Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 CrAdmitted-Finance K 23 DBS APARTMENTS IIIRD FLOOR FIRST AVENUE ANNA NAGAR EAST CHENNAI 600102 | CHENNAI | CHENNAI | TAMIL NADU | 600102 | ₹4.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.6 Cr+₹12.7 L (2.80%)Admitted-Finance | ₹4.6 Cr+₹12.7 L (2.80%) | L2 | Admitted-Finance |
| 3 | L3₹4.7 Cr+₹21.1 L (4.67%)Admitted-Finance | ₹4.7 Cr+₹21.1 L (4.67%) | L3 | Admitted-Finance |
| 4 | L4₹4.8 Cr+₹26.0 L (5.75%)Admitted-Finance | ₹4.8 Cr+₹26.0 L (5.75%) | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | Rejected-Technical PQC Not Fulfilled |
| Sl No | Description | Qty | Unit | M/S Priya tech Company L2 | PRIYANKA ENERGYTECH PVT LTD L3 | ARUN KUMAR RAM L4 | DMS ENTERPRISES AND COMPANY L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Picking of stones, boulders, and other tramp materials from the running conveyors of Coal Handling Plant of ‘A’TPS Anpara in three shifts daily having following specifications:
(i) Belt Width: 1500 mm
(ii) Belt Speed: 3.3 mtrs per sec
(iii) Plant Capacity: 2100 TPH | 24 | One job per month | 9,26,556.12 ₹2,22,37,346.88 | 9,43,402.6 ₹2,26,41,662.4 | 9,53,131 ₹2,28,75,144 | 9,01,286.41 ₹2,16,30,873.84 Lowest |
| 2.00 | Picking of stones, boulders, and other tramp materials from the running conveyors of Coal Handling Plant of ‘B’TPS Anpara in three shifts daily having following specifications:
(i) Belt Width: 1600 mm
(ii) Belt Speed: 3.3 mtrs per sec
(iii) Plant Capacity: 2100 TPH | 24 | OneOne job per month | 7,83,932.82 ₹1,88,14,387.68 | 7,98,186.14 ₹1,91,56,467.36 | 8,06,417 ₹1,93,54,008 | 7,62,552.83 ₹1,83,01,267.92 Lowest |
| 3.00Shifting of materials within 50 meter lead and stacking as per scope of work and Stone transportation along with loading and unloading of picked up stones (from coal) accumulated on the ground beneath the conveyors of ‘A’ & ‘B’ TPS including stacking etc. as per scope of work | |||||||
| 3.10 | 1A/B, 2A/B of CHP, 3x210 MW, ATPS, Anpara. | 32,200 | M3 | 95.7 ₹30,81,540 | 97.44 ₹31,37,568 | 98.44 ₹31,69,768 | 93.09 ₹29,97,498 Lowest |
| 3.20 | 21A/B, 22A1/B1 of CHP, 2x500 MW BTPS, Anpara | 24,200 | M3 | 95.7 ₹23,15,940 | 97.44 ₹23,58,048 | 98.44 ₹23,82,248 | 93.09 ₹22,52,778 Lowest |
Tender Value
₹4.5 Cr
EMD Value
₹8 L
Closing Date
27 May 2025, 12:00 pmClosed
The Superintending Engineer, CTC, ATP
Office of the Superintending Engineer, Coal Transportation Circle, Anapra Thermal Project, Anpara, Sonebhadra, UP - 231225
Picking,Shifting/Stacking and Transportation of picked up stones
2025_RVUNL_1030364_1
01/CTD-I/ATP/2025-26
Open Tender
Miscellaneous Works
Fixed-rate
730 days
Anpara Thermal Power Station, Anpara, Sonebhadra
AS PER TENDER SPECIFICATIONS
3 documents required · 3 mandatory
₹2,360
DY CAO, CFA and BO, 2x500MW, BTPS, Anpara
₹8 L
13 Aug 2025
19 Apr 2025
28 May 2025
19 Apr 2025
27 May 2025
19 Apr 2025
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .