Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.2 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹40.9 L+₹1.7 L (4.27%)Rejected-Finance | L2 | Rejected-Finance Rejected |
Tender Value
₹40 L
EMD Value
₹40,000
Closing Date
12 Dec 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director, DRDA
DRDA Coimbatore
TN02- 94 Providing Drain for Main Street and Cross Street 6 to 8 at Srilankan Tamilan Rehabilitation Camp at Aliyar H/O Kottur Town Panchayat
2023_RDTN_395956_1
DIPR/228/Tender/2022Dated 29.11.2023
Open Tender
Civil Works - Others
Item Rate
180 days
DRDA Coimbatore
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹40,000
DRDA Coimbatore
13 Mar 2024
4 Dec 2023
12 Dec 2023
4 Dec 2023
12 Dec 2023
4 Dec 2023
4 Dec 2023
Amount
1.Providing Drain for MainStreet and Cross Street 6 to 8 at Srilankan Tamilan Rehabilitation Camp at Aliyar H/O Kottur Town Panchayat
Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation
centering to sides and soffits including supports and strutting with necessary cross bracing for plain surface
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation
Plastering with CM 1:5 mix to 20mm thick including cost and conveyance and all labour charges etc complete
Supply and fabrication of steel including cost and conveyance of steel to site and all labour charges for Culvert
R.C.C 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site etc. comlete
Earth work excavation for foundation in all clauses of soils and sub soils to full depth with initial lead and lift etc., including levelling the sites complete complying with standard specifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyances of all materials to site and all labour charges for mixing,laying and curing etc complete
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x23/4" including cost and conveyances of all materials to site and all labour charges for mixing,laying and curing etc complete
Supplying and erecting centering shuttering including necessary supports for plane including cost and conveyances of all materials to site and all labour charges etc complete
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyances of all materials to site and all labour charges for mixing,laying and curing etc complete
Plastering with CM 1:5 12 mm thick including cost and conveyances of all materials to site and all labour charges for mixing,laying and curing etc complete
Plastering with CM 1:4 20 mm thick including cost and conveyances of all materials to site and all labour charges for mixing,laying and curing etc complete
Supplying and fixing of 110 mm pvc 4ksc pipe including cost and conveyances of all materials to site and all labour charges etc complete
Supplying of 20 mm size metal from approved quarry including cost and conveyance of all materials to site and all labour charges etc complete
Supplying and Filling 4 to 8mm Chips from approved quarry including cost and conveyance of all materials to site and all labour charges etc complete
Supplying and Fixing Cuddapah slabs 50mm thick incluidng all cost
Name Board
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
PR Construction And Company
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .