| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹79.2 LAccepted-AOC AT MUKHIGUDA JAIPATNA DIST KALAHANDI | ₹79.2 L Quoted ₹70.6 L | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹67.1 L−₹3.4 L (4.86%)Rejected-Finance AT PO DUMUDUMA WARD NO 64 PS KHANDAGIRI BHUBANESWAR DIST KHORDHA | BHUBANESWAR | KHORDHA | ODISHA | ₹67.1 L−₹3.4 L (4.86%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹68.1 L−₹2.5 L (3.55%)Rejected-Finance | ₹68.1 L−₹2.5 L (3.55%) | L3 | Rejected-Finance Rejected |
| 4 | L4₹69.9 L−₹63,386.66 (0.90%)Rejected-Finance AT BARIMAL PO HATIBARI PS SUKINDA DIST JAJPUR PIN 755018 | JAJAPUR | ODISHA | 755018 | ₹69.9 L−₹63,386.66 (0.90%) | L4 | Rejected-Finance Rejected |
| 5 | L5₹72.7 L+₹2.2 L (3.07%)Rejected-Finance AT GARAM P O GARAM P S TIRTOL JAGATSINGHPUR | ₹72.7 L+₹2.2 L (3.07%) | L5 | Rejected-Finance Rejected |
Tender Value
₹93.2 L
EMD Value
₹93,300
Closing Date
6 Apr 2026, 3:00 pmClosed
Executive Engineer (Central Tender Cell)
Central Tender Cell,BMC,ICOMC Tower, Pin-751022
Construction of Road and Drain at Ghagudi Bridge to Ananda Vihar in Ward No. 23
2026_ORULB_127307_2
BMC-EE-Tender Cell-79/2025-26 dt. 13.03.2026
Open Tender
Civil Works - Others
Percentage
150 days
BMC AREA
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹93,300
Yes
Office chamber of the EE,Central Tender Cell
28 Jul 2026
17 Mar 2026
6 Apr 2026
17 Mar 2026
6 Apr 2026
17 Mar 2026
17 Mar 2026 - 24 Mar 2026
24 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in all kinds of soil including rough dressing and levelling the bed. direction of Engg -in- charge | 898 | cum | 299.52 | ₹2,68,968.96 |
| 2 | Supplying and filling F&P with river sand with well watering and ramming etc. complete. | 30 | cum | 519.79 | ₹15,593.7 |
| 3 | Construction of granular sub-base by providing close graded granular sub-base Grading-III materials per table 400-1, spreading in iniform layer and with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with vibratory roller to achive the desired density complete as per Clause 401 of MoSRT&H specification
for road and bridge works (4th Revision). | 448.5 | cum | 2,266.76 | ₹10,16,641.86 |
| 4 | Supplying all materials, labour, T&P and providing Cement Concrete (1:3:6) using 4 cm size CBHG metal etc. complete. | 321.5 | cum | 6,160.3 | ₹19,80,536.45 |
| 5 | Supplying all materials, labour, T&P and providing M-25 grade Cement Concrete using 20mm & down graded size BHGCB chips including etc. complete. | 141.65 | cum | 6,634.78 | ₹9,39,816.59 |
| 6 | Cutting,Straightening coiled or bent up M.S plain HYSD/TMT reinforcement bars welding or jointing if necessary bending,binding,tying the grills as required for R.C.C works,providing fan hooks where necessary and hoisting, lowering and placing in proper position according to approved designs and drawings including cost, conveyance,loading, unloading & taxes of M.S plain/HYSD/TMT reinforcement bars and binding wires of 18 to 20 gaugo required for the work and cost of all labour, sundries, T&P and scaffolding complete in all respect as directed by the Engineer in charge (payment will be made according to the actual weight of M.S plain/HYSD/TMT reinforcement bars consumed in the work only. | 60.75 | Qtl | 9,389.58 | ₹5,70,416.99 |
| 7 | Rigid smooth centring and shuttering for RCC work including dismantling them after use etc complete. | 774 | sqm | 250.28 | ₹1,93,716.72 |
| 8 | Providing and Laying Factory made Chamfered edge Cement Concrete Paver Bliocks of required strength, thickness & size/shape made by table Vibratory method , to attain superior smoth finish using PU or Equivalent moulds ,Laid in required gray colour and Pattern over 50mm thick Compacted bed of coarse sand , copmacting and proper embedding / laying of interlocking Paver Blocks into the sand bedding layer through vibratory compaction by using plate vibrator, Filling joints with Fine sand and cutting of Paver blocks as per required size/Pattern, finishing and sweeping extra sand in footpath , parks, lawns, drive ways, or light traffic parking and Lanes/Road etc, all complete as Per Manufacturers Specifications and Driection of Engg -In -Charge. 80mmm thick C.C. Paver Blocks of M-35 grade With approved colour design Pattern etc. complete. | 2,806 | sqm | 608.4 | ₹17,07,170.4 |
| 9 | Providing laying, spreading and compacting graded stone aggregate to "WET MIX MACADAM" specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub-base / base course on well prepared surface and compacting with vibratory roller to achive the desired density as per Clause 406 of MoSRT&H specification for road and bridge works. | 330 | cum | 2,413.05 | ₹7,96,306.5 |
| 10 | Providing and applying primer coat with bitumen emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.60Kg/M2 using mechanical means as per clause 502 of MoSRT&H specification for road & bridge work (4th revision) (Data for 3500M2) | 2,200 | sqm | 38.85 | ₹85,470 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
DTCN_79.pdf
Tender Documents • 0.95 MB
BOQ_585280.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .