Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L₹1.0 CrAccepted-AOC | ₹1.0 Cr Quoted ₹1.1 Cr | L | Accepted-AOC Work allotted |
| 2 | L2₹2.7 CrRejected-Finance ASADUNA TODRAN TEHSIL BAHADURGARH DISTRICT JHAJJAR 124505 HARYANA | BAHADURGARH | JHAJJAR | HARYANA | 124505 | ₹2.7 Cr | L2 | Rejected-Finance Rate are higher side |
Tender Value
Refer Docs
EMD Value
₹2.0 L
Closing Date
19 Nov 2020, 6:00 pmClosed
EE-RW
MC Faridabad
Operation and Maintenance of ranney wells water supply Line-III, Manjhawali under water supply scheme for Faridabad Operation and Maintenance of 3 Nos. Ranney Wells at Manjhawali, 1 Nos. Main Boosting Station at Manjhawali, 02 Nos. Subsidiary Boostin
2020_HRY_149481_1
MCF/EE-RW/2020/010
Open Tender
Civil Works
Works
360 days
Faridabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹2.0 L
29 May 2021
30 Oct 2020
20 Nov 2020
30 Oct 2020
19 Nov 2020
30 Oct 2020
Amount
Operation & maintenance of 3 No. Ranney wells at Manjhawali along with pumping machinery, Panel board, Independent feeder, Transformer, DG Set, etc. complete in all respects for a period of 1 year 3 No. x 12 months = 36 Months
Maintenance of DI/MS pipe line & specials along with mtc. Of its civil structure appurtenances, rising main from 3 No. Ranney wells & Various tube wells in Manjhawali to MBS Manjhawali for a period of 1 year 3 No. x 12 months = 36 Months
Operation & maintenance of Main Boosting Station at Manjhawali as per Schedule III for a period of 1 year.1 No. x 12 months = 12 Months
Maintenance of PSC/MS pipe line & specials along with mtc. of its Civil Structure, appurtenances, steel truss bridge for rising main 900mm id/ PSC/MS/DI pipe line from MBS Manjhawali to Sector-09 & all other works contingent there to for a period of 1 year.1 No. x 12 months = 12 Months
Maintenance of DI/MS pipe line & specials along with mtc. Of its civil structure appurtenances, rising main 600mm to 200mm pipe line from MBS Sector-09 to 08 No. SBS at various places for a period of 1 year. 1 No. x 12 months = 12 Months
Operation & maintenance Subsidiary Boosting Stations as per schedule III for a period of 1 year at Sector-9 (Capacity 20 Lacs ltr).1 No. x 12 months = 36 Months
Operation & maintenance Subsidiary Boosting Stations as per schedule III for a period of 1 year Sector 11 (Capacity 40 Lacs ltr).1 No. x 12 months = 12 Months
Dismantling/ repairing of roads, casting of CC thrust Blocks including damage crop compensation due to leakage or other reasons, fire due to HT feeder in crops, electrocution of animals, to be paid if occurs. Job (LS)1 No. x 12 months = 12 Months
Jitender Contractor
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .