Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.5 L+₹752.83 (0.50%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹1.5 L+₹2,258.50 (1.51%)Admitted-Fee/PreQual/Technical/Finance 03 SHIAH SHIAH BHUNTER NEENU KULLU HIMACHAL PRADESH 175141 | KULLU | HIMACHAL PRADESH | 175141 | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.5 L
EMD Value
₹3,000
Closing Date
15 Jul 2026, 5:00 pmClosed
Executive Engineer REW Kishtwar
HALL NO. 4 LOWER BLOCK MINI SECTT KISHTWAR O/O Executive Engineer REW Kishtwar
REFER BOQ
2026_RDPR_315067_1
e-NIT No 25 of REW KISHTWAR 2026-27 Dated. 07.07.2026
Open Tender
Civil Works
Percentage
KISHTWAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Rural Development and Panchayati Raj
₹3,000
16 Jul 2026
8 Jul 2026
16 Jul 2026
8 Jul 2026
15 Jul 2026
8 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIB SIZE ,4'-0"X3'-0"X 0'-9"above plinth level with trapered having 20 degree angle slope in brick masonary (1:4)mix including plaster ,paint, lettering ,all complete as per direction in charge inculiding inguration stone with writing | - | Nos | - | - |
| 2 | Earth Work in bulk excavation in all kinds of soil D/H soil by manual means. | 1 | CUM | - | - |
| 3 | P/Laying base concrete (1:4:8) mix & curing complete. | 1 | CUM | 1 | ₹1 |
| 4 | Dry stone pitching (any thickness) excluding cost of stones. On Horizontal | - | CUM | 1 | - |
| 5 | Providing and laying in position cement concrete of specified grade including curing 1:3:6 | - | CUM | - | - |
| 6 | F/Work of ordinary timber planks.(SIDES) | 1 | SQM | - | - |
| 7 | F/Work of ordinary timber planks. (SLAB) | - | SQM | - | - |
| 8 | P/Laying RCC (1:2:4) Mix of any thickness in walls curing complete. | - | CUM | - | - |
| 9 | Reinforcement for RCC Work including straightning,Cutting,Bending,Binding & placing in position . Qty vide item no 6.@ (70kg/Cum) | - | KGS | 1 | - |
| 10 | 12mm Cement plaster finished with a floating coat of neat cement of mix: 1 : 4 ( 1 cement : 4 fine sand) | 1 | SQM | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
BOQ_1020865.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .