| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.2 CrAccepted-AOC ERODE | ₹10.2 Cr Quoted ₹8.9 Cr | L1 | Accepted-AOC FIRST LOWEST TENDERER |
| 2 | L2₹9.0 CrRejected-AOC NO 93 KADAL THOTTAM VADAPALANI KUMARAPALAYAM POST NATHAKADAIYUR VIA ERODE 638 108 | ERODE | TAMIL NADU | 638108 | ₹9.0 Cr | L2 | Rejected-AOC SECOND LOWEST TENDERER |
| 3 | L3₹9.5 CrRejected-AOC ERODE 638 002 | ERODE | TAMIL NADU | 638002 | ₹9.5 Cr | L3 | Rejected-AOC THIRD LOWEST TENDERER |
| Sl No | Description | Qty | Unit | kadal constructions L2 | M Bojarajan L3 | HariRam Constructions L1 |
|---|---|---|---|---|---|---|
| 1.00CIVIL WORK | ||||||
| 1.01 | Supplying and filling in basement with wetmix 150mm thick in layers of not exceeding 150mm thick, well watered, rammed and consolidated including machineries for hire and running charges leader 5 Cum capacity, hire charges for tipper, water sprinkler, vibratory roller all labour charges etc., complete complying with standard specification and as directed by the departmental officers. | 4,052 | M3 | 3,100 ₹1.3 Cr | 3,000 ₹1.2 Cr | 3,300 ₹1.3 Cr |
| 1.02 | CEMENT CONCRETE 1:5:10(one cement, five sand and ten aggregate)using 40mm gauge hard broken granite stone jelly for foundation including de-watering, side shuttering , strutting, wherever necessary including curing etc., complete complying with standard specifications and as directed by the departmental officers. | 2,702 | M3 | 6,000 ₹1.6 Cr | 6,600 ₹1.8 Cr | 6,200 ₹1.7 Cr |
| 1.03 | Reinforced Cement Concrete 1:2:4 (One Cement, Two crushed stone sand and Four hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges, centering and shuttering but including laying, vibrating with mechanical vibrator and sprinkling floor hardener at 4Kg/M2 and finishing with power trowel including laying in alternate bays, curing etc., complete complying with standard specification and as directed by the departmental officers. | 4,052 | M3 | 11,200 ₹4.5 Cr | 12,000 ₹4.9 Cr | 10,600 ₹4.3 Cr |
| 1.04 | Supplying, fabricating and placing in position MS/RTS grills for reinforcement for all R.C.C. works including cost of steel, labour for straightening, bending, cranking, tying grills with 18 gauge galvanized binding wire and placing grills in position complete complying with standard specification and as directed. | 1,620.75 | QTL | 9,700 ₹1.6 Cr | 9,400 ₹1.5 Cr | 9,500 ₹1.5 Cr |
| 1.05 | Supplying and fixing Bitumen Pad of 12mm thick for Expansion Joints including cost of Materials, labour charges etc., complete complying with standard specification and as directed by the departmental officers. | 1,136 | M2 | 500 ₹5.7 L | 600 ₹6.8 L | 450 ₹5.1 L |
Tender Value
Refer Docs
EMD Value
₹5.1 L
Closing Date
30 Jun 2025, 2:00 pmClosed
Managing Director
Head Office at CMRL Administrative Building , Poonamallee High Road, Koyambedu, Chennai-107
Formation of Cement Concrete Road in TNCSC Godown campus at Kovilur Village in Muthupettai Taluk in Thiruvarur District
2025_TCSC_562829_1
07/CED6/022729 /2025
Open Tender
Civil Works
180 days
Muthupettai
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹5.1 L
17 Sept 2025
29 May 2025
1 Jul 2025
29 May 2025
30 Jun 2025
29 May 2025
Amount
CIVIL WORK
Supplying and filling in basement with wetmix 150mm thick in layers of not exceeding 150mm thick, well watered, rammed and consolidated including machineries for hire and running charges leader 5 Cum capacity, hire charges for tipper, water sprinkler, vibratory roller all labour charges etc., complete complying with standard specification and as directed by the departmental officers.
CEMENT CONCRETE 1:5:10(one cement, five sand and ten aggregate)using 40mm gauge hard broken granite stone jelly for foundation including de-watering, side shuttering , strutting, wherever necessary including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Reinforced Cement Concrete 1:2:4 (One Cement, Two crushed stone sand and Four hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges, centering and shuttering but including laying, vibrating with mechanical vibrator and sprinkling floor hardener at 4Kg/M2 and finishing with power trowel including laying in alternate bays, curing etc., complete complying with standard specification and as directed by the departmental officers.
Supplying, fabricating and placing in position MS/RTS grills for reinforcement for all R.C.C. works including cost of steel, labour for straightening, bending, cranking, tying grills with 18 gauge galvanized binding wire and placing grills in position complete complying with standard specification and as directed.
Supplying and fixing Bitumen Pad of 12mm thick for Expansion Joints including cost of Materials, labour charges etc., complete complying with standard specification and as directed by the departmental officers.
kadal constructions (BID ID -1384609)
M Bojarajan (BID ID -1384905)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf