Tender Value
₹1.2 Cr
EMD Value
₹2.5 L
Closing Date
23 Mar 2026, 2:00 pmClosed
Chief Enigneer
Nagar Nigam Firozabad
Construction of Clock Tower at Sadar Bazar, Firozabad, Uttar Pradesh
2026_DOLBU_1110492_2
1540/NNF_ClockTower/2025-26
Open Tender
Civil Works - Roads
Percentage
Firozabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
Municipal Commissioner
₹2.5 L
1 Apr 2026
10 Mar 2026
23 Mar 2026
10 Mar 2026
23 Mar 2026
10 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CIVIL WORK (DEMOLITION & RECONSTRUCTION) | |||||
| 1.01 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 13.2 | CUM | 2,738.73 | ₹36,151.18 |
| 1.02 | Demolishing cement concrete or bricks or Granolithic floor including base concrete and including stacking of dismantled material as directed by engineer in charge within a distance of 50 m | 9.9 | CUM | 1,877.29 | ₹18,585.22 |
| 1.03 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar | 46.2 | CUM | 1,588.83 | ₹73,403.82 |
| 1.04 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In lime mortar | 6.9 | CUM | 656.68 | ₹4,531.07 |
| 1.05 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead : Of area 3 sq. metres and below | 8 | each | 283.18 | ₹2,265.48 |
| 1.06 | Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transportincluding loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, complete as per directions of Engineer-in-charge. | 62.6 | CUM | 381.05 | ₹23,853.74 |
| 1.07 | Dismantling of existing pavement (bituminous course) by mechanical means and disposal of dismantled material upto a lead of 1km, as per direction of engineer in charge. | 15 | CUM | 324.52 | ₹4,867.82 |
| 1.08 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | 120 | SQM | 10 | ₹1,200 |
| 1.09 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer in- charge .The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding. Note: - This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done. | 441 | SQM | 260.86 | ₹1,15,038.62 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
BOQ_2092411.xls
BOQ • 0.41 MB
RFP_ReClockTower.pdf
Tender Documents • 1.79 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .