Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹14.9 LAdmitted-Finance | -53.49% | ₹14.9 L | L1 | Admitted-Finance |
| 2 | L2₹15.0 LAdmitted-Finance | -53.22% | ₹15.0 L | L2 | Admitted-Finance |
| 3 | L3₹17.0 LAdmitted-Finance BASHAT CHENANI TEH CHENANI DISTT UDHAMPUR | UDHAMPUR | JAMMU AND KASHMIR | 182101 | -46.88% | ₹17.0 L | L3 | Admitted-Finance |
| 4 | L4₹18.6 LAdmitted-Finance | -41.88% | ₹18.6 L | L4 | Admitted-Finance |
| 5 | L5₹20.4 LAdmitted-Finance | -36.13% | ₹20.4 L | L5 | Admitted-Finance |
Updated dates
Tender Value
₹32 L
EMD Value
₹64,000
Closing Date
15 Apr 2026, 4:00 pmClosed
Executive Engineer PMGSY Division Doda
Office of the Executive Engineer PMGSY Division Doda
As per NIT/BOQ
2026_JKRRD_147145_1
E NIT 32 of 2025-26 PMGSY/D/2117-28 Dated 30/03/2026
Open Tender
Civil Works - Roads
45 days
PMGSY Division Doda
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer PMGSY Division Doda
₹64,000
24 Apr 2026
31 Mar 2026
16 Apr 2026
31 Mar 2026
15 Apr 2026
31 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil | |||||
| 1.1 | All kinds of soil | 1 | Cum | - | - |
| 1.2 | Ordinary Rock. | - | Cum | - | - |
| 2Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. | |||||
| 2.01 | All kinds of soil : | 1 | Cum | - | - |
| 2.02 | Ordinary Rock | - | Cum | - | - |
| 3Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: | |||||
| 3.01 | 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 1 | Cum | - | - |
| 3.02 | 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | - | Cum | - | - |
| 3.03 | 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | - | Cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_228886.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid