Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC 7A SCHEME NO 71 DHAR ROAD INDORE INDORE MADHYA PRADESH 452002 | INDORE | MADHYA PRADESH | 452002 | ₹1.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.2 Cr+₹6.0 L (5.20%)Rejected-AOC 28 A G SECTOR J K ROAD GOVINDPURA BHOPAL M P | BHOPAL | BHOPAL | MADHYA PRADESH | ₹1.2 Cr+₹6.0 L (5.20%) | L2 | Rejected-AOC Not L1 |
| 3 | L3₹1.2 Cr+₹7.3 L (6.30%)Rejected-AOC 35 A FORT INDUSTRIAL ESTATE KILA MAIDAN INDORE 450006 INDORE | 450006 | ₹1.2 Cr+₹7.3 L (6.30%) | L3 | Rejected-AOC Not L1 |
| Sl No | Description | Qty | Unit | BONTON TECHNOMAKE PRIVATE LIMITED H3 | Methodex Systems Pvt. Ltd H1 | IMPRESSION FURNITURE INDUSTRIES PRIVATE LIMITED H2 |
|---|---|---|---|---|---|---|
| 1.00Supply of Furniture & Interior Work | ||||||
| 1.01 | COST FOR INTERIOR WORK | 1 | Nos | 27,79,578 ₹32,79,902 Lowest | 29,54,692 ₹34,86,537 | 29,24,117 ₹34,50,458 |
| 1.02 | COST FOR FURNITURE WORK | 1 | Nos | 14,14,433 ₹16,69,031 Lowest | 15,03,542 ₹17,74,180 | 14,87,984 ₹17,55,821.12 |
| 1.03 | COST FOR AIR CONDITIONER WORK | 1 | Nos | 18,85,125 ₹22,24,448 Lowest | 20,03,888 ₹23,64,588 | 19,83,152 ₹23,40,119.36 |
| 1.04 | COST FOR ELECTRICAL WORK | 1 | Nos | 19,20,750 ₹22,66,485 Lowest | 20,41,757 ₹24,09,273 | 20,20,629 ₹23,84,342.22 |
| 1.05 | COST FOR SOUND SYSTEM CABELING WORK | 1 | Nos | 13,46,260 ₹15,88,587 Lowest | 14,31,074 ₹16,88,667 | 14,16,266 ₹16,71,193.88 |
| 1.06 | COST FOR PROJECTOR | 1 | Nos | 4,89,180 ₹5,77,232 Lowest | 5,19,998 ₹6,13,598 | 5,14,617 ₹6,07,248.06 |
Tender Value
Refer Docs
EMD Value
₹3 L
Closing Date
16 Apr 2024, 6:00 pmClosed
Registrar DAVV
Registrar DAVV RNT Marg Indore
Providing and fixing Acoustics And Interior Work
2024_DAVV_346268_1
ENGG/2024/T/3/2/2024
Open Tender
Miscellaneous Works
Item Rate
365 days
School of Commerce at Takshila DAVV Indore
Refer Tender Document
2 documents required · 2 mandatory
₹10,000
₹3 L
14 Aug 2025
15 Mar 2024
18 Apr 2024
15 Mar 2024
16 Apr 2024
15 Mar 2024
Supply of Furniture & Interior Work
COST FOR INTERIOR WORK
COST FOR FURNITURE WORK
COST FOR AIR CONDITIONER WORK
COST FOR ELECTRICAL WORK
COST FOR SOUND SYSTEM CABELING WORK
COST FOR PROJECTOR
IMPRESSION FURNITURE INDUSTRIES PRIVATE LIMITED
BONTON TECHNOMAKE PRIVATE LIMITED
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .