| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LAccepted-Finance | ₹7.1 L | L1 | Accepted-Finance Low Quote |
| 2 | L2₹7.1 LRejected-Finance | ₹7.1 L | L2 | Rejected-Finance High Quote |
| 3 | L3₹7.3 LRejected-Finance SENGADU PO EDAPPULI NADU KOLLIHILLS TK PIN 637411 | KOLLIHILLS | NAMAKKAL | TAMIL NADU | 637411 | ₹7.3 L | L3 | Rejected-Finance High Quote |
| Sl No | Description | Qty | Unit | B.R.VISHU (JB Andal Builder / Vishnu Construction) L2 | MURUGAN L3 | ASHOKAN L1 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling clearing away and carefully stacking the materials useful for reuses of Rein forced Cement concrete forCulvert slab, etc.complete | 4 | m3 | 4,243.38 ₹16,973.52 Lowest | 4,610 ₹18,440 | 4,610 ₹18,440 |
| 2.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 33 | M3 | 259.06 ₹8,548.98 | 185 ₹6,105 | 165 ₹5,445 Lowest |
| 3.00 | CEMENT CONCRETE - M7.5 (1:4:8) (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 2.5 | M3 | 5,713 ₹14,282.5 | 5,130 ₹12,825 Lowest | 5,130 ₹12,825 Lowest |
| 4.00 | Vibrated Cement Concrete of grade M15 (Nominal mix) using 20mm ISS size HBG metal including cost and conveyance of all materials to site and cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Hire charges for Tools and plants and incidental charges etc., complete as per relevent standard specification for Culvert Side Walls | 5 | m3 | 102.07 ₹510.35 Lowest | 9,198 ₹45,990 | 9,198 ₹45,990 |
| 5.00 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 2,645 | KG | 179.27 ₹4,74,169.15 | 92 ₹2,43,340 | 91.7 ₹2,42,546.5 Lowest |
| 6.00 | Vibrated Reinforced Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for DECK SLAB | 23 | m3 | 108.35 ₹2,492.05 Lowest | 12,500 ₹2,87,500 | 11,785 ₹2,71,055 |
| 7.00 | Providing granolithic floor finish of 25mm thicknesswith plain cement concrete 1:2:4 (One Cement, Twocrushed sand (M-Sand) and Four aggregate) using 10to 12mm gauge hard broken stone jelly includinglaying, finishing and the top rubbed smooth withpower trawl, thread lining, curing etc. completecomplying with standard specification and as directedby the departmental officers. (The rate is inclusive ofnecessary planking for panelling wherever necessaryand as directed by the departmental officers) | 11.5 | m2 | 7,092 ₹81,558 | 165 ₹1,897.5 | 154 ₹1,771 Lowest |
| 8.00 | GST 18% | 1 | No | 1,07,736.22 ₹1,07,736.22 | 1,10,897.55 ₹1,10,897.55 | 1,07,653.05 ₹1,07,653.05 Lowest |
Tender Value
₹7.2 L
EMD Value
₹7,200
Closing Date
11 Mar 2026, 3:00 pmClosed
The Commissioner
Walajapet Municipality
Construction of Culvert at Poosalipachiyappan Street Ward no 11 in Walajapet Municipality
2026_MAWS_671769_1
269/2026/E1
Open Tender
Civil Works
Works
30 days
Walajapet
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
₹7,200
1 Jul 2026
7 Mar 2026
11 Mar 2026
7 Mar 2026
11 Mar 2026
7 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling clearing away and carefully stacking the materials useful for reuses of Rein forced Cement concrete forCulvert slab, etc.complete | 4 | m3 | - | - |
| 2 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 33 | M3 | - | - |
| 3 | CEMENT CONCRETE - M7.5 (1:4:8) (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 2.5 | M3 | - | - |
| 4 | Vibrated Cement Concrete of grade M15 (Nominal mix) using 20mm ISS size HBG metal including cost and conveyance of all materials to site and cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Hire charges for Tools and plants and incidental charges etc., complete as per relevent standard specification for Culvert Side Walls | 5 | m3 | - | - |
| 5 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 2,645 | KG | - | - |
| 6 | Vibrated Reinforced Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for DECK SLAB | 23 | m3 | - | - |
| 7 | Providing granolithic floor finish of 25mm thicknesswith plain cement concrete 1:2:4 (One Cement, Twocrushed sand (M-Sand) and Four aggregate) using 10to 12mm gauge hard broken stone jelly includinglaying, finishing and the top rubbed smooth withpower trawl, thread lining, curing etc. completecomplying with standard specification and as directedby the departmental officers. (The rate is inclusive ofnecessary planking for panelling wherever necessaryand as directed by the departmental officers) | 11.5 | m2 | - | - |
| 8 | GST 18% | 1 | No | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
BOQ_807294.xls
BOQ • 0.28 MB
Doc.pdf
PDF • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].