Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.7 LAdmitted-Finance | -28.00% | ₹12.7 L | L1 | Admitted-Finance |
| 2 | L2₹13.3 L+₹55,139.94 (4.33%)Admitted-Finance | -24.88% | ₹13.3 L+₹55,139.94 (4.33%) | L2 | Admitted-Finance |
| 3 | L3₹13.9 L+₹1.2 L (9.43%)Admitted-Finance 302 SHIV SADAN OPP ANAND MILAN SOC NEAR FIVE SHOP BHATIA CHOWK ULHASNAGAR 421004 | THANE | MAHARASHTRA | 421004 | -21.21% | ₹13.9 L+₹1.2 L (9.43%) | L3 | Admitted-Finance |
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
14 Aug 2026, 11:00 amClosed
SE CIVIL JVVNL
SE CIVIL JVVNL OPH, RAM MANDIR BANI PARK JAIPUR
Various repair of NABL Lab at Hawa Sadak, Jaipur
2026_JVVNL_586077_12
E-NIT 10/2026-27
Open Tender
Civil Works
Percentage
90 days
Hawa Sadak
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
A O(JCC)JVVNL,Jaipur Through NEFT/RTGS/IMPS/UPI
₹30,000
Yes
17 Aug 2026
12 Aug 2026
14 Aug 2026
12 Aug 2026
14 Aug 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.001 | PART-A (Bldg.) | - | - | - | - |
| 1 | 1.8
Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter.
All kinds of soils | 10 | P.cum | 178 | ₹1,780 |
| 2 | M15 grade Nominal Mix
1: 2: 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size). (3.1.2/B) | 6 | P.cum | 5,548.8 | ₹33,292.8 |
| 3 | 11.26/B-11
Random rubble dry stone kharanja under floor . | 1 | P.cum | 1,118 | ₹1,118 |
| 4 | 12.22.1
Providing and applying white cement based putty over plastered surface to prepare the surface even and smooth complete.
(A) New plastered surface (three or more coats) | 50 | P.sqm | 92 | ₹4,600 |
| 5 | 12.37.1 /B-12
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade including all scaffolding:
(A) New work (two or more coats) over and i/c scrapping and priming coat with cement primer. | 50 | P.sqm | 83 | ₹4,150 |
| 6 | 12.42/B-12
Finishing walls with Acrylic Smooth exterior paint of required shade including all scaffolding New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including base coat of water proofing cement paint applied @ 2.20 kg/ 10 sqm ). | 15 | P.sqm | 95 | ₹1,425 |
| 7 | 12.46.1
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:
(A) Two or more coats on new work. | 50 | P.sqm | 76 | ₹3,800 |
| 8 | 16.1.1.2 /B-16
Providing and fixing aluminum work for doors ,windows, ventilators and partition with extruded built up standard tubular / appropriate Z sections and other sections of approved make conforming to IS :733 and IS :1285, fixed with rawl plugs and screws or with fixing clips ,or with expansion hold fasteners including necessary filling up of gap. at junctions , at top ,bottom and sides with required PVC/neoprene felt etc. Aluminium section shall be smooth ,rust free, straight ,mitered and jointed mechanically wherever required including cleat angle Aluminium snap beading for glazing /paneling , C.P. brass/ stainless steel screws Al. Tower bolt & Al. handle & Al. Aldrop etc.,all complete as per architectural drawings and the directions of Engineer- in – charge .(Glazing and paneling to be paid for separately).
(a) For fixed Portion . Powder coating aluminum ( minimum thickness of powder coating 50 micron) | 40 | P.kg | 421 | ₹16,840 |
| 9 | (b) For shutters builtup standard tubular sections of openable doors ,windows & ventilators including providing & fixing hinges / rollers etc. and making provision for fixing of fittings wherever required (lockes shall be paid for separately).
Powder coating aluminum ( minimum thickness of powder coating 50 micron) 16.1.2.2 | 30 | P.kg | 457 | ₹13,710 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
Tendernotice_2.pdf
PDF • 2.51 MB
BOQ_1041160.xls
BOQ • 0.33 MB
corrigendum_NIT_8_to_10.pdf
PDF • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .