Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-Finance SHANKAR HOUSE TOTU SHIMLA HP 171011 | SHIMLA | SHIMLA | HIMACHAL PRADESH | 171011 | L1 | Accepted-Finance ok | |
| 2 | L2₹2.0 L+₹14,140 (7.69%)Rejected-Finance HIMACHAL PRADESH HP | CHAMBA | HIMACHAL PRADESH | 176207 | L2 | Rejected-Finance ok |
Tender Value
₹1.9 L
EMD Value
₹2,400
Closing Date
13 Jul 2026, 2:00 pmClosed
XEN Electrical Division No. 1 Shimla
The Executive Engineer Electrical Division No-I, HPPWD, Kasumpti, Shimla-
Annual maintenance Contract AMC of 3 Nos. 20KVA U.P.S installed in admin Block of H.P High Court Shimla for the period of one year w.e.f 30.12.2025 to 29.12.2026
2026_PWD_137843_4
Electrical Division-I dated 01.07.2026
Open Tender
Electrical Works
Percentage
365 days
SHIMLA
As per bidding Document
12 documents required · 12 mandatory
₹350
₹2,400
16 Oct 2026
1 Jul 2026
14 Jul 2026
1 Jul 2026
13 Jul 2026
1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Comprehensive Annual Maintennace contract of 20 Kva UPS including preventive/ breakdown maintenance (as detailed below) and replacement of defective parts discovered during maintenance shall have to be reported AND replaced by new and new parts/ spairs replaced will be either of the same make or equivalant make and replacement of defective wire wound components & other petty material except batteries and the UPS are to be maintained round the clock though out the year as per best satisfactory by Engineer-in-charge at Site. | 3 | Each | 62,843 | ₹1,88,529 |
| 1.01 | Terms and conditions:- | - | - | - | - |
| 1.02 | This contract shall cover the Annaul comrehensive maintenance of 3 No's of 20 KVA,UPS, for the period of one year. | - | - | - | - |
| 1.03 | This contract shall cover the Annaul comrehensive maintenance of 3 No's of 20 KVA, for the period of one year.This contract cover the scope of preventive maintenance as necessary to maintain the equipment in a proper operating condition.The Preventive maintenance includes functional checking necessary adjustments including minor repaires etc. which required to be carried out in advance. The breakdown maintenance is to be carried out in the event of malfunction, which prevent the operation of the equipment, work to be carreid out during the service coverage time as per the AMC Contract. At the time of Breakdown, this contract includes the fault finding, repair or replacement of defective parts and functional checking as & when required by Engg -in- charge. . | - | - | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.80 MB
DeclarationNEW.pdf
Additional Documents • 0.01 MB
SBD_4_0UPS.pdf
Tender Documents • 4.00 MB
BOQ_204069.xls
BOQ • 0.27 MB
Corrigen07.pdf
PDF • 0.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .