| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.7 LAccepted-Finance | ₹24.7 L | L1 | Accepted-Finance Below Rate quoted |
| 2 | L2₹24.7 LRejected-Finance DOOR NO 7 121 KUDAL NAGAR KUDAL NAGAR KUTTALAM PATTI 626101 | VIRUDHUNAGAR | TAMIL NADU | 626101 | ₹24.7 L | L2 | Rejected-Finance Above Rate quoted |
| Sl No | Description | Qty | Unit | Mani M L2 | Indira Construction L1 |
|---|---|---|---|---|---|
| 1.00Name of Work:Construction of Community Centre at Rajanthangal village Near Easwarn Kovil @ Rajathangal panchayat | |||||
| 1.01 | Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation | 24.73 | Cu.m | 261 ₹6,454.53 | 260 ₹6,429.80 |
| 1.02 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation | 15.22 | Cu.m | 5,430 ₹82,644.60 | 5,430 ₹82,644.60 |
| 1.03 | Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete. | 44.87 | Cu.m | 6,146 ₹2.8 L | 6,145 ₹2.8 L |
| 1.04 | Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete BGL | 84.83 | sqm | 547 ₹46,402.01 | 547 ₹46,402.01 |
| 1.05 | Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc completeAGL | 138.71 | sqm | 1,095 ₹1.5 L | 1,095 ₹1.5 L |
| 1.06 | Supplying and fabrication of steel including cost and conveyance of steel to site and cost of binding wire including all labour charges for cutting,bending, tying and forming grills for all works | 1.53 | MT | 91,880 ₹1.4 L | 91,880 ₹1.4 L |
| 1.07 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, finishing and curing etc complete. | 30.16 | Cu.m | 9,045 ₹2.7 L | 9,045 ₹2.7 L |
| 1.08 | Supplying and fixing G.I 'L' angle of size 100x100x6mm including cutting the angle to the required length drilling holes wherever necessary for fixing the pipe purlins, rafters and fixing the post etc., complete. | 889.15 | sqm | 132 ₹1.2 L | 131 ₹1.2 L |
| 1.09 | Supply and fixing of PUF roof panels made up of minimum 0.5mm thick PPGI corrugated Sheet at the top and a plain sheet at the bottom with a layer of rigid CFC free polyurethane foam (PUF) of density 40kg + 2 Kg/cum as insulation in between .The polyurethane foam shall confirm to latest IS 12436. The minimum thickness of PU foam layer shall be 29mm for having 30mm (min) thick PUF panel. The PPGI Sheets shall be of minimum 240 MPA Steel Grade & shall have a Zinc coating of minimum 120 GSM as per IS 277/1992, 5-7 microns of epoxy primer on both sides of the sheet & polyester top coat of 18-20 microns on one side / outer side. The PPGI Sheets / PUF Panels shall have a protective guard film of minimum 20-25 microns to avoid scratches to finished panel during transportation. Providing ridges or hips ,encasing the ends of Panel with plain G.S. sheet fixed with polymer coated J or L hooks, bolts and nuts 8 mm dia G.I. limpet and bitumen washers etc complete excluding the cost of trusses, purlins and inclusive of cutting to size and shape wherever required. | 133.3 | sqm | 3,371 ₹4.5 L | 3,370 ₹4.5 L |
Updated dates
Tender Value
₹25 L
EMD Value
₹25,000
Closing Date
9 Feb 2026, 3:00 pmClosed
BLOCK DEVELOPEMENT OFFICER (V.PT
THE BLOCK DEVELOPEMENT OFFICE,KILPENNATHUR
CONSTRUCTION OF COMMUNITY CENTRE AT RAJANTHANGAL VILLAGE NEAR EASWARAN KOVIL AT RAJANTHANGAL PANCHAYT .
2026_RDTN_648100_1
ROC.NO.A6/9225/2025 DT.12.01.2025_01
Open Tender
Civil Works
KILPENNATHUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹25,000
Yes
9 Feb 2026
28 Jan 2026
9 Feb 2026
28 Jan 2026
9 Feb 2026
28 Jan 2026
Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation
Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete.
Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete BGL
Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc completeAGL
Supplying and fabrication of steel including cost and conveyance of steel to site and cost of binding wire including all labour charges for cutting,bending, tying and forming grills for all works
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, finishing and curing etc complete.
Supplying and fixing G.I 'L' angle of size 100x100x6mm including cutting the angle to the required length drilling holes wherever necessary for fixing the pipe purlins, rafters and fixing the post etc., complete.
Supply and fixing of PUF roof panels made up of minimum 0.5mm thick PPGI corrugated Sheet at the top and a plain sheet at the bottom with a layer of rigid CFC free polyurethane foam (PUF) of density 40kg + 2 Kg/cum as insulation in between .The polyurethane foam shall confirm to latest IS 12436. The minimum thickness of PU foam layer shall be 29mm for having 30mm (min) thick PUF panel. The PPGI Sheets shall be of minimum 240 MPA Steel Grade & shall have a Zinc coating of minimum 120 GSM as per IS 277/1992, 5-7 microns of epoxy primer on both sides of the sheet & polyester top coat of 18-20 microns on one side / outer side. The PPGI Sheets / PUF Panels shall have a protective guard film of minimum 20-25 microns to avoid scratches to finished panel during transportation. Providing ridges or hips ,encasing the ends of Panel with plain G.S. sheet fixed with polymer coated J or L hooks, bolts and nuts 8 mm dia G.I. limpet and bitumen washers etc complete excluding the cost of trusses, purlins and inclusive of cutting to size and shape wherever required.
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of paint and all labour charges etc complete
Paving the flooring with special type of flooring tiles (cement based Vitified tiles 20mm thick) in CM 1;3 ( 600x600x8MM ) including cost etc
Paving the flooring with special type of flooring tiles (cement based Anti skid 20mm thick) in CM 1;3 305x305x8MM ) including cost etc
Supplying and fabrication of the following steel doors including cost and conveyance and all charges etc complete.
steel window
Steel ventilator
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Painting two coats using ready mixed Plastic Emulsion paint including cost and conveyance of paint and all labour charges etc complete
Supplying and painting two coats new iron work such as steel doors ventilators, window bars etc., (WITHOUT PRIMER)
Light Point SD 20
Tube Light SD 88
Celeing Fan SD 110
Led Bulb SD 83
DPI switch
Service wire SD 64
Service Pipe SD 69
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
TD.pdf
Tender Documents • 1.03 MB
BOQ_776989.xls
BOQ • 0.25 MB