Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹73,500
Closing Date
22 Oct 2026, 3:00 pm7d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Bengaluru Water Supply And Sewerage Board
Shivakumar Chalawadi
Tender for the work of Providing and laying lead off to the 450mm dia scour valve at 2.6m dia BF valve chamber & HOPD valve chamber under CWSS Stage 775MLD Pumping Station and Reservoir at T.K.Halli (Reserved for Category-I)
BWSSB/2026-27/BD/WORK_INDENT3513
BWSSB/2026-27/BD/WORK_INDENT3513
Reserved
Buildings
Two Tender Document System(Two Cover)
BWSSB Executive Engineer Kaveri One
9 documents required · 9 mandatory
Achieved in at least one financial years an average annual financial turn over should not be less than amount put to tender of Rs.86,61,922/- (Rupees Eighty Six Lakhs Sixty One Thousand Nine Hundred and Twenty Two Only)(Including GST)
Assessed available tender capacity More Than Rs. 86,61,922 (Including GST)
Liquid assets or availability of credit facilities usually 30% of the amount of contract i.e., Rs.25,98,577/-
The Tenderer Should Have Satisfactorily completed at least one similar work such as an extent of Rs.21,65,481/- (Rupees Twenty One Lakh Sixty Five Thousand Four Hundred and Eighty One only)(Including GST)(25%).
Executed in any one year following minimum quantities of work.Earthwork in excavation 1668 cum,Reinforced Cement Concrete 127 Cum,Supplying fitting & placing TMT Fe 550/550D steel 14.77MT,MS pipe of outer dia 457mm & above 16 m length
₹1,840
₹73,500
8 Oct 2026
8 Oct 2026
23 Oct 2026
21 Oct 2026
Tender for the work of Providing and laying lead off to the 450mm dia scour valve at 2.6m dia BF valve chamber & HOPD valve chamber under CWSS Stage 775MLD Pumping Station and Reservoir at T.K.Halli (Reserved for Category-I)
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricadin...
Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricadin...
Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricadin...
Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricadin...
Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricadin...
Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricadin...
Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricadin...
Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricadin...
Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricadin...
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T...
Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding 3. Foundation, Sub structure of Cross drainages.
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by r...
Manufacturing, providing, trasporting, rolling, lowering, laying, jointing and commissioning of ERW (Electric Resistance Welded) /SAW (Submerged Arc Welded) MS pipes of Outer dia (Fe-410 grade) conf...
Providing, fabricaing and fixing at site various diameters of MS Flanges as per IS standards to fix sluice valves as per sketch. The rate to include cost of all materials, labour, consumables, hire ch...
Providing and fixing DI Resilient seated soft sealing SLUICE VALVE of variouis dia. with body bonnet of Ductile Iron (DI) conforming ti IS-1865 with the latest amendments and of grade GGG 40/50, shaft...
Providing and fixing of Extension spindle rods,PN 10 /16 suitable for Gate valve of following dia for open and closing application, Extension Spindle lengths shall be available on required sizes as pe...
Construction of Subgrade and earthen Shoulders Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading,...
A Plant Mix Method
Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers wit...
Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical ...
Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/...
Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding 3. Foundation, Sub structure of Cross drainages.
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS C...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T...
Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding 3. Foundation, Sub structure of Cross drainages.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
DTP lead off.docx
Tender Document • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .