Loading…
Loading…
Tender Value
₹5.5 L
EMD Value
₹13,950
Closing Date
16 Sept 2026, 5:30 pm6d left
Rural Development and Panchayat Raj Department
Executive Engineer
Liquid Waste Management Scheme to Koravinakoppa village in Bailhongal Taluka
RDPR/2025-26/WT/WORK_INDENT15208/CALL-8
RDPR/2025-26/WT/WORK_INDENT15208/CALL-8
Open
Water /sewage treatment tanks
Two Tender Document System(Two Cover)
RDPR Division Office Belagavi
8 documents required · 8 mandatory
Work orders /commitments of ongoing works issued by an officer not below the rank of Executive Engineer
Work done certificate for similar nature of Work from Competent authority Rank of Executive Engineer & above
PRED/PWD Registration Certificate
Tenderer must Submit PAN & GST Certificate.
Name and Address of Contractor for Communication
Line of Credit Should be in the Bank Letter Head Format and mention indent number
Annual Turnover Certificate for at least last five years
UDIN is Preferred
₹500
₹13,950
4 Sept 2026
2 Sept 2026
18 Sept 2026
16 Sept 2026
INLINE TREATEMENT
Earth work excavation by manual means for drains,canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and te...
Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading,...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with supe...
Percentage on finished rate of concrete per m3, As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate as per table...
Steel Fabrication: Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/w...
Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joint...
Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joint...
Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openi...
20 mm Down size with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for succe...
12 mm Down size with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for success...
6 mm Down size with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successf...
Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and te...
Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading,...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with supe...
Percentage on finished rate of concrete per m3, As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate as per table...
Steel Fabrication: Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/w...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
KW-1Karvinkoppa 15208call-8 others.docx
Tender Document • 0.09 MB
PRED NOTIFICATION 25.docx
Tender Document • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .