Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.2 LAccepted-AOC | ₹14.2 L Quoted ₹12.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹12.1 LRejected-Finance | ₹12.1 L | L2 | Rejected-Finance L2 |
Tender Value
₹14.2 L
EMD Value
₹29,000
Closing Date
30 Mar 2026, 12:00 pmClosed
EEREDBIJNOR
EEREDBIJNOR
Construction of Anganbadi Kendra in Gram Panchayat-Narayanwala. Block-Afzalgarh
2026_REDUP_1123736_1
2358/EE/RED/DATE-25-02-2026
Open Tender
Civil Works
120 days
EEREDBIJNOR
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹29,000
Yes
EEREDBIJNOR
30 Jun 2026
11 Mar 2026
30 Mar 2026
11 Mar 2026
30 Mar 2026
11 Mar 2026
16 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in fdn. in ordinary soil l/c lift up to 1.5m & lead up to 30m 1/cdisposal of surplus earth etc. complete as per SI No.251 | 66.68 | Cum. | 190 | ₹12,669.2 |
| 2 | Cement Concrete in 1:4:8with Cement, C/Sand 2.25 F.M and 4cm gauge stone ballast in foundation & under floor i/c all etc. complete in all respects as per S.I.No. 281 | 16.13 | Cum. | 6,507.5 | ₹1,04,965.97 |
| 3 | M150 class B/W in 1:4 with cement and C/sand 2.20 Fm.mortar in plinth &foundation i /c all complete. As Chapter-6 S.I.No307 (a) | 29.1 | Cum. | 4,854.5 | ₹1,41,265.95 |
| 4 | R.C.C. work in 1:1.5:3 with Cement, coarse sand and 2cm guage stone grit for slab i/c all etc.complete in all respects as per S.I.No. 287 | 2.6 | Cum. | 7,281.75 | ₹18,932.55 |
| 5 | Sand Filling in Plinth Including supply of neecessary quantity of sand i/c all ect. Complete ina all respect as per Si No. 255 Ch No. 04 | 22.64 | Cum. | 722 | ₹16,346.08 |
| 6 | M150 class B/W in 1:4 with cement and c/ sand 2.20 Fm.mortar in Super Structure i /c all complete. As Chapter-6 S.I.No (305+309+310) | 26.74 | Cum. | 5,548 | ₹1,48,353.52 |
| 7 | Cast cement concrete in 1:2:4 with cement,c/sand & 20mm stone grit i/call etc comp. as per si no. 282 | 0.28 | Cum. | 7,647.5 | ₹2,141.3 |
| 8 | R.C.C. work in 1:1.5:3 with Cement, coarse sand and 2cm guage stone grit for slab i/c all etc.complete in all respects as per S.I.No. 283 A | 4.53 | Cum. | 7,885 | ₹35,719.05 |
| 9 | M150 class B/W in 1:4 with cement and c / sand 2.20 Fm.mortar in Super Structure i /c all complete. As Chapter-6 S.I.No (307a+309+310a) | 1.83 | Cum. | 5,719 | ₹10,465.77 |
| 10 | R.C.C. work in 1:1.5:3 with Cement, coarse sand and 2cm guage stone grit for slab, T-Beam, Coloumn i/c all etc.complete in all respects as per S.I.No. 288 | 11.61 | Cum. | 7,623.75 | ₹88,511.74 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
BOQ_2093651.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid