Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAdmitted-Finance | ₹1.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.7 Cr+₹3.8 L (2.30%)Admitted-Finance | ₹1.7 Cr+₹3.8 L (2.30%) | L2 | Admitted-Finance |
| 3 | L3₹1.7 Cr+₹4.3 L (2.58%)Admitted-Finance | ₹1.7 Cr+₹4.3 L (2.58%) | L3 | Admitted-Finance |
| 4 | L4₹1.7 Cr+₹9.8 L (5.96%)Admitted-Finance | ₹1.7 Cr+₹9.8 L (5.96%) | L4 | Admitted-Finance |
| 5 | L5₹1.8 Cr+₹16.7 L (10.1%)Admitted-Finance | ₹1.8 Cr+₹16.7 L (10.1%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S BHAN CONSTRUCTION L2 | MOHD IDRIS SHAN L9 | MOHAMMAD AYOUB NAIK L5 | valley builders L10 | M/S BASHIR AHMAD DAR L7 | M/S MEHRAJUDIN DAR L11 | KHURSHID AHMAD MIR L12 | M/S SUBZAR AHMAD ROY L4 | NAZIR AHMAD WANI L8 | Ghulam Mohammad Bhat L3 | M/S GHULAM NABI PARAY L6 | M/S NASEER AHMAD BHAT L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (Exceeding 30cm in depth, 1.5m width as well as 10sqm in plan) including disposal of excavated earth, lead up to 50mtrs. And lift up to 1.5m: disposed earth to be leveled and neatly dressed. | |||||||||||||||
| 1.01 | All kinds of soils | 946 | Cum | 99 ₹93,654 | 300 ₹2,83,800 | 200 ₹1,89,200 | 250 ₹2,36,500 | 210 ₹1,98,660 | 150 ₹1,41,900 | 100 ₹94,600 | 200 ₹1,89,200 | 240 ₹2,27,040 | 100 ₹94,600 | 197 ₹1,86,362 | 90 ₹85,140 Lowest |
| 2.00 | Providing and laying of stone soling hand packed in foundation trenches.(Nallah boulders hand packed complete job) | 457 | Cum | 507 ₹2,31,699 | 1,200 ₹5,48,400 | 600 ₹2,74,200 | 1,500 ₹6,85,500 | 700 ₹3,19,900 | 500 ₹2,28,500 | 600 ₹2,74,200 | 500 ₹2,28,500 | 900 ₹4,11,300 | 700 ₹3,19,900 | 800 ₹3,65,600 | 200 ₹91,400 Lowest |
| 3.00 | Providing and laying in position cement concrete of specified grade M-7.5 excluding the cost of centering and shuttering. All work upto plinth level 1 :4 :8 mix (1 - cement,4 - coarse sand, 8 graded stone agregate 40mm nominal size) | 229 | Cum | 3,977 ₹9,10,733 | 4,000 ₹9,16,000 | 4,000 ₹9,16,000 | 4,000 ₹9,16,000 | 3,800 ₹8,70,200 | 4,000 ₹9,16,000 | 3,600 ₹8,24,400 | 100 ₹22,900 Lowest | 3,500 ₹8,01,500 | 3,500 ₹8,01,500 | 2,800 ₹6,41,200 | 3,500 ₹8,01,500 |
| 4.00 | Providing and laying in position cement concrete of specified grade M-10 excluding the cost of centering and shuttering. All work upto plinth level 1 :3 :6 mix (1 - cement,3 - coarse sand, 6 graded stone agregate 40mm nominal size) | 140 | Cum | 4,507 ₹6,30,980 | 5,000 ₹7,00,000 | 5,500 ₹7,70,000 | 4,500 ₹6,30,000 | 5,000 ₹7,00,000 | 6,000 ₹8,40,000 | 4,600 ₹6,44,000 | 4,000 ₹5,60,000 Lowest | 5,800 ₹8,12,000 | 4,500 ₹6,30,000 | 5,300 ₹7,42,000 | 5,500 ₹7,70,000 |
| 5.00 | Supply and filling in plinth with fine sand under floors including watering, ramming, consoludating and dressing complete | 522 | Cum | 507 ₹2,64,654 | 700 ₹3,65,400 | 1,200 ₹6,26,400 | 1,500 ₹7,83,000 | 1,500 ₹7,83,000 | 800 ₹4,17,600 | 1,000 ₹5,22,000 | 900 ₹4,69,800 | 800 ₹4,17,600 | 800 ₹4,17,600 | 350 ₹1,82,700 Lowest | 1,275 ₹6,65,550 |
| 6.00 | Supply and filling in plinth with GSB under floors including watering, ramming, consoludating and dressing complete | 2,776 | Cum | 500 ₹13,88,000 | 900 ₹24,98,400 | 600 ₹16,65,600 | 1,500 ₹41,64,000 | 700 ₹19,43,200 | 800 ₹22,20,800 | 600 ₹16,65,600 | 450 ₹12,49,200 | 800 ₹22,20,800 | 700 ₹19,43,200 | 700 ₹19,43,200 | 100 ₹2,77,600 Lowest |
| 7.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations, etc. in layers not exceeding 20cm in depth: consolidating each deposited layer by ramming and watering lead up to 50mtrs. & lift up to 1.5mtr. | 1,900 | Cum | 77 ₹1,46,300 | 200 ₹3,80,000 | 100 ₹1,90,000 | 257 ₹4,88,300 | 120 ₹2,28,000 | 300 ₹5,70,000 | 80 ₹1,52,000 | 10 ₹19,000 | 100 ₹1,90,000 | 5 ₹9,500 Lowest | 100 ₹1,90,000 | 175 ₹3,32,500 |
| 8.00 | Providing & laying in position specified grade of reinforced cement concrete M-25 including attached plasters buttresses plinth and string courses, fillets, columns, pillars excluding the cost of centering, shuttering, finishing & reinforcement- all work upto plinth level | 952 | Cum | 8,377 ₹79,74,904 | 8,700 ₹82,82,400 | 8,500 ₹80,92,000 | 6,400 ₹60,92,800 Lowest | 8,500 ₹80,92,000 | 8,700 ₹82,82,400 | 11,800 ₹1,12,33,600 | 9,300 ₹88,53,600 | 10,000 ₹95,20,000 | 7,950 ₹75,68,400 | 8,700 ₹82,82,400 | 7,900 ₹75,20,800 |
| 9.00Centering & shuttering including, strutting, propping, etc. & removal of form for: | |||||||||||||||
Tender Value
₹2.4 Cr
EMD Value
₹4.8 L
Closing Date
19 Jan 2021, 2:00 pmClosed
DGM Housing Board Unit-I Srinagar
Office of the Deputy General Manager Housing Board Unit-I, Barbar Shah, Srinagar
Construction of Proposed Court Complex at Kulgam (Phase-I).
2020_HAUDD_112791_1
e-NIT No 10 of 2020-21 Dated 29-12-2020
Open Tender
Civil Works
Item Rate
120 days
Kulgam
Please refer Tender documents.
8 documents required · 8 mandatory
₹5,500
Credited in A/c 0361040500004285 (JAKA0RAWWAL)
₹4.8 L
11 Mar 2021
31 Dec 2020
21 Jan 2021
31 Dec 2020
19 Jan 2021
31 Dec 2020
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (Exceeding 30cm in depth, 1.5m width as well as 10sqm in plan) including disposal of excavated earth, lead up to 50mtrs. And lift up to 1.5m: disposed earth to be leveled and neatly dressed.
All kinds of soils
Providing and laying of stone soling hand packed in foundation trenches.(Nallah boulders hand packed complete job)
Providing and laying in position cement concrete of specified grade M-7.5 excluding the cost of centering and shuttering. All work upto plinth level 1 :4 :8 mix (1 - cement,4 - coarse sand, 8 graded stone agregate 40mm nominal size)
Providing and laying in position cement concrete of specified grade M-10 excluding the cost of centering and shuttering. All work upto plinth level 1 :3 :6 mix (1 - cement,3 - coarse sand, 6 graded stone agregate 40mm nominal size)
Supply and filling in plinth with fine sand under floors including watering, ramming, consoludating and dressing complete
Supply and filling in plinth with GSB under floors including watering, ramming, consoludating and dressing complete
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations, etc. in layers not exceeding 20cm in depth: consolidating each deposited layer by ramming and watering lead up to 50mtrs. & lift up to 1.5mtr.
Providing & laying in position specified grade of reinforced cement concrete M-25 including attached plasters buttresses plinth and string courses, fillets, columns, pillars excluding the cost of centering, shuttering, finishing & reinforcement- all work upto plinth level
Centering & shuttering including, strutting, propping, etc. & removal of form for:
Foundation, footings, bases of columns, etc. for mass concrete
Walls (any thickness) including attached plinth and string courses etc. pilasters, butteresses.
Lintels, beams, plinth beams, girders, bressumers and cantilevers.
Columns, pillars, piers, abutments, posts & struts.
Steel reinforcement for RCC work for footings, columns, beams etc. including straightening, cutting, bending, placing, in position & binding all complete.
Thermo-Mechanically Treated Bars.
M/S BHAN CONSTRUCTION
Ghulam Mohammad Bhat
M/S SUBZAR AHMAD ROY
MOHAMMAD AYOUB NAIK
M/S GHULAM NABI PARAY
M/S BASHIR AHMAD DAR
NAZIR AHMAD WANI
MOHD IDRIS SHAN
valley builders
M/S MEHRAJUDIN DAR
KHURSHID AHMAD MIR
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
JKHBu1eNIT10SBD.pdf
Tender Documents • 1.33 MB
BOQ_215866.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .