Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.8 CrAccepted-AOC | ₹1.8 Cr | 1 | Accepted-AOC L1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical Ineligible |
Tender Value
₹1.9 Cr
EMD Value
₹1.9 L
Closing Date
30 Jan 2025, 3:00 pmClosed
Additional Collector (Dev)(/ Project Officer
DRDA, The Nilgiris
Upgradation of road from Muthiri to Indra nagar ST Colony road Km 0.0-2.0 H.O Burliyar, Coonoor panchayat union
2025_RDTN_519895_1
PO3 NABARD XXX 2024 -25 THE NILGIRIS- MUTHIRI INDRA COLONY
Open Tender
Civil Works - Roads
Item Rate
180 days
Coonoor
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1.9 L
11 Apr 2025
23 Jan 2025
30 Jan 2025
23 Jan 2025
30 Jan 2025
23 Jan 2025
Amount
Upgradation of road from Muthiri to Indra nagar ST Colony road Km 0/0-2/0 H/O Burliyar, Coonoor panchayat union. ( R - 80 )
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Supplying and erecting centering for sides and soffits including supports and strutting upto 3.29m height for plane surface in all floors with Cross bracings using mild steel sheets of size 90cms x 60cm and 10 gauge stiffened welded with mild steel angles of size 25mm x 25mmx3mm for boarding laid over silver oak (Country wood) Joists of size 10cm x 6.5 cm dia spaced at about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre etc complete complying with standard specification and as directed for the following items.
Cement concrete 1:3:6 using 40 mm gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 30cm, thick, compacting etc., complete complying with standard specification and as directed.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse an
Providing and laying of hot applied thermoplastic compound 2.50mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads ass per IRC :35 the finished to be level, uniform and free from streaks and etc complete as per MORT and H specification no.803
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular materials in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, back filling, concrete and masonry works in bead walls and parapets clause 1106
Retaining wall
Earth work excavation and depositing on bank within initial lead of 10mtrs and initial lift of 2mtrs. in hard stiff clay still black hard red earth shales murrams gravel stoney earth a death mixed withsmall size boulders and hard gravelly soil (SS 20 B)
Cement concrete 1:4:8 (one cement four sand and eight hard broken stone) using 40mm gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15cm, thick, compacting etc.,
Supplying and erecting centering for sides and soffits including supports and strutting upto 3.29m height for plane surface in all floors with Cross bracings using mild steel sheets of size 90cms x 60cm and 10 gauge stiffened welded with mild steel angles of size 25mm x 25mmx3mm for boarding laid over silver oak (Country wood) Joists of size 10cm x 6.5 cm dia spaced at about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre etc complete complying with standard specification and as directed for the following items.
Parapet Wall Km 1/0-2/0
Cement concrete 1:3:6 using 40mm gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15cm, thick, compacting etc., complete complying with standard specification and as directed.
Pipe Culvert - 3 Nos(255,730,1250)
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement Concrete 1:4:8 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick, compacting etc., complete complying with standard specification and as directed
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing including conveyance of all materials to site and proper centering etc complete.
Cement Concrete 1:3:6 mix using 40mmHBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick, compacting etc., complete complying with standard specification and as directed
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular materials in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, back filling, concrete and masonry works in bead walls and parapets clause 1106
Gravel filling between body wall including cost and conveyance of gravel, labour for filling watering and compacting etc, complete complying with standard specification and as directed by the departmental office.
Provision for 60 cm Triangle Sign board Charges
Provision for Name Board Charges
Provision for KM Stones
Provision for HM Stones
Towards the charges for routine maintenance of the road work including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Provision for Photographic Charges
Bidder Name
A T SABU THOMAS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .