Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.9 CrAccepted-AOC | ₹10.9 Cr | 1 | Accepted-AOC 1 |
| 2 | 2₹11.7 CrRejected-AOC 81 ARYA NAGAR ASSANDH ROAD PANIPAT HARYANA 132103 | PANIPAT | HARYANA | 132103 | ₹11.7 Cr | 2 | Rejected-AOC 2 |
Tender Value
₹11.9 Cr
EMD Value
₹23.7 L
Closing Date
20 Jan 2023, 3:00 pmClosed
ARVIND Rohilla
EE PHE Division No. 1 Kaithal
Providing sewerage network, construction of IPS, construction of pump chamber , boundary wall , restoration of water supply connection including operation and Maintenance of 12 months during defect liability period after trail run of 3 months
2023_HRY_253186_1
202332A96035 534F 4182 888D 25526AAF0C26594PUH
Open Tender
Civil Works
2 days
KAUL
Providing sewerage network, construction of IPS, construction of pump chamber , boundary wall , restoration of water supply connection including operation and Maintenance of 12 months during defect liability period after trail run of 3 months
2 documents required · 2 mandatory
₹20,000
₹23.7 L
Yes
16 Mar 2023
10 Jan 2023
20 Jan 2023
10 Jan 2023
20 Jan 2023
10 Jan 2023
Amount
Providing lowering in trenches to correct gradient and alignments jointing with tytone rubber joint and cutting of RCC S/S pipes having inside HDPE lining ISI marked as per IS-458-2003 into trenches for all depths and laying out the same to correct alignment gradients levels etc cutting of concrete beds and joints holes supporting the pipes and specials in corrected position in a suitable rigid manner while the same are being jointed and until the surrounding benchings, haunches and envelops are completed. The pipes shall rest on the beds at all joints through their lengths and to ensure this, testing the pipes for leakage and all defects to the entire satisfaction of the Engineer incharge including all cartage etc complete in all respect 500 mm i/d pipe with inside HDPE lining
Providing lowering in trenches to correct gradient and alignments jointing with tytone rubber joint and cutting of RCC S/S pipes having inside HDPE lining ISI marked as per IS-458-2003 into trenches for all depths and laying out the same to correct alignment gradients levels etc cutting of concrete beds and joints holes supporting the pipes and specials in corrected position in a suitable rigid manner while the same are being jointed and until the surrounding benchings, haunches and envelops are completed. The pipes shall rest on the beds at all joints through their lengths and to ensure this, testing the pipes for leakage and all defects to the entire satisfaction of the Engineer incharge including all cartage etc complete in all respect 600 mm i/d pipe with inside HDPE lining
Supplying and installation of RCC Vent shafts complete in all respect as per satisfaction of the Engineer-in-Charge
Operation and Maintenance of Sewerage System Including IPS for complete scope of work mentioned in the DNIT Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months during defect liability period and 3 months trial run period. (will be charged to the A/mtc estimate). complete in all respects as per approved NIT. Defect liability period (Operation only)
For 1st year (after defect liability period)
For 2nd year (after defect liability period)
For 3rd year (after defect liability period)
For 4th year (after defect liability period)
For 5th year (after defect liability period)
Bidder Name
Amount
SH. ANURAG GOEL CONTRACTOR(GSTN-06AQXPG7772Q1ZN)
Narsingh Goel Contactor(GSTN-06ACTPG3236H1ZK)
SH. ANURAG GOEL CONTRACTOR
SH. ANURAG GOEL CONTRACTOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid