Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.8 LAccepted-AOC H NO 02 SAGAR ROAD OPPO MKD GIRLS SCHOOL TILAK NAGAR BIKANER 334001 | BIKANER | BIKANER | RAJASTHAN | 334001 | L1 | Accepted-AOC BEING LOWEST BIDDER | |
| 2 | L2₹38.5 L+₹2.7 L (7.55%)Rejected-AOC WARD NO 02 LAKHUWALI PO THE PILIBANGAN DISTT HANUMANGARH RAJASTHAN 335803 | HANUMANGARH | RAJASTHAN | 335803 | L2 | Rejected-AOC OTHER THAN LOWEST BIDDER | |
| 3 | L3₹38.8 L+₹3.1 L (8.55%)Rejected-AOC | L3 | Rejected-AOC OTHER THAN LOWEST BIDDER | |
| 4 | L4₹39.1 L+₹3.3 L (9.16%)Rejected-AOC | L4 | Rejected-AOC OTHER THAN LOWEST BIDDER | |
| 5 | L5₹40.5 L+₹4.7 L (13.1%)Rejected-AOC | L5 | Rejected-AOC OTHER THAN LOWEST BIDDER |
| Sl No | Description | Qty | Unit | BANSAL BROTHERS | Gill Construction Co | PACHAR BROTHERS | SHREE GURU NANAK CONSTRUCTION COMPANY | J AND K CONSTRUCTION CO | BISHNOI BUILDERS |
|---|---|---|---|---|---|---|---|---|---|
| .10Notes:- (i) 100 percent nonperishable items of the work shall be deposited by the L1 bidder within 30 days after placing of work order. (ii) The critical path network shall be submitted by L1 bidder immediately after the acceptance of tender and approved by GE. (iii) The bidders must ensure to visit the site, check relevant documents and makes of materials required to be incorporated under the subject from concern Engineer-in-Charge. (iv) Material obtained from demolition/dismantled and the serviceable material (other than reused in the work) shall be the property of the Govt and shall be removed and deposited in the MES Store Yard without any extra cost to Govt. (v) In case of non-availability of any make mentioned under list of Makes, the L1 Bidder shall obtain non-availability / non-manufacturing certificate from the concern OEM / authorised dealers and submitted to Accepting Officer, the L1 bidder may be incorporated Group-I category makes as approved by HQ CE SWC Jaipur / HQ CE BTZ in the works after prior approval of Accepting Officer. (vi) L1 Bidder shall produce E-way bill alongwith test certificate from OEM / manufacturer for costly items / major items of amount above Rs 50,000/- along with RAR’s and Final Bill. (vii) L1 Bidder shall be maintained an album containing Photos of all the material brought at site and each stage wise work progress and kept at site. Same shall be deposited in Engineer-in-Charge office after completion of work. (viii) The cost of all the above provisions shall be deemed to be included in the quoted rate of bidder, nothing extra shall be paid to the bidder. | |||||||||
| 1.00 | Demolition of plain cement concrete in ground floor and pavings not exc 15 cm thick (below or above ground level) of any description complete all as specified and directed by Engineer-in-charge. | 92.5 | Cubic Metre | 18,500 ₹18,500 | 8,325 ₹8,325 Lowest | 27,750 ₹27,750 | 20,442.5 ₹20,442.5 | 13,875 ₹13,875 | 18,500 ₹18,500 |
| 2.00 | Demolition of brick work, built in cement mortar or cement lime mortar including all quoins, arches, pillars, etc but excluding ashlar facings, dressed stonework and precast concrete articles complete all as specified and directed by Engineer-in-charge. | 70 | Cubic Metre | 14,000 ₹14,000 | 5,600 ₹5,600 Lowest | 21,000 ₹21,000 | 15,470 ₹15,470 | 10,500 ₹10,500 | 14,000 ₹14,000 |
| 3.00 | Excavation in post holes (or similar holes) in loose/ soft soil each not exceeding 0.5 cum, getting out, returning, filling in and ramming earth or broken rubble mixed with earth around, in layers not exeeding 25cm, watering and removing surplus soil to a distance not exceeding 50m and making good surface complete all as specified and as directed | 230 | Each | 23,000 ₹23,000 | 16,100 ₹16,100 Lowest | 18,400 ₹18,400 | 17,710 ₹17,710 | 16,100 ₹16,100 Lowest | 16,100 ₹16,100 Lowest |
| 4.00 | Dismantling posts or struts ( wood, steel or RCC) embedded in concrete, brick work etc, any section and any length including taking out embedded portion and making good disturbed ground complete all as specified and directed by Engineer-in-Charge.
Note :- Dismantling of existing galvanised iron steel barbed wire/ chain link fencing shall be measured and paid for separately | 460 | Running Metre | 23,000 ₹23,000 | 12,880 ₹12,880 | 9,200 ₹9,200 | 5,060 ₹5,060 Lowest | 23,000 ₹23,000 | 35,420 ₹35,420 |
| 5.00 | Taking down cement plaster or cement lime plaster on stone surface/brick surfaces of walls including raking out joints hacking for key scrubbing down with water etc complete all as specified and directed by Engineer-in-charge. | 300 | Square metre | 9,000 ₹9,000 | 3,000 ₹3,000 Lowest | 3,000 ₹3,000 Lowest | 3,300 ₹3,300 | 6,300 ₹6,300 | 8,100 ₹8,100 |
| 6.00 | Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth in soft & loose soil complete all as specified. | 25 | Cubic Metre | 5,000 ₹5,000 | 2,225 ₹2,225 Lowest | 3,750 ₹3,750 | 3,750 ₹3,750 | 2,500 ₹2,500 | 5,000 ₹5,000 |
| 7.00 | Removal of excavated soil/ material to a distance exc 250 metre but not exc 500 meter and depositing where directed at a level not exc 1.50 metre above the starting point complete all as specified and directed by Engineer-in-charge. | 25 | Cubic metre | 2,500 ₹2,500 | 1,000 ₹1,000 | 2,000 ₹2,000 | 275 ₹275 Lowest | 1,250 ₹1,250 | 3,000 ₹3,000 |
| 8.00 | M&L for 50 mm thick cement concrete 1:2:4 type B-1 using 20mm graded stone aggregate in any thickness,in flooring/hardstanding laid in alternate panels including all necessary formwork and vibrator to be used complete all as specified & directed .
Note:- Joints shall be filled with ashphaltic joint fillers complete and quoted rates deemed to be included in item nothing extra shall be paid. | 500 | Square metre | 50,000 ₹50,000 | 1,22,000 ₹1,22,000 | 1,20,000 ₹1,20,000 | 10,500 ₹10,500 Lowest | 1,50,000 ₹1,50,000 | 1,00,000 ₹1,00,000 |
| 9.00 | M&L for hardcore of broken bricks, gauge not exc. 63mm, deposited, spread and leveled in layers not exc 15 cm thick, watered and rammed to a true surface complete all as specified and directed by Engineer-in-charge. | 20 | Cubic Metre | 5,000 ₹5,000 Lowest | 14,200 ₹14,200 | 24,000 ₹24,000 | 23,000 ₹23,000 | 44,000 ₹44,000 | 27,540 ₹27,540 |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
4 Oct 2025, 6:00 pmClosed
GE (A) Suratgarh
GE Army Suratgarh Mil Stn Suratgarh
REPAIR TO FENCING, COMPOUND WALL, PATHS, HARD STANDING AND CONNECTED B/R WORK IN THE AOR OF AGE B/R-I UNDER GE (A) SURATGARH AT SURATGARH MIL STN
2025_MES_729525_1
GE (A) SOG Token No 35/25-26
Open Tender
Civil Works
Item Rate
120 days
Suratgarh
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GE (A) Suratgarh
₹80,000
Yes
10 Nov 2025
4 Sept 2025
6 Oct 2025
4 Sept 2025
4 Oct 2025
21 Sept 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .