Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹17.5 LAdmitted-Finance 0 BUDKIYA DEVATRA JODHPUR RAJASTHAN 342606 | JODHPUR | RAJASTHAN | 342606 | -28.55% | ₹17.5 L | L1 | Admitted-Finance |
| 2 | L2₹19.7 L+₹2.3 L (13.1%)Admitted-Finance | -19.21% | ₹19.7 L+₹2.3 L (13.1%) | L2 | Admitted-Finance |
| 3 | L3₹21.2 L+₹3.7 L (21.3%)Admitted-Finance DELHI ALWAR ROAD SADDIQ NAGAR DISTRICT NUH 122107 | NUH | HARYANA | 122107 | -13.33% | ₹21.2 L+₹3.7 L (21.3%) | L3 | Admitted-Finance |
| 4 | L4₹22.3 L+₹4.8 L (27.5%)Admitted-Finance | -8.88% | ₹22.3 L+₹4.8 L (27.5%) | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
Tender Value
₹24.4 L
EMD Value
₹48,880
Closing Date
21 May 2026, 6:00 pmClosed
Commissioner Municipal Council Sardarshahar
Commissioner Municipal Council Sardarshahar
REPAIRING WORK OF NALA FROM BAPA SEVA SADAN MAIN BIKANER ROAD TO DHRUV STONE AT WARD NO 18 SARDARSIHAHR
2026_DLB_558068_1
ENIT_08_2026_27_SDSR_SNO_4
Open Tender
Civil Works
Percentage
120 days
Sardarshahar
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
As per NIT
₹48,880
Yes
11 Jun 2026
12 May 2026
25 May 2026
12 May 2026
21 May 2026
12 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, tetaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, Incuding T& and
scaffolding wherever necessary, sorting the dismantled material, disposal of uniserviceable material and stacking the serviceable material with all ifts and lead of 50 metres as directed by Engineer. | - | Cum | 678 | - |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:4:8 (1 Cement: 4 coarse sand: 8 graded stone aggregate 40 mm nominal size). | - | Cum | 4,575 | - |
| 3 | Brick work with FPS bricks of class designation 75 in foundation and plinth in:Cement Mortar 1:6 (1 cement: 6 coarse sand). | - | Cum | 5,400 | - |
| 4 | Cement plastering including T&P, scaffolding, material and complete labpour, including cost of water, curing, racking of joints etc. with 20mm cement plaster of mix :1:6 (1 cement: 6 fine/ coarse sand) | - | Sqm | 264 | - |
| 5 | Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position |and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, rackets, gates and similar works. | - | Kg | 144.5 | - |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:112:3 (1 Cement: 112 ccarse sand: 3 graded stone aggregate 20 mm nominal size). | - | Cum | 5,910 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
BOQ_993632.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .