Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.0 LAccepted-Finance | 1 | Accepted-Finance Accepted | |
| 2 | 2₹2.0 L+₹1,800 (0.91%)Accepted-Finance 21 JHAMRI 151 JHAMRI JHAMRI ROHTAK HARYANA 124142 UDYAM HR 07 0030314 | JHAJJAR | HARYANA | 124142 | 2 | Accepted-Finance Accepted | |
| 3 | 3₹2.0 L+₹2,160 (1.09%)Accepted-Finance 00 JALESAR MAHAVIR GANJ 00 VILLAGE TOWN JALESAR CITY ETAH ETAH UTTAR PRADESH 207302 INDIA | ETAH | UTTAR PRADESH | 207302 | 3 | Accepted-Finance Accepted |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
15 Feb 2022, 9:00 amClosed
Executive Engineer
Executive Engineer, ETD-II, Aligarh, UPPTCL 132 KV Substation Sarsol compound complex, Sarsol, GT road, Aligarh 202002
Replacement of single suspension fitting by double suspension fitting at SH and NH road crossings and other miscellaneous maintenance works at 132/220 KV Transmission lines under ETD-II, Aligarh.
2022_UPTCL_674338_1
ETD(A)/TD-10/2021-22
Open Tender
Electrical Works
Item Rate
30 days
Aligarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Executive Engineer
₹2,000
25 Mar 2022
11 Jan 2022
16 Feb 2022
11 Jan 2022
15 Feb 2022
11 Jan 2022
Amount
Following works are to carried out at 220 KV D/C Harduaganj-Khurja line:
Replacement of single suspension string by double suspention string. Work includes dismantling of single suspention fitting by opening suspention clamp etc. and fixing of double suspention fitting and string at the same place work also includes carriage of materials from 220 KV S/S Atrauli to site and carriage of dismantled material from site to 220 KV S/S Atrauli and all other work required for satifactory completion of work between location No. 11,12,13,97.
Replacement of old PA rod by new PA rod (to be provided by department) for replacement of suspension fitting. Work includes dismantling of old PA rods and carriage of same to 220KV Susbation Atrauli after completion of work
Following works are to carried out at 220 KV D/C Harduaganj-Mainpuri line:
Refixing of shifted Vibration dampers of 220KV DC Harduaganj-Mainpuri line after shifting to actaual position. Work include proper tightening of vibration after shifting to original position. (location No. 29 ,30,42,43,54,57,183,187,193,195,218 & 222)
Repairing of foundation copping including cost of material, lobor, T&P etc and transportation upto site (location no. 23,46,49,56,77,84,106,108 & 66)
Following works are to carried out at 132 KV S/C Akrabad-Sikandrarao line:
Replacement of single suspension string by double suspention string. Work includes dismantling of single suspention fitting by opening suspention clamp etc. and fixing of double suspention fitting and string at the same place work also includes carriage of materials from 132 KV S/S Sikandrarao to site and carriage of dismantled material from site to 132 KV S/S Sikandrarao and all other work required for satifactory completion of work between location No. 44-45.
M/S KUMAR CONSTRUCTION COMPANY
Versha and Brothers
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .