| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAccepted-AOC | ₹2.0 Cr | L1 | Accepted-AOC Lowest Negotiated Bidder |
| 2 | L2₹2.1 Cr+₹3.4 L (1.67%)Rejected-AOC | ₹2.1 Cr+₹3.4 L (1.67%) | L2 | Rejected-AOC Second Lowest Bidder |
| 3 | L3₹2.1 Cr+₹5.8 L (2.83%)Rejected-AOC | ₹2.1 Cr+₹5.8 L (2.83%) | L3 | Rejected-AOC Highest Bidder |
| Sl No | Description | Qty | Unit | B.PANNEER SELVAN L3 | A V K AND CO L2 | T. KANAKARAJ L1 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling, clearing away and carefully stacking materials useful for re-use for Brick / stone masonry in Cement mortar walls under 3m high etc., complete complying with standard specification. | 83.44 | m3 | 318 ₹26,533.92 | 305 ₹25,449.2 Lowest | 305 ₹25,449.2 Lowest |
| 2.00 | Dismantling of pressed tiles and weathering course | 79.4 | m2 | 52 ₹4,128.8 | 50 ₹3,970 Lowest | 51 ₹4,049.4 |
| 3.00 | Dismantling RCC by manual / by using deploying machineries | 17.29 | m3 | 4,841 ₹83,700.89 | 4,700 ₹81,263 | 4,620 ₹79,879.8 Lowest |
| 4.00 | Dismantling Floor finish & dadooing walls in cement mortar with Mosaic Tiles / Glazed Tiles / Clay Tiles / Cuddapah Slabs | 94.04 | m2 | 69 ₹6,488.76 | 70 ₹6,582.8 | 68 ₹6,394.72 Lowest |
| 5.00 | Dismantling, clearing away and carefully stacking materials useful for re-use for Doors & windows including removal of frames, hinges and fastenings etc., complete complying with standard specification. | 13.86 | m2 | 173 ₹2,397.78 | 150 ₹2,079 Lowest | 170 ₹2,356.2 |
| 6.00 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- Upto 2.40m Footing Depth.
Data worked out for 48 m3 per day/8 hrs. | 529 | m3 | 386 ₹2,04,194 | 400 ₹2,11,600 | 370 ₹1,95,730 Lowest |
| 7.00 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.
A). Upto 2.40m Depth.
Data worked out for 64 m3 per day/8 hrs. | 35 | m3 | 209 ₹7,315 | 180 ₹6,300 Lowest | 200 ₹7,000 |
| 8.00 | Cement Concrete 1:5:10 (One Cement, Five M- sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means | 44.5 | m3 | 5,691 ₹2,53,249.5 | 6,000 ₹2,67,000 | 5,600 ₹2,49,200 Lowest |
| 9.00 | Damp proof course as per IS 3067:1988 with Cement Mortar 1:4 (One Cement and Four M- sand) 12mm thick mixed with best approved quality Integral liquid water proofing compound conforming to Indian Standard specification as specified by the departmental officers at 2% by weight of cement used , finishing and curing etc. complete complying with standard specification - Manual Mixing | 96 | m2 | 315 ₹30,240 | 305 ₹29,280 | 300 ₹28,800 Lowest |
| 10.00 | Supplying and filling in foundation, basement, etc with filling M- sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 89.5 | m3 | 1,853 ₹1,65,843.5 | 1,750 ₹1,56,625 Lowest | 1,770 ₹1,58,415 |
Tender Value
₹2.0 Cr
EMD Value
₹1.1 L
Closing Date
14 Aug 2025, 3:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer PWD Building C and M Circle Erode
Construction of One New Modern Kitchen and Modification of Existing Multipurpose Hall into a Dining Hall in Civil Service Training Institute at BhavaniSagar in Erode District.
2025_PWD_589869_1
NIT11 2025 26 B C M CIRCLE ERODE Dated 29.07.2025
Open Tender
Civil Works - Buildings
Lump-sum
210 days
bhavanisagar
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹1.1 L
14 Nov 2025
7 Aug 2025
14 Aug 2025
7 Aug 2025
14 Aug 2025
7 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_704636.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .