Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Responsive |
| 2 | Accepted-Technical R O VILL GAUNA P O KAROUR TEHSIL NADAUN DISTT HAMIRPUR H P | HAMIRPUR | HIMACHAL PRADESH | 174304 | Accepted-Technical Responsive |
Tender Value
₹82.5 L
EMD Value
₹1.6 L
Closing Date
13 Sept 2026, 6:55 pmClosed
Executive Engineer
Karchham Division HP.PWD., BHabangaar
SH. Providing and Laying 30mm. thick Bituminous Concrete at Km. 0/00 to 4.400.
2026_PWD_142920_1
5189 dated 03.09.2026
Open Tender
Civil Works - Roads
Percentage
90 days
Wantoo
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,000
₹1.6 L
16 Sept 2026
7 Sept 2026
14 Sept 2026
7 Sept 2026
13 Sept 2026
7 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and applying tack coat with Bitumen emulsion confirming to IS:8887 (RS-1) using emulsion pressure distributor including preparing the surface and cleaning with mechanical broom on the prepared dry and hungry bitumnous surface @ 0.25 to 0.30 kg per sqm ( at the rate of zero point twenty five to zero point thirty kilogramme per square metre) as per Technical Specification Clause 503. including hauling of materials in all leads and lifts by all modes of transpotation and as per entire satisfaction and direction of Engineer-in-charge. | 14,091 | Per square meter | 35.15 | ₹4,95,298.65 |
| 2 | Providing and laying 30 mm (thirty millimetre) Bitumen concrete compacted thickness with bitumin of grade VG-10 (ten) @ 5.5 % (at the rate of five point five percent) ( percentage by weight of total mix) and cement filler @ 2 % ( two percent) (percentage by weight of aggregate) including addition of Zycotherem @ 0.10 % (at the rate of zero point ten percent) (percentage by weight of bitumin) prepared in Batch Type Hot Mix Plant of 100-120 (hundred - one hundred twenty) TPH capacity by using crushed aggregates of specified grading ,premixed with bituminous binder and filler transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade ,level and allingment and rolling with smooth wheeled, vibratory and tendam rollers to achieve the desired compaction and density as per specification, complete in all respect including hauling of materials in all leads and lifts by all modes of transpotation and as per entire satisfaction and direction of Engineer-in-charge | 422.73 | Per Cubic meter | 18,335 | ₹77,50,754.55 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.28 MB
BOQ_212271.xls
BOQ • 0.28 MB
SBD.pdf
Tender Documents • 4.70 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .