Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.3 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹3.7 L+₹39,716.24 (12.0%)Admitted-Finance | L2 | Admitted-Finance |
Tender Value
₹3.7 L
EMD Value
₹7,460
Closing Date
6 Oct 2026, 4:00 pmClosed
Executive Engineer PWD R and B Division Hiranagar
Executive Engineer PWD R and B Division Hiranagar
boq
2026_PWDJK_326022_1
e-NIT No. 68 of 2026-27/ 3458-68 /PWD/HGR Dated 25 -09-
Open Tender
Civil Works - Roads
Percentage
30 days
HIRANAGAR
nit
8 documents required · 8 mandatory
₹600
Executive Engineer PWD R and B Division Hiranagar
₹7,460
9 Oct 2026
25 Sept 2026
7 Oct 2026
25 Sept 2026
6 Oct 2026
25 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres | |||||
| 1.01 | All kinds of soils : ( 75% ) | 40 | cum | 256.85 | ₹10,274 |
| 1.02 | Ordinary Rock ( 25% ) | 10 | cum | 493.5 | ₹4,935 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 5.5 | cum | 4,826.5 | ₹26,545.75 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with 20% stone boulder | 51 | cum | 4,774.46 | ₹2,43,497.46 |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 40 | cum | 218.4 | ₹8,736 |
| 5 | Providing and laying non-pressure of specified class R.C.C. pipes
including collars/spigot jointed with stiff mixture of cement mortar in the
proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc.
complete 1000 mm dia. R.C.C. pipe (laying by manual/mechanical
means) | 10 | mtr | 4,653.3 | ₹46,533 |
| 6 | Centring and shuttering including strutting propping etc and removal of form work Foundations, footings, bases of columns etc. for mass concrete | 30 | sqm | 286.35 | ₹8,590.5 |
| 7 | Supplying and laying including digging, carrying by lorry, filling River Bed Material including watering & consolidation in layers to specified lines, camber, grades and cross sections. Finished work. | 16 | cum | 300 | ₹4,800 |
| 8carriages of materials by mechinical transport incl. loading, unloading and stacking complete. | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
BOQ_1102295.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .