Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC AT WASHERY ROAD KATHARA BOKARO JHARKHAND 829116 | KATHARA | BOKARO | JHARKHAND | 829116 | ₹2.9 L | L1 | Accepted-AOC Awarded as Techno commercially accepted being as L1 bidder |
| 2 | L2₹3.1 L+₹21,344 (7.35%)Rejected-Finance AT KATHARA P O KATHARA BOKARO JHARKHAND 829116 | BOKARO | BOKARO | JHARKHAND | 829116 | ₹3.1 L+₹21,344 (7.35%) | L2 | Rejected-Finance Techno commercially rejected not being as L1 bidder |
| 3 | L3₹3.6 L+₹64,705 (22.3%)Rejected-Finance KATHARA BOKARO JHARKHAND PIN NO 829116 | KATHARA | BOKARO | JHARKHAND | 829116 | ₹3.6 L+₹64,705 (22.3%) | L3 | Rejected-Finance Techno commercially rejected not being as L1 bidder |
| Sl No | Description | Qty | Unit | M/S PERFECT ELECTRICAL WORKS L3 | M/S SHYAM ELECTRICALS L1 | STAR ELECTRICAL WORKLS L2 |
|---|---|---|---|---|---|---|
| 1.01 | A) 55 KW, RPM-985, Induction Motor
Super enamel copper wire SWG-16, 16, 16 (Total Wire 60 Kg. (-Less Scrap Value 60%) | 24 | Kg | 1,655 ₹39,720 | 1,460 ₹35,040 Lowest | 1,500 ₹36,000 |
| 1.02 | Insulation Cost . | 1 | LS | 15,200 ₹15,200 Lowest | 15,200 ₹15,200 Lowest | 15,200 ₹15,200 Lowest |
| 1.03 | Motor rewinding charge | 1 | LS | 16,500 ₹16,500 | 12,500 ₹12,500 Lowest | 15,200 ₹15,200 |
| 1.04 | Heat proof terminal lead | 6 | Nos | 1,200 ₹7,200 | 1,100 ₹6,600 Lowest | 1,200 ₹7,200 |
| 1.05 | B) 22 KW, RPM-1460, Induction Motor :- (Repairing cost of 02 nos.)
Super enamel copper wire SWG-19, 19 (Total Wire 33 Kg. - Less Scrap Value 60% | 26.4 | Kg | 1,655 ₹43,692 | 1,450 ₹38,280 Lowest | 1,500 ₹39,600 |
| 1.06 | Insulation Cost . | 1 | LS | 15,000 ₹15,000 Lowest | 15,000 ₹15,000 Lowest | 15,000 ₹15,000 Lowest |
| 1.07 | Motor rewinding charge | 1 | LS | 16,500 ₹16,500 | 14,500 ₹14,500 Lowest | 15,200 ₹15,200 |
| 1.08 | Other materials lead wire | 12 | Mtrs | 699 ₹8,388 | 500 ₹6,000 Lowest | 699 ₹8,388 |
| 1.09 | C) Welding Transformer Double Set 28 KVA, Make-Indian, Volt-415, 350 Amp (Repairing cost of 02 nos.)
luminium Strip & Wire SWG - 06, 08 (Total Wire 38 Kg). Less (-) Scrap Value 20% | 60.8 | Kg | 1,200 ₹72,960 | 1,000 ₹60,800 Lowest | 1,000 ₹60,800 Lowest |
| 1.10 | Insulation Cost . | 1 | LS | 10,500 ₹10,500 Lowest | 10,500 ₹10,500 Lowest | 10,500 ₹10,500 Lowest |
Tender Value
₹3.1 L
EMD Value
₹3,900
Closing Date
4 Nov 2025, 11:00 amClosed
SBN Singh
Office of Project Officer, Kathara Washery, Kathara Area
Complete repairing/rewinding of different types and different capacity of induction motors, Volt-415, 3Phase, (A)40 KW, RPM-1470, SL No. 756, Make-Russian, (B)22 KW, RPM-1460, SI No.(i)WNP U No.249 and (ii)WNPUNo. 247
2025_CCL_346084_1
PO/KTW/EnM/eTen/25-26/79 Dated-23.10.2025
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
Kathara Washery
As per NIT
5 documents required · 5 mandatory
₹3,900
3 Apr 2026
23 Oct 2025
5 Nov 2025
24 Oct 2025
4 Nov 2025
24 Oct 2025
24 Oct 2025 - 31 Oct 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Document
2.92 MB
BOQ
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .