Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.6 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹8.7 L+₹4,761 (0.55%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹8.8 L+₹13,705.98 (1.59%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹8.9 L+₹25,938.75 (3.00%)Admitted-Fee/PreQual/Technical/Finance 30 1063 631303 | 631303 | L4 | Admitted-Fee/PreQual/Technical/Finance | |
| 5 | L5₹9.0 L+₹36,910.91 (4.27%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | V.MUNIYANDI L5 | RAGUNATHAN L2 | gajapathi govindasamy L3 | SHANMUGHA CONSTRUCTION L1 | P.V.S. TRADERS L7 | DHANASEKARAN L4 | A.G.KANNAN L6 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Construction ofcompound wall in kudineer kulam around at Kottamedu panchayat at Thiruporur Panchayat Union in Chengalpattu District for the Year 2026-27 having Package No .5/2026-27 scheme of SFC DP -2026-27 | ||||||||||
| 2.00 | Compound wall: Earth work excavation in Hard soil with initial lead and lifts as per SS20B for foundation | 64.5 | Cum | 245 ₹15,802.5 | 245 ₹15,802.5 | 234.4 ₹15,118.8 | 300 ₹19,350 | 180 ₹11,610 Lowest | 400 ₹25,800 | 265 ₹17,092.5 |
| 3.00 | Sand filling wirh good dry river sand including cost and conveyance and all other labour charges etc complete | 7.43 | Cum | 1,600 ₹11,888 | 1,600 ₹11,888 | 1,528 ₹11,353.04 | 1,800 ₹13,374 | 5,000 ₹37,150 | 1,400 ₹10,402 Lowest | 1,584 ₹11,769.12 |
| 4.00 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance and all other labour charges etc complete | 11.15 | Cum | 4,800 ₹53,520 | 4,600 ₹51,290 Lowest | 4,713.3 ₹52,553.3 | 8,000 ₹89,200 | 5,500 ₹61,325 | 5,000 ₹55,750 | 5,356 ₹59,719.4 |
| 5.00 | Brick work in Cement Morter 1:5 mix using stock bricks including cost and conveyance and all other labour charges etc complete upto basement | 15.08 | Cum | 5,400 ₹81,432 | 5,600 ₹84,448 | 5,373.2 ₹81,027.86 Lowest | 7,500 ₹1,13,100 | 9,000 ₹1,35,720 | 7,000 ₹1,05,560 | 6,106 ₹92,078.48 |
| 6.00 | Reinforced Cement Concrete 1:1.5":3 mix using 20mm ISS HBG metal including cost and conveyance and all other labour charges etc complete upto base | 21.3 | Cum | 8,400 ₹1,78,920 | 7,650 ₹1,62,945 Lowest | 8,381.78 ₹1,78,531.91 | 10,000 ₹2,13,000 | 8,500 ₹1,81,050 | 8,500 ₹1,81,050 | 9,098 ₹1,93,787.4 |
| 7.00 | Reinforced Cement Concrete 1:1.5":3 mix using 20mm ISS HBG metal including cost and conveyance and all other labour charges etc complete above base | 2.62 | Cum | 8,130.32 ₹21,301.44 | 7,600 ₹19,912 Lowest | 8,130.32 ₹21,301.44 | 9,500 ₹24,890 | 8,500 ₹22,270 | 8,500 ₹22,270 | 9,239 ₹24,206.18 |
| 8.00 | Centring charges for all R.C.C. works including cost and conveyance and all other labour charges etc complete. Uptobasement | 72.18 | Sqm | 500 ₹36,090 | 510 ₹36,811.8 | 482 ₹34,790.76 | 500 ₹36,090 | 450 ₹32,481 Lowest | 500 ₹36,090 | 547 ₹39,482.46 |
| 9.00 | Centring charges for all R.C.C. works including cost and conveyance and all other labour charges etc complete. Above basement | 63.76 | Sqm | 964 ₹61,464.64 | 980 ₹62,484.8 | 964 ₹61,464.64 | 710 ₹45,269.6 | 450 ₹28,692 Lowest | 500 ₹31,880 | 1,095 ₹69,817.2 |
| 10.00 | Supplying nad fabrication of steel including all labour charges etc completed | 1.67 | MT | 80,900 ₹1,35,103 | 80,000 ₹1,33,600 | 80,900 ₹1,35,103 | 91.86 ₹153.41 Lowest | 1,10,000 ₹1,83,700 | 70,000 ₹1,16,900 | 85,000 ₹1,41,950 |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
10 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Developement Officer BP
Block Developement Office Thiruporur
Construction ofcompound wall in kudineer kulam around at Kottamedu panchayat at Thiruporur Panchayat Union in Chengalpattu District for the Year 2026-27 having Package No .5/2026-27 scheme of SFC DP -2026-27
2026_RDTN_718046_1
RCNO 181/2025/A2/dt 12.10.2026
Open Tender
Civil Works - Buildings
Item Rate
Kottamedu
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹10,000
Yes
Block Developement Office Thiruporur
19 Nov 2026
26 Oct 2026
10 Nov 2026
26 Oct 2026
10 Nov 2026
26 Oct 2026
29 Oct 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction ofcompound wall in kudineer kulam around at Kottamedu panchayat at Thiruporur Panchayat Union in Chengalpattu District for the Year 2026-27 having Package No .5/2026-27 scheme of SFC DP -2026-27 | - | - | - | - |
| 2 | Compound wall: Earth work excavation in Hard soil with initial lead and lifts as per SS20B for foundation | 64.5 | Cum | - | - |
| 3 | Sand filling wirh good dry river sand including cost and conveyance and all other labour charges etc complete | 7.43 | Cum | - | - |
| 4 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance and all other labour charges etc complete | 11.15 | Cum | - | - |
| 5 | Brick work in Cement Morter 1:5 mix using stock bricks including cost and conveyance and all other labour charges etc complete upto basement | 15.08 | Cum | - | - |
| 6 | Reinforced Cement Concrete 1:1.5":3 mix using 20mm ISS HBG metal including cost and conveyance and all other labour charges etc complete upto base | 21.3 | Cum | - | - |
| 7 | Reinforced Cement Concrete 1:1.5":3 mix using 20mm ISS HBG metal including cost and conveyance and all other labour charges etc complete above base | 2.62 | Cum | - | - |
| 8 | Centring charges for all R.C.C. works including cost and conveyance and all other labour charges etc complete. Uptobasement | 72.18 | Sqm | - | - |
| 9 | Centring charges for all R.C.C. works including cost and conveyance and all other labour charges etc complete. Above basement | 63.76 | Sqm | - | - |
| 10 | Supplying nad fabrication of steel including all labour charges etc completed | 1.67 | MT | - | - |
stage.html
html • 0.03 MB
finance_862404.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
Technical.pdf
Tender Documents • 0.94 MB
BOQ_862404.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .