Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-AOC | ₹4.8 L | L1 | Accepted-AOC awarded |
| 2 | Not Admitted-Finance | - | - | Not Admitted-Finance Not qualified for AOC |
| Sl No | Description | Qty | Unit | Sathish Kumar & Co L1 |
|---|---|---|---|---|
| 0.00Improvement works | ||||
| 1.00 | Earthwork excvation and depositing on bank with intial lead of 10m and lift of 2m in hard gravelly soil, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth mixed with samll sized boulders, including cost of all materials, T&P's, labour charges, all lead, lift, etc., complete as per standard specification | 6.5 | 1m3 | 845 ₹5,492.50 |
| 2.00 | Earthwork excvation and depositing on bank with intial lead of 10m and lift of 2m in Soft Disintegrated Rock (SDR), laterite, soft rock or kankar, not requiring blasting including cost of all materials, T&P's, labour charges, all lead, lift, etc., complete as per standard specification | 3.9 | 1m3 | 819 ₹3,194.10 |
| 3.00 | Earthwork excvation and depositing on bank with intial lead of 10m and lift of 2m in MR & DMR not requiring blasting including cost of all materials, T&P's, labour charges, all lead, lift,etc., complete. as per standard specification | 2.6 | 1m3 | 1,040 ₹2,704 |
| 4.00 | Clearing of scrub jungle including cost of all materials, labour charges, leads, lift, etc., complete. | 136 | 1m2 | 1,088 ₹1.5 L |
| 5.00 | Dismantling of stone masonry in cement mortor including cost of all materials, lead, lift, labour charges etc., complete | 2.2 | 1m3 | 2,200 ₹4,840 |
| 6.00 | Plain cement concrete 1:3:6, using 40 mm HBG metal including cost of all materials, labour charges including consolidation, curing, all lead, lift, as per standard specification etc., complete. | 2.2 | 1m3 | 13,200 ₹29,040 |
| 7.00 | Plain cement concrete in CC 1:2:4, using 20mm HBG metal without formwork including cost of all materials, labour charges including consolidation, curing, all lead, lift,etc., complete as per standard specification | 7.1 | 1m3 | 49,700 ₹3.5 L |
| 8.00 | Plain cement concrete in CC 1:2:4, using 20mm HBG metal with formwork including cost of all materials, labour charges including consolidation, curing, all lead, lift, etc., complete as per standard specification | 8.3 | 1m3 | 58,100 ₹4.8 L |
| 9.00 | Disposal of excess surplus earth away in low lying area with a lead of 100 mts including spreading and levelling labour, lead, lift, etc., complete. | 13 | 1m3 | 6,500 ₹84,500 |
Tender Value
₹5.4 L
EMD Value
₹5,500
Closing Date
24 Feb 2026, 2:00 pmClosed
Superintending Engineer
Superintending Engineer, Udumalpet Electricity Distribution Circle, Tirupur Road, Eripalayam, Udumalpet-642 126
Providing chain link fencing around sholayar Nagar section office at Sholayar Nagar, Valparai
2026_EB_659448_1
C.NO.21 /2025-26,dt.17.02.2026
Open Tender
Civil Works
60 days
Sholayar Nagar
Proof for EMD, ESI, EPF, GST Registration copy, other details as per BQR and specification
2 documents required · 2 mandatory
₹0
₹5,500
Yes
6 Mar 2026
17 Feb 2026
25 Feb 2026
17 Feb 2026
24 Feb 2026
17 Feb 2026
Improvement works
Earthwork excvation and depositing on bank with intial lead of 10m and lift of 2m in hard gravelly soil, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth mixed with samll sized boulders, including cost of all materials, T&P's, labour charges, all lead, lift, etc., complete as per standard specification
Earthwork excvation and depositing on bank with intial lead of 10m and lift of 2m in Soft Disintegrated Rock (SDR), laterite, soft rock or kankar, not requiring blasting including cost of all materials, T&P's, labour charges, all lead, lift, etc., complete as per standard specification
Earthwork excvation and depositing on bank with intial lead of 10m and lift of 2m in MR & DMR not requiring blasting including cost of all materials, T&P's, labour charges, all lead, lift,etc., complete. as per standard specification
Clearing of scrub jungle including cost of all materials, labour charges, leads, lift, etc., complete.
Dismantling of stone masonry in cement mortor including cost of all materials, lead, lift, labour charges etc., complete
Plain cement concrete 1:3:6, using 40 mm HBG metal including cost of all materials, labour charges including consolidation, curing, all lead, lift, as per standard specification etc., complete.
Plain cement concrete in CC 1:2:4, using 20mm HBG metal without formwork including cost of all materials, labour charges including consolidation, curing, all lead, lift,etc., complete as per standard specification
Plain cement concrete in CC 1:2:4, using 20mm HBG metal with formwork including cost of all materials, labour charges including consolidation, curing, all lead, lift, etc., complete as per standard specification
Disposal of excess surplus earth away in low lying area with a lead of 100 mts including spreading and levelling labour, lead, lift, etc., complete.
Reinforced cement concrete in C.C. 1:1 ½ :3 mix using 12 to 20mm HBG machine crushed metal for raft footing Column up to GL and above GL including cost of cement, all materials, labour, curing, vibration charges, without shuttering all lead, lift,etc., complete as per standard specification. (but excluding cost of steel reinforcement.) Below G.L
Reinforced cement concrete in C.C. 1:1 ½ :3 mix using 12 to 20mm HBG machine crushed metal for raft footing Column up to GL and above GL including cost of cement, all materials, labour, curing, vibration charges, without shuttering all lead, lift,etc., complete as per standard specification. (but excluding cost of steel reinforcement.) Above G.L
Supplying and fixing in position GI angle of size 75x75x6 mm and 65x65x6mm for corner /intermediate fence post with 2 nos. of 150mm length cleats of size 30x30x5mm angle and back support of 50 x 6mm GI flats , drilling holes in angle and flats at a interval of 25 cm, for 12mm GI bolt of 75mm length with 2 Nos. of nut and 2 Nos. of washer, to hold chain link fencing, including cost of all materials, transportion, labour charges, welding charges, cutting charges, leads and lifts etc., complete and placing in position as directed by Site Engineer.
Supply & fixing of GI 10 gauge Chain link fencing of size 2" x 2", tie with GI flat using GI bolt and nuts at a interval of 25 cm including cost of chain link fencing, labour for fixing, transportation charges, lead, lift, etc., complete
Plastering1:3, 12 mm thick including the cost of all material, cement, labour charges, all lead, lift etc., complete as per standard specification.
Colour washing two coats using cement paint of approved quality over one coat of cement primer including cost of all materials,labour,lead,lift, etc.,complete
Providing Steel reinforcement MS/RTS rods for reinforced concrete works, including cost of steel MS/RTS rods, binding wire, labour charges for cutting, straightening bending as per type design drawing, placing aligning, and tying properly with all leads and lift,etc., complete.
Supplying and fixing of MS gate with suitable angles for Main and wicket gate including two coat of enamel paint over one coat of primer of approved quality and colour, cost of all materials,labour charges of fabrication, fixing, lead, lift, etc., complete.
SGST to be quoted in percentage (value alone), Ex.9%, it should be entered as 9 only
CGST to be quoted in percentage (value alone), Ex.9%, it should be entered as 9 only
Inter-State GST @ 18% for other than Tamil Nadu supplier. If the contractor is within Tamilnadu may be quoted as "0" only
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
BOQ_791193.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid