Loading…
Loading…
Tender Value
₹5.8 L
EMD Value
₹11,600
Closing Date
5 Jul 2026, 3:30 pmClosed
VISHAL MOHAN
EXECUTIVE OFFICER
OFFICE NAGAR PARISHAD HAVELI KHARAGPUR
VISHAL MOHAN
EXECUTIVE OFFICER
Construction of RCC Drain Near Registry Office under Nagar Parishad Haweli Kharagpur Munger Ward 15
134483
NIT-06/2026-27 GR-04
Open Tender
CIVIL
Saharsa
• PAN CARD,GST,EMD,TENDER FEE,TENDER PROCESSING FEE
• REGISTRATION CERTIFICATE
• ALL DOCUMENT AS PER NIT
CIVIL
PERCENTAGE
L1
1
7 documents required · 7 mandatory
₹1,250
Processing Fee: 590
₹11,600
office,nagar parishad haweli kharagpur
23 Jun 2026
23 Jun 2026
6 Jul 2026
26 Jun 2026
5 Jul 2026
26 Jun 2026
27 Jun 2026
Name of Work:- Construction of RCC Drain Near Registry Office under Nagar Parishad Haweli Kharagpur Munger Ward 15
Bill Of Quantity(BOQ)
i ESTIMATED COST
iii EARNEST MONEY
iv TIME OF COMPLITION
v ISSUE OF THE NAME OF AGENCY
vi MODE OF PAYMENT:-DD/CASE MR MD
Sl No SOR Itrem of Works Unit Qty Unit Rate Amount
1 BCD/ 2.8.1 Earth work in excavation in foundation trenches or drains(not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m . including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. M³ 54.81 360.7 19769.01
2 BCD/ 2.28 Supplying and Filling in plinth with local sand and under floors including, watering, ramming consolidating and dressing complete M³ 4.43 287.3 1273.97
3 BCD/ 11.72 Providing 100A one brick flat soling joints filled with local sand including cost of watering, taxes, royalty all complete as per building specification and direction of E/l, M³ 59.12 283.3 16749.83
4 BCD/5.1.2 Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement-All work puto plinth level 1:1:5:3(1 cement: 1.5 coarse sand:3 graded stone aggregate 20 mm nominal size) M³ 30.3 4688.3 142049.86
5 BCD/ 5.22.7 Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo- Mechanically Treated bars TMTC-500- Kg 2444.29 92.6 226341.49
6 BCD 5.9.1 Centring and shuttering including strutting,propping etc. and removal of form for Foundations, footings, bases of columns etc. for mass concrete M³ 266.94 211.6 56485.35
7 RCD/ 3.11 Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305. Qty vide item no-(1) = 24.20 M³ Total = 24.20 M³ M³ 54.81 125.44 6875.04
8 Cost of carriageway
9 Extra Cost Of Material
10 Add 5.36% for Additional GST 29161.34
11 Cost of Signboard & Photography 3500.00
12 Cost of Seigniorage
course sand M³ 13.03 17.58 229.04
stone chips M³ 25.75 59.54 1533.39
Local Sand M³ 5.32 14.19 75.51
Total 579532.25
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
TERM CONDITION.pdf
NIT • 3.08 MB
PAPER PUBLISH.pdf
NIT • 1.05 MB
TERM CONDITION.pdf
NIT • 3.08 MB
GR-04.xlsx
NIT • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .