| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.4 CrAdmitted-Finance | -11.50% | ₹9.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹9.4 CrAdmitted-Finance A 3 332 SECTOR 8 ROHINI DELHI 110085 | NORTH WEST | DELHI | 110085 | -11.11% | ₹9.4 Cr | L2 | Admitted-Finance |
| 3 | L3₹9.4 CrAdmitted-Finance | -11.10% | ₹9.4 Cr | L3 | Admitted-Finance |
| 4 | L4₹9.5 CrAdmitted-Finance | -10.00% | ₹9.5 Cr | L4 | Admitted-Finance |
| 5 | L5₹10.0 CrAdmitted-Finance 0 RAM ASARE NANDPUR ROAD BALAHARAMAU KANPUR DEHAT UTTAR PRADESH 209301 UDYAM UP 42 0021853 | KANPUR DEHAT | UTTAR PRADESH | 209301 | -5.67% | ₹10.0 Cr | L5 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹20 L
Closing Date
17 Apr 2026, 2:00 pmClosed
PANKAJ KUMAR
Gail Gas Ltd
HIRING OF AGENCIES FOR PE LAYING WORKS AT MEERUT GA
2026_GAILG_274424_1
GAIL GAS/NOIDA/8222/PK/26-27/11
Open Tender
Miscellaneous Works
548 days
Noida
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹20 L
Yes
Through VC
6 May 2026
10 Apr 2026
20 Apr 2026
10 Apr 2026
17 Apr 2026
10 Apr 2026
13 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | PE PIPELINE | - | - | - | - | 1.0 |
| 2 | Pipe Laying in any type of surface like unprepared surface (Katcha surface)/ Normal Surface/ Hard surface/Pebbles/Cobbles/Boulders/Structures/Rock surface etc using open cut/ Moling (without Casing)/ Directional Drilling technique (without casing pipe) methodology. | - | - | - | - | 1.1 |
| 3 | Receipt, Loading, unloading, storing, reloading, tranportation, unloading, stringing and laying of PE100, SDR11 line pipes of all sizes including, proper stacking, identification,and supply of accessories of all sizes & thickness like PE Bends, Couplers, Endcaps, Tee, Reducer, CS / GI to PE Fittings (i.e. Transition Fittings of sizes 20 mm to 32 mm), Warning Mat etc.
Handling, Stringing / uncoiling, aligning of the PE line pipe on the pipeline Right-of-Use / route, laying / installation of PE line pipe alongwith required accessories as mentioned above as per specification wherever required depending on site condition including execution of all works; Storeage of material in contractor's store, fabrication, access for construction procurement and supply of all materials, consumables, equipments, labour and other inputs.
In the case of free issue items, the scope also includes, receiving and loading from Owner's designated store, transportation, unloading and stacking of free issue items at Contractor's store.
-Laying of all PE pipe (PE 100 SDR11), Including supply (in case of HDD/Moling/open trench), Couplers, End caps etc. (Ref. cl. 4.3 of Particular job specification).
-Survey of under ground utilities, execution of the work as per specification, including excavation of pits moling with the hole size not exceeding 20% of the pipe dia, jointing and insertion of carrier pipe with casing, testing & commissioning and restoration of the pits to original condition, submission of As-Built Graph as per specifications and the instruction of Engineer-in-charge. | - | - | - | - | - |
| 4 | Carrying out all temporary, ancillary, auxiliary works required to make the PE pipeline ready for commissioning as per drawings. | - | - | - | - | - |
| 5 | Specifications, scope of work indicated in PJS and other provisions of Contract document and instructions of Engineer-in-charge, including but not limited to carrying out the following works: | - | - | - | - | - |
| 6 | Surveying of route and detours required at the time of execution, preparation of construction drawings showing survey details and submit same to Owner for review / approval. | - | - | - | - | - |
| 7 | Carrying out preliminary activities such as preperation of drawings wherever required for crossing etc. | - | - | - | - | - |
| 8 | Preparation and getting approval of schedules, execution procedures, drawings/ sketches/ wherever required, making trial pits to determine the underground utilities/ services etc., restoration of the abandoned trial pits to original condition. | - | - | - | - | - |
| 9 | Stacking and installation of construction markers, clearing, fencing, grubbing, cutting of trees, full filling all the requirements of various statutory/ environment authorities to the entire satisfaction of concerned authorities, grading of work area. | - | - | - | - | - |
| 10 | Barricading the work area as per local authorities norms & to the satisfaction of Owner/ Eingineer -in- charge, installation of safety signs. | - | - | - | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
Vol_I_PELaying_Meerut.pdf
Tender Documents • 1.71 MB
VOL_II_II_2_meerut.pdf
Tender Documents • 6.32 MB
BOQ_320378.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid