Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹23.0 Laccepted-aoc | accepted-aoc |
Tender Value
₹25.8 L
EMD Value
₹25,800
Closing Date
6 Mar 2026, 5:00 pmClosed
SE/IC/Jangaon
O/o SE/IC/Jangaon, Devadula Buildings, Wadlakonda Road, Jangaon
Repairs to Mott to feed Malkapur Cheruvu, Malkapur(V), Chilpur(M), Jangaon District
681357
13/2025-26, Dated:18.02.2026
OPEN
Fabrication and Erection of Structural Steel
JANGOAN, TELANGANA
11 documents required · 11 mandatory
₹913
₹25,800
21 Mar 2026
20 Feb 2026
20 Feb 2026
Fabrication, supply, erection, testing and commissioning of Embedded parts consisting of sil beam, slide tracks, eal seats, Guide plates etc. with all accessories including cost of all materials, machinery, labour, etc. complete as per specifications and approved drawings. (without painting on mechanical cleaning surfaces which are added extra as per schedule of rates under items in this chapter and add as applicable separately) Labour Component (including contractor's profit and Overheads)
Fabrication, supply, erection, testing and commissioning of Sluice Shutters consisting of skin plate, horizontal and vertical angles, stiffeners, rubber seals, clamps with all accessories for sluice shutters including cost of all materials, machinery, labour, seal fixing etc., complete as per specifications and approved drawings (without painting on mechanical cleaning surfaces which are added extra as per schedule of rates under items in this chapter and add as applicable separately) Labour Component (including contractor's profit and Overheads)
Fabrication, supply, erection, testing and commissioning of Embedded parts consisting of supporting structure, platform etc. with all accessories for operating canal escape/ regulator gate with all accessories including cost of all materials, machinery, labour, cutting, bending, aligning, anchoring, welding, finishing etc. complete as per Specification and approved drawings (without painting on mechanical cleaning surfaces which are added extra as per schedule of rates under items in this chapter and add as applicable separately) Labour Component (including contractor's profit and Overheads)
Clearing thick jungle growth ( less than 50 percent open space ) including bushes upto 30 cm / parthenium and other weeds including burning or disposing off the same as directed etc., complete etc., complete. Output of 5 mazdoors per day
Providing homogeneous embankment using soil from approved borrow area in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transportation, spreading soil in layer of specified thickness, breaking clods, sectioning, watering, compacting to dencity control of not less than 95 percent or as stipulated using Sheep foor roller / vibratory roller / 8 to 10 tonne power roller etc., complete with initial lead upto 1 Km and all lifts
E.M Parts OF ALL TYPES OF GATES Surface cleaning of metal surfaces by chemical cleaners and then by hand and power tool cleaners and removing dust. After cleaning,applying primary coat with one coat of Protective Mastic to athickness of 70+5 microns, followed by finishing coats 2 coats with coal tar epoxy each coat with a DFT of 150+5 microns and total DFT of all coats including Primary coat should not be less than 350 microns with material, labour and all accessories with all leads and lifts (in respect of Heavily rusted (30 to 40% rusted) surfaces)
HOIST BRIDGES, HOISTING EQUIPMENT AND CRANES Etc, Surface cleaning of metal surfaces by chemical cleaners and then by hand and power tool cleaners and removing dust. After cleaning,applying primary coat with two coats of Zinc chromite red oxide primer, followed by finishing coats 3 coats with synthetic enamel paint with material, labour,and all accessories with all leads and lifts where surface cleaning by sand blasting is not feasible and based on specific recommendations of designers, it is to adopt surface preperation done manually by hand and power tool after cleaning by chemical treatment to remove grease, rust, scaling etc., and to form phasphate coating to prevent further rusting, before applying primer painting.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
13 BOQ.xls
TENDER_DOCUMENT • 0.59 MB
Bid Document.docx
TENDER_DOCUMENT • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .