| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC 1 142 CHINNAPOSALIUR MARAMANGALATHUPATTI SALEM SALEM TAMIL NADU 636030 | SALEM | TAMIL NADU | 636030 | ₹1.2 Cr | L1 | Accepted-AOC L1 CONTRACTOR |
| 2 | L2₹1.2 Cr+₹2.3 L (2.00%)Rejected-Finance NO 3 331 KARTHIGA NAGAR THANKKANKULAM MADURAI 625 006 | MADURAI | MADURAI | TAMIL NADU | 625006 | ₹1.2 Cr+₹2.3 L (2.00%) | L2 | Rejected-Finance L2 CONTRACTOR |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
12 Jul 2024, 3:00 pmClosed
ADDITIONAL COLLECTOR (D) MADURAI
0/0 ADDITIONAL COLLECTOR (D) DRDA MADURAI
Madurai District_Strengthening of Sagadathatti road in Thirupparankundram under MGSMT (2024-25) Package no33
2024_RDTN_458661_1
DIRR/2074/TENDER/2024/Tpk33
Open Tender
Civil Works
Item Rate
180 days
Thirupparankundram
Refer Tender document
4 documents required · 4 mandatory
₹0
₹1.2 L
0/0 ADDITIONAL COLLECTOR (D) DRDA MADURAI
1 Aug 2024
1 Jul 2024
12 Jul 2024
2 Jul 2024
12 Jul 2024
5 Jul 2024
5 Jul 2024
Amount
Clearing the scrub jungle with uprooting and including all cuttings depositing of the products, removing from the site disposal by burying etc., complete including all incidental charges as directed by the departmental officers (SSR 301, 302, MOST 201) Km 0/0 - 2/060
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m KM 0/0 - 2/060
Earth work excavating and deposting on bank with borrow bits in hard stiff clay,stiff black cotton,hard red earth,shales,murrum,gravel stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layer of 250mm loose thick each, sectioning,watering and compacting etc, complete as per MOST 301-305 Km Km 0/0 - 2/060
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction watering and compacting by Power roller to achieve the required proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., completeSide berms KM 0/0-1/0
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
BITUMINOUS MACADAM 50 MM Thick including cost and conveyance of all materials to site and all labour charges for mixing ,laying etc complete Using Plastic Wastage @ 8 %
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Construction of 1.50 M RCC Slab Culvert @ 350M
Earth work excavation for Foundation in all clauses of soil, such as gravelly soil, hard stiff clay stiff black cotton soil, hard red earth and earth mixed with 50% of fair sized boulders and hard gravelly soil except sand, silt or other loose soils sandy loam and ordinary soil, hard rock requiring blasting etc.,
Plain CC 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials at site and labour charges including curing etc., completed
Supplying and centering shuttering including necessary support for plane surface for RCC column, footing , raft slabs, grade beams ,bed blocks using steel sheets of size 90cmx60cm and 10 gauge stiffened welded with mild steel angles of size 25mmx25mmx3mm for h laid over silver oak(country wood) first size 10cmx6.5cm spaced at about 90cm centre to centre supported by casurinas props of 10cm to 13 cm dia. Spaced at 75cm center complete complying with standard specification as directed by departmental officers (Below G.L)
Deck Slab
Plain CC 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials at site and labour charges including curing etc., completed
Supplying and fabraction of TOR steel (s-415) as per 1786 grade (tested) of various daimeter for all RCC works including cost and conveyance of TOR steel and fabraction charges handling charges for the same at both ends including all labour charges for untying straighting cleaning the rods, cutting and bending to shape tying grills with annealed mild steel binding wire joining to obatin required lenght spacing whever necessary with overlaps in the case of rods less than 20mm diameter and above by orc welding as per detailed specification etc complete.
Plain CC 1:2:4mix using 20mm ISS metal including cost and conveyance of all materials at site and labour charges including curing etc., completed
RCC 1:11/2:3 mix using 20mm ISS metal including cost and conveyance of all materials at site and labour charges including curing etc., completed
roviding and fixing 15mm thick compressible fibre board in expansion joint Complete as per Drawing and Technical Specifications
Providing and fixing Tar Paper for bearing between bed block Deck Slab
Well Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Supply & Fixing of 63mm PVC Pipe Wheep Holes
Construction of Retaining Wall @ Ch - 764.00 to 800.00m
Earth work excavation for Foundation in all clauses of soil, such as gravelly soil, hard stiff clay stiff black cotton soil, hard red earth and earth mixed with 50% of fair sized boulders and hard gravelly soil except sand, silt or other loose soils sandy loam and ordinary soil, hard rock requiring blasting etc.,
Plain CC 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials at site and labour charges including curing etc., completed
Supplying and centering shuttering including necessary support for plane surface for RCC column, footing , raft slabs, grade beams ,bed blocks using steel sheets of size 90cmx60cm and 10 gauge stiffened welded with mild steel angles of size 25mmx25mmx3mm for h laid over silver oak(country wood) first size 10cmx6.5cm spaced at about 90cm centre to centre supported by casurinas props of 10cm to 13 cm dia. Spaced at 75cm center complete complying with standard specification as directed by departmental officers (Below G.L)
Plain CC 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials at site and labour charges including curing etc., completed
Supply & Fixing of 63mm PVC Pipe Wheep Holes
Suppy and fixing of KILOMETRE (three faces two lines dressed) of size 0.90 x 0.10 x 0.10m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour finishing and all other incidental charges etc., complete
Suppy and fixing of HECTOMETRE STONE (three faces two lines dressed) of size 0.90 x 0.10 x 0.10m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour finishing and all other incidental charges etc., complete
Provision for Equilateral Triangle Cautionary Signboard Charges from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour finishing and all other incidental charges etc., complete
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
Road Marker / Road Stud With Lens Reflector
Provision for Provision for Name board & Citizen Charges from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour finishing and all other incidental charges etc., complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SPS CONSTRUCTIONS (BID ID -1080174)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .