General Fund 2026-2027 Construction of compound wall and maintenance of Ward No.12 doors, toilet door and front side shed plastering arrangements at Parasery Anganwadi centre in Villukuri Town Panchayat.
2026_DTP_695510_1
294/2026/A1
Open Tender
Civil Works
Works
Villukuri Town panchayat
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹5,000
19 Aug 2026
19 Aug 2026
3 Sept 2026
19 Aug 2026
3 Sept 2026
19 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc complete. (Narrow Foundation - First Depth upto 2 metre) | 3 | m³ | - | - |
| 2 | Cement Concrete 1:4:8 (One cement, Four crushed stone sand and eight hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers - Mixing by Mechanical Means | 1 | m³ | - | - |
| 3 | Cement Concrete 1:3:6 (One Cement, Three crushed stone sand and Six broken stone jelly) using 40mm size hard broken stone jelly excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete and as directed by the departmental officers. - Mixing by mechanical means | 2 | m³ | - | - |
| 4 | Supplying and erecting centering to sides and soffits including supports and strutting with necessary centering for soffits upto 3 meter height using mild steel sheet of size 90 cm x 60 cm x 10 mm gauge with MS angles of size 25mm x 25mm x 3mm laid over silver oak (CW) joists of size 10cm x 6cm spaced upto 90cm c/c and casurina props or 10 cm to 13 cm dia spaced at 0.750 cm c/c complying with standard specifications as per TNDSS NO : 30 & 86. | 10 | m² | - | - |
| 5 | Supplying, fabricating and placing in position Mild Steel/Ribbed T or Steel reinforcement grills of all variety like HYSD/CTD/TMT and all grade like Fe500, Fe550D, Fe500D etc for all RCC works as per design given including cost of steel reinforcement and GI binding wire, wastage etc complete complying with standard specification and as directed by the departmental officers. (Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire) | 150 | Kg. | - | - |
| 6 | Reinforced Cement Concrete 1:1½:3 (One Cement, One and half crushed stone sand and three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including Super Plasticiser, mixing charges for machine mix,laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers - machine mix | 1.5 | m³ | - | - |
| 7 | Brick work in following Cement Mortar using best quality Burnt Clay Brick of size 8¾“x4¼”x2¼” with class designation of 10 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc., complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally other type of bond shall be done as directed by the Executive Engineer in charge. | 8 | m³ | - | - |
| 8 | Plastering the surface of walls with Cement Mortar 1:4 (One cement and Four plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc., complete complying with standard specification and as directed by the departmental officers. | 45 | m² | - | - |
| 9 | Supplying and fixing mild steel gate using MS flats and rounds as directed by the departmental officers inclusive of cost of MS grill including one of red oxide and fixing in position etc. complete (as per the schedule of rate) | 40 | Kg. | - | - |
| 10 | Painting two coats with ready mixed plastic emulsion paints of first class quality and of approved colour over a priming coat including through scraping clean removal of dirt etc, complete and including cost of necessary plaster of paris, putty, brushes, wherever required and all labour charges, scaffolding charges etc., complete as per standard specification. | 45 | m² | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.57 MB
BOQ_836289.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].