| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹5.6 CrAccepted-AOC KUKUHAWA POST GAURABADSHAHPUR JANPAD JAUNPUR | ₹5.6 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹5.6 Cr+₹2.4 L (0.42%)Rejected-Finance | ₹5.6 Cr+₹2.4 L (0.42%) | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹6.6 Cr+₹1.1 Cr (18.9%)Rejected-Finance | ₹6.6 Cr+₹1.1 Cr (18.9%) | L-3 | Rejected-Finance L-3 |
| Sl No | Description | Qty | Unit | M/s Bansal Construction L3 | M/S ARUN CONSTRUCTION L2 | VIJAY KUMAR SINGH L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work to remove stones and debris/Malva that fell from the hill on L/B of canal including all lead, lift,labour and T&P etc.required for proper completion of work. | 376 | m3 | 425 ₹1,59,800 | 250 ₹94,000 Lowest | 381.9 ₹1,43,594.4 |
| 2.00 | Exacavating hard rock by controll blasting including all lead, lift,labour and T&P etc.required for proper completion of work. | 4,952 | m3 | 1,520 ₹75,27,040 | 1,100 ₹54,47,200 Lowest | 1,276.43 ₹63,20,881.36 |
| 3.00 | Drilling 35 mm dia. holes up to 5.00 M deep @ 1.50M. C/C both way in staggered form including cost of all material labour and T&P etc.required for proper completion of work. | 13,200 | RM | 545 ₹71,94,000 | 700 ₹92,40,000 | 460.62 ₹60,80,184 Lowest |
| 4.00 | Drilling 50 mm dia. Drainage Holes up to 5.00 Mtr. deep @ 3.65M. C/C both way in staggered form including cost of all material labour and T&P etc.required for proper completion of work. | 2,250 | RM | 675 ₹15,18,750 | 700 ₹15,75,000 | 569.5 ₹12,81,375 Lowest |
| 5.00 | Furnishing and installing 25 mm dia. Bar in rock bolt upto 5.00 Mtr.depth in drill hole including cost of all material labour,T&P etc.with all lead & lifts required for proper completion of work. | 13,200 | RM | 960 ₹1,26,72,000 | 1,200 ₹1,58,40,000 | 807.43 ₹1,06,58,076 Lowest |
| 6.00 | Furnishing and installing 40 mm perforated pipes and pipe fittings in grout/drainage holes including cost of all material labour,T&P etc.with all lead & lifts required for proper completion of work. | 2,550 | RM | 685 ₹17,46,750 | 650 ₹16,57,500 | 576.57 ₹14,70,253.5 Lowest |
| 7.00 | Welded wire mesh (size 100 mm x 100 mm x 3.00 mm dia. wire) including cost of all material labour and T&P etc.with all lead & lifts required for proper completion of work. | 5,760 | m2 | 225 ₹12,96,000 | 141 ₹8,12,160 Lowest | 191.2 ₹11,01,312 |
| 8.00 | Shotcreting on surfaces average 20 cm.thick including cost of all material labour and T&P etc. required for proper completion of work. | 16,128 | Bag | 2,130 ₹3,43,52,640 | 1,330 ₹2,14,50,240 Lowest | 1,787.18 ₹2,88,23,639.04 |
Tender Value
Refer Docs
EMD Value
₹13.4 L
Closing Date
6 Nov 2025, 2:00 pmClosed
Superintending Engineer, B S C C C-2 Mzp
Superintending Engineer, Bansagar Canal Construction Circle-2 Mirzapur
Slope stabilization (shotcrerting) work at left bank hill between Km. 11.050 to 11.230 of Bansagar feeder canal
2025_UPIDC_1085444_2
06/SE/2025-26
Open Tender
Civil Works
Item Rate
365 days
Sidhi, MP
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹13.4 L
17 Dec 2025
27 Oct 2025
6 Nov 2025
27 Oct 2025
6 Nov 2025
28 Oct 2025
Amount
Earth work to remove stones and debris/Malva that fell from the hill on L/B of canal including all lead, lift,labour and T&P etc.required for proper completion of work.
Exacavating hard rock by controll blasting including all lead, lift,labour and T&P etc.required for proper completion of work.
Drilling 35 mm dia. holes up to 5.00 M deep @ 1.50M. C/C both way in staggered form including cost of all material labour and T&P etc.required for proper completion of work.
Drilling 50 mm dia. Drainage Holes up to 5.00 Mtr. deep @ 3.65M. C/C both way in staggered form including cost of all material labour and T&P etc.required for proper completion of work.
Furnishing and installing 25 mm dia. Bar in rock bolt upto 5.00 Mtr.depth in drill hole including cost of all material labour,T&P etc.with all lead & lifts required for proper completion of work.
Furnishing and installing 40 mm perforated pipes and pipe fittings in grout/drainage holes including cost of all material labour,T&P etc.with all lead & lifts required for proper completion of work.
Welded wire mesh (size 100 mm x 100 mm x 3.00 mm dia. wire) including cost of all material labour and T&P etc.with all lead & lifts required for proper completion of work.
Shotcreting on surfaces average 20 cm.thick including cost of all material labour and T&P etc. required for proper completion of work.
M/S ARUN CONSTRUCTION (BID ID -5652874)
M/s Bansal Construction (BID ID -5653380)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
Tender_Document_Lot_2.pdf
Tender Documents • 3.72 MB
BOQ_1989317.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .