Tender Value
₹23.7 L
EMD Value
₹47,400
Closing Date
4 Jan 2023, 4:00 pmClosed
executive engineer const. div.Leh
Office of the executive engineer const. div.Leh
Constuction of side drain and shoulder filling in PMGSY road Stok
2022_PWD_8715_2
118 of CDL leh of 2022-23
Open Tender
Civil Works - Roads
Item Rate
20 days
Leh
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Payable To Executive Engineer Const.div. Leh
₹47,400
Yes
30 Jan 2023
14 Dec 2022
6 Jan 2023
15 Dec 2022
4 Jan 2023
15 Dec 2022
Amount
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer All kinds of soil
Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m in all kinds of soil:
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. Columns, pillars, piers, abutments, posts and struts.
Dumping stone for soling including cost of stone.
Carriage of material by way source to site including loading. Unloading all complete job. a)Cement an avg lead 28 km
b)Sand avg lead 15 km
c)Aggregate avg lead---10km
e)Earth avg lead 03 km.
d)Soling stone avgerage lead 10 km.
M/S MANZOOR HUSSAIN
M/S PHUNTSOG NURBOO
M/S TASHI NURBOO
M/S RIGZIN NURBOO GOVT CONTRACTOR
M/S MOHD ALI GOVT CONTRACTOR
M/S NAMGAIL DORJEY
M/S ALI HUSSAIN GOVT CONTRACTOR
M/S DORJAY NAMGAIL
M/S ARIF UL ASKARE GOVT CONTRACTOR
M/S AHMAD KHAN GOVT CONTRACTOR
M/S GHULAM HASSAN
M/S TSEWANG STANZIN GOVT CONTRACTOR
M/S TSEWANG PHUNTSOG GOVT CONTRACTOR
M/S THUPSTAN SKALZANG
M/S TSERING STOBDAN
M/S NILZA ANGMO GOVT CONTRACTOR
M/S CHEMAT GYATSO
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .