| 1 | 1₹56.0 LAccepted-AOC VPO DODA SHRI MUKATSAR SAHIB | ₹56.0 L | 1 | Accepted-AOC LOWEST QUOTED RATE AND SINGLE BIDDER |
Tender Value
₹59.0 L
EMD Value
₹1.2 L
Closing Date
1 Apr 2026, 5:00 pmClosed
DSCO Bathinda
DSCO Bathinda
Earth work for excavation of Trenches for laying of Under Ground pipe Line, lowering and jointing of different Dia RCC Pipe
2026_DOA_163266_3
DSWC/BAT/2025-2026/04
Open Tender
Pipe Laying Works
365 days
Bathinda
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,500
Yes
₹1.2 L
Yes
8 May 2026
26 Mar 2026
2 Apr 2026
26 Mar 2026
1 Apr 2026
26 Mar 2026
Rates of Civil Works
Name of Firm/Bidder
Address of Firm/Bidder
Phone No. of Bidder Email id of Bidder
Total Estimated Amount of Works Rs 5903684
Quoted By Contractor (AS % less of Estimated Amount) Less (-%)
Name of Work1 :- Earth work for excavation of Trenches for laying of Under Ground pipe Line, lowering and jointing of 500mm Dia RCC Pipes, cutting of 500mm RCC pipes for 500mm AAV and cutting of 150mm RCC pipes for AVP, fixing of AVP, fixing of 500mm AAV,fixing of 800mm pump stand fixing of 500mm gate valves at Project Mogha no. 27278/L, Vill. Ganga, Teh. Bathinda, Distt Bathinda.
Work-1, Part - A
Sr. No. Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
1 Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters as per PWD specifications. 10257.75 /m3 93.78 Rupees Ninety Three and Seventy Eight Paise Only
2 Lowering & Laying of 500mm R.C.C. Class Np-2 Pipes in to trenches for all depths and laying out the same to correct alignment, gradients level etc as per PWD specifications. 5820 / Mtr 71 Rupees Seventy One Only
3 Jointing of 500mm class NP-2 R.C.C pipes in trenches using collar joints jointed as per specifications including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge as per PWD specifications including material like Cement, Sand etc. 2328 /Joints Rupees Two Hundred Seventy Five and Two hundred Ninety Seven Paisa Only
4 Fixing of 500mm Risers & Alfa valves as per specifications including material like Cement, Sand, Bajri etc. 62 /Riser & Valve 1129.781 Rupees One Thousand one Hundred Twenty Nine and Seventy Eight Paise Only
5 Fixing of 150mm Air vent Pipes as per specifications including material like Cement, Sand, Bajri etc. 30 /Air pipe 284.78 Rupees Two Hundred Eighty Four and Seventy Eight Paise Only
7 Fixing of Gate Valves of 500mm diameter as per specification including material like Cement, Sand, Bajri etc. 11 /No. 0.800 Rupees Two Thousand Five Hundred Thirteen and Two Hundred Forty Two Paise Only
8 Cutting reinforcement, Concrete pipes, chipping & finishing the cut surface to a uniform the satisfaction of site incharge (500 mm) as per PWD specifications. /Cut hole 127 Rupees One Hundred Twenty Seven Only
9 Cutting reinforcement, Concrete pipes, chipping & finishing the cut surface to a uniform the satisfaction of site incharge (150 mm) as per PWD specifications. 30 /Cut hole 41 Rupees Forty One Only
10 Carriage of 500 m.m RCC (0.5-1 km) 877 Per Tonne 0.9 Rupees One Hundred Ninety Nine and Two Paise Only
Work1, Part - B
Charges for Silt Collecting Tanks/Haudis
1 Earth work in Excavtion as per PWD specifications. 19.36 /cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
2 B.B.C 1:8:16 as per PWD specifications. 2.43 /cum 5534.302 Rupees Five Thousand Five Hundred Thirty Four and Three Paise Only
3 Plain Cement Concrete 1:2:4 in flooring as per PWD specifications. 2.14 /cum Rupees Four Thousand Nine Hundred Seventy Four and Seventy Five Paise Only
4 Reinforced Cement Concrete 1:2:4 as per PWD specifications 0.94 /cum 18293.28 Rupees Eighteen Thousand Two Hundred Ninety Three and Twenty Eight Paise Only
5 First Class burnt brick work laid in Cement sand mortar in 1:5 in foundation and plinth as per PWD specifications. 0.999 /cum 0.200 Rupees Four Thousand Eight Hundred Twenty Six and Five Hundred Twenty Eight Paise Only
6 10 mm thick cement plaster work 1:3 as per PWD specifications. 103.32 /m2 185.69 Rupees One Hundred Eighty Five and Sixty Nine Paise Only
7 Supply and Fixing of Silting Tank Steps 16 No 119.08 Rs One hundred Nineteen & zero eight Paise Only
Total Work 1 (A+B)
Say Total Work-1 2463180
Name of Work1 :- Earth work for excavation of Trenches for laying of Under Ground pipe Line, lowering and jointing of 600mm Dia RCC Pipes, cutting of 600mm RCC pipes for 600mm AAV and cutting of 150mm RCC pipes for AVP, fixing of AVP, fixing of 600mm AAV, fixing of 600mm gate valves at Project Mogha no. 375300/L, Vill. Gobindpura, Teh. Bathinda, Distt Bathinda.
Work-2, Part - A
Sr. No. Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
1 Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters as per PWD specifications. 487.68 /m3 93.78 Rupees Ninety three point seven eight Only
2 Lowering & Laying of 600mm R.C.C. Class Np-2 Pipes in to trenches for all depths and laying out the same to correct alignment, gradients level etc as per PWD specifications. 254 / Mtr 74 Rupees Seventy four Only
3 Jointing of 600mm class NP-2 R.C.C pipes in trenches using collar joints jointed as per specifications including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge as per PWD specifications including material like Cement, Sand etc. 101.6 /Joints 336 Rupees Three hundred thirty six Only
4 Fixing of 600mm Risers & Alfa valves as per specifications including material like Cement, Sand, Bajri etc. 3 /Riser & Valve 1241 Rupees One thousand, two hundred forty one Only
5 Fixing of 150mm Air vent Pipes as per specifications including material like Cement, Sand, Bajri etc. 3 /Air pipe 286 RupeesTwo hundred eighty six Only
6 Cutting reinforcement, Concrete pipes, chipping & finishing the cut surface to a uniform the satisfaction of site incharge (600 mm) as per PWD specifications. 3 /Cut hole 150 Rupees One Hundred fifty Only
7 Cutting reinforcement, Concrete pipes, chipping & finishing the cut surface to a uniform the satisfaction of site incharge (150 mm) as per PWD specifications. 3 /Cut hole 41 Rupees Forty One Only
Work 2, Part - B
Charges for Silt Collecting Tanks/Haudis
1 Earth work in Excavtion as per PWD specifications. 4.84 /cum 93.78 Rupees Ninety three point seven eight Only
2 B.B.C 1:8:16 as per PWD specifications. 0.73 /cum 5526 Rupees Five thousand, five hundred twenty six Only
3 Plain Cement Concrete 1:2:4 in flooring as per PWD specifications. 0.84 /cum 5036 Rupees Five thousand thirty six Only
4 Reinforced Cement Concrete 1:2:4 as per PWD specifications 0.29 /cum 5449.34 Rupees Forty eight thousand, one hundred eighty six Only
5 First Class burnt brick work laid in Cement sand mortar in 1:5 in foundation and plinth as per PWD specifications. 5.64 /cum 4812 Rupees Four Thousand Eight Hundred Eighty Six and zero two Paise Onlyt
6 10 mm thick cement plaster work 1:3 as per PWD specifications. 26 /m2 185 Rupees One hundred eighty five Only
7 Supply and Fixing of Silting Tank Steps 4 No 119 Rs One hundred nineteen Only
Total Work-2 (A +B)
Name of Work-1 Earth work excavation of Trenches for laying of Underground pipeline, lowering and jointing of 250mm Dia RCC Pipes, cutting of 250mm RCC pipes for 250mm AAV and cutting of 150mm RCC pipes for AVP, fixing of AVP , fixing of 250mm AAV and 450mm pumpstand at Project of Harjas Singh S/o S. Sarabjeet Singh & Etc Vill. Balloh, Teh. Ballianwali, Distt Bathinda.
Sr. No. Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
1 Earth work excavation for trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated soil clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters as per PWD specifications. 411.34 /m3 93.78 Rupees Ninety three and seventy eight Only
2 Lowering & Laying of 250mm R.C.C. Class Np-2 Pipes in to trenches for all depths and laying out the same to correct alignment, gradients level etc as per PWD specifications. 358 / Mtr 70 Rupees Seventy Only
3 Jointing of 250mm class NP-2 R.C.C pipes in trenches using collar joints jointed as per specifications including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge as per PWD specifications including material like Cement, Sand etc. 142 /Joints 92 Rupees Ninety Two only
4 Fixing of 250mm Risers as per specifications including material like Cement, Sand, Bajri etc. 6 /Riser 375 Rupees Three hundred seventy five only
5 Fixing of 250mm Alfa valves as per specifications including material like Cement, Sand, Bajri etc. 6 / Valve 62 Rupees Sixty two only
6 Fixing of 150mm Air vent Pipes as per specifications including material like Cement, Sand, Bajri etc. 4 /Air pipe 234.99 Rupees Three hundred eleven and Twenty five paise
7 Cutting reinforcement, Concrete pipes, chipping & finishing the cut surface to a uniform the satisfaction of site incharge (250 mm) as per PWD specifications. 6 /Cut hole 62 Rupees Sixty two Only
8 Cutting reinforcement, Concrete pipes, chipping & finishing the cut surface to a uniform the satisfaction of site incharge (150 mm) as per PWD specifications. 4 /Cut hole 41 Rupees Forty One Only
9 Fixing of 450mm pump stand as per specifications including material like Cement, Sand, Bajri etc. 2 no. 1268.32 Rupees one thousand two hunderd sixty eight and thirty two Only
Say Total Work-3 83334
Name of Work- Earthwork excavation of trenches for laying of underground pipeline, lowering and jointing of 400mm RCC pipes, fixing of 150mm air vent pipes and 400mm risers and civil work etc. of project as per given below Outlet No 1000/R, Bhaini Rajbaha,Village Sidhana Tehsil -Phul District Bathinda
Work-4 Part - A
Sr. No. Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
1 Earth work excavation for trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated soil clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters as per PWD specifications. 13513.5 /m3 93.78 Ninety three Rupees and Seventy Eight paisa Only
2 Lowering & Laying of 400mm R.C.C. Class Np-2 Pipes in to trenches for all depths and laying out the same to correct alignment, gradients level etc as per PWD specifications. 9100 / Mtr 71 Seventy one Rupees Only
3 Lowering & Laying of 400mm R.C.C. Class Np-2 Pipes in to trenches for all depths and laying out the same to correct alignment, gradients level etc as per PWD specifications. 895 /per ton 164.16 One Hundered Sixty Four Rupees and Sixteen paisa Only
4 Jointing of 400mm class NP-2 R.C.C pipes in trenches using collar joints jointed as per specifications including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge as per PWD specifications including material like Cement, Sand etc. 3640 /Joints 209.72 Two Hundered Nine Rupees and Seventy Two paisa Only
5 Fixing of 400mm Risers & Alfa valves as per specifications including material like Cement, Sand, Bajri etc. 62 /Riser & Valve 706.24 Seven Hundered Six Rupees and Twenty Four paisa Only
6 Fixing of 400mm Gatevalves valves as per specifications including material like Cement, Sand, Bajri etc. 10 /Gatevalve Two Thousand Fifty One Rupees and Twenty Four paisa Only
7 Fixing of 150mm Air vent Pipes as per specifications including material like Cement, Sand, Bajri etc. 38 /Air pipe 286.93 Two Hundered Eighty Six Rupees and Ninety Three paisa Only
8 End Clousers 400mm with C.C 1:2:4 as per specifications 15 /No. One Hundered Forty Nine Rupees and Eighty Paisa Only
9 L and T Joint for Bends 10 /No. 487.24 Three Hundered Eighty Seven Rupees and Ninety Four paisa Only
10 Cutting reinforcement, Concrete pipes, chipping & finishing the cut surface to a uniform the satisfaction of site incharge (150 mm) as per PWD specifications. 38 /Cut hole 41 Forty one Rupees Only
11 Cutting reinforcement, Concrete pipes, chipping & finishing the cut surface to a uniform the satisfaction of site incharge (400 mm) as per PWD specifications. 62 /Cut hole 105 One Hundered Five Rupees Only
Work-4, Part - B
Charges for Silt Collecting Tanks/Haudis
1 Earth work in Excavtion as per PWD specifications. 54 /cum 93.78 Ninety three Rupees and Seventy Eight paisa Only
2 B.B.C 1:4:8 as per PWD specifications. 5.47 /cum Four Thousand Nine Hundered Forty Four Rupees and Forty paisa Only
3 Plain Cement Concrete 1:2:4 in flooring as per PWD specifications. 4.74 /cum 5022.54 FiveThousand Twenty Two Rupees and Fifty Four Paisa Only
4 Reinforced Cement Concrete 1:2:4 as per PWD specifications 2 /cum 8922.09 Eight Thousand Nine Hundered twenty Two Rupees and Nine paisa Only
5 First Class burnt brick work laid in Cement sand mortar in 1:5 in foundation and plinth CSR 11.5 as per PWD specifications. 37.34 /cum 4823.22 Four Thousand Eight Hundered Twenty Three Rupees and Twenty Two paisa Only
6 10 mm thick cement plaster work 1:3 CSR 15.5 as per PWD specifications. 195.66 /m2 185.24 One Hundered Eighty Five Rupees and Twenty Four paisa Only
7 Supply and Fixing of Silting Tank Steps 54 /No. 119.08 One Hundered Nineteen Rupees and Eight paisa Only
Gross Total Part A and Part B
Gross Total WORK 4.(Say)
Amount In Words: Thirty Two Lakh Nine Thousand Six Hundered Thirty One Rupees Only.
Grand Total of 1 to 4 works
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
SBD04.pdf
Tender Documents • 1.15 MB
FINBID1.xls
Additional Documents • 0.06 MB
Download all tender documents and submit your bid