00 pmClosed
CE/ MTPS2
O/o.CE/ MTPS2
Removing of old refractory inspection of buck stay
2025_EB_591035_1
OT 87 Removing of old refractory inspection of buck stay
Open Tender
Maintenance Works
25 days
MTPS2
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹17,200
Yes
11 Mar 2026
11 Aug 2025
19 Aug 2025
11 Aug 2025
18 Aug 2025
11 Aug 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid