| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr | L1 | Accepted-AOC Lowest1 |
| 2 | L2₹1.5 Cr+₹15.2 L (11.2%)Rejected-AOC | ₹1.5 Cr+₹15.2 L (11.2%) | L2 | Rejected-AOC Lowest2 |
| 3 | L3₹1.5 Cr+₹18.0 L (13.3%)Rejected-AOC | ₹1.5 Cr+₹18.0 L (13.3%) | L3 | Rejected-AOC Lowest3 |
| 4 | L4₹1.6 Cr+₹24.3 L (17.9%)Rejected-AOC | ₹1.6 Cr+₹24.3 L (17.9%) | L4 | Rejected-AOC Lowest4 |
Tender Value
₹1.9 Cr
EMD Value
₹3.8 L
Closing Date
10 Feb 2020, 5:00 pmClosed
SE ICC MAHOBA
OFFICE OF THE SE ICC BAJARIYA MAHOBA
Earth Work and Pucca Works in Construction of Ratauli Weir Dam Main Canal and Minors.
2020_UPIDC_429650_1
05/SE/2019-20
Open Tender
Civil Works
Item Rate
150 days
RATAULI
AS PER NIT AND TENDER DOCUMENT
2 documents required · 2 mandatory
₹2,354
EE MDCD 1ST
₹3.8 L
Yes
21 Dec 2020
3 Feb 2020
11 Feb 2020
3 Feb 2020
10 Feb 2020
3 Feb 2020
Amount
The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work.
Earth work in excavation in making canal section in all type of Strata excluding hard granite rock including compaction, dressing, watering and disposal of excavated material as per direction of Engineer-in-charge including all leads, lifts and T&P etc for proper completion of Job but Excluding G.S.T.
Earth work in filling in embankment including mechanical compaction , dressing average leads up to 595m including all cost of earth for proper completion of work but Excluding G.S.T.
Earth work in excavation in foundation including all cost of Labour,T&P etc. for proper completion of work but Excluding G.S.T.
Supply and Laying Sand under C.C. work in foundation including all cost of material labour T&P etc. for proper completion of work but Excluding G.S.T.
C.C. 1:3:6 in foundation including all cost of material, labour T&P etc. for proper completion of work but Excluding G.S.T.
R.C.C. 1:2:4 in super structure including all cost of material Labour,T&P etc. for proper completion of work but Excluding G.S.T.
Centering and shuttering for R.C.C. work including all cost of material, labour T&P etc. for proper completion of work but Excluding G.S.T.
Centering and shuttering for Slab and Beams work including including all cost of material labour T&P etc. for proper completion of work but Excluding G.S.T.
R.C.C. 1:1.5:3 work with 10-20 mm size Granite stone grit including all cost of material labour T&P etc. for proper completion of work but Excluding G.S.T.
Steel reinforcement including bending, binding, cutting and placing in position including all cost of material,Labour T&P etc. for proper completion of work but Excluding G.S.T.
Providing and Laying stone Boulder Pitching with 40-60 Kg.including all cost of material labour T&P etc. for proper completion of work but Excluding G.S.T.
Providing 100 mm dia. P.V.C. Pipe for weep hole including all cost of material labour T&P etc. for proper completion of work but Excluding G.S.T.
M/S VEER SINGH CONSTRUCTION COMPANY
NIRANJAN SINGH
M/S SINGH BROTHER
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .