| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.3 LAccepted-AOC 69 1A DESHBANDHU ROAD EAST KOLKATA 700035 | KOLKATA | KOLKATA | WEST BENGAL | 700035 | ₹7.3 L | L1 | Accepted-AOC 1ST LOWEST |
| 2 | L2₹7.9 L+₹57,191.28 (7.79%)Rejected-Finance JANGIPARA SOARI RASHIDPUR DEYPARA HOOGHLY WEST BENGAL 712408 | HOOGHLY | WEST BENGAL | 712408 | ₹7.9 L+₹57,191.28 (7.79%) | L2 | Rejected-Finance 2ND LOWEST |
| 3 | L3₹7.9 L+₹57,806.24 (7.88%)Rejected-Finance TALDANGRA BANKURA 722152 | TALDANGRA | BANKURA | WEST BENGAL | 722152 | ₹7.9 L+₹57,806.24 (7.88%) | L3 | Rejected-Finance 3RD LOWEST |
| 4 | L4₹7.9 L+₹58,036.85 (7.91%)Rejected-Finance TALDANGRA PO TALDANGRA DIST BANKURA PIN 722152 | TALDANGRA | BANKURA | WEST BENGAL | 722152 | ₹7.9 L+₹58,036.85 (7.91%) | L4 | Rejected-Finance 4TH LOWEST |
| 5 | Rejected-Technical KOTULPUR BANKURA 722141 | KOTULPUR | BANKURA | WEST BENGAL | 722141 | - | - | Rejected-Technical Not Qualified |
Tender Value
₹7.7 L
EMD Value
₹15,374
Closing Date
29 May 2026, 4:30 pmClosed
EE, BANKURA IRRIGATION DIVISION
KENDUADIHI, BANKURA
Maintenance and repair of canal bank in between ch 0 to ch 75 of SBC within Block and Ps Indpur,Dist Bankura under Bankura Irrigation Division during 2026 27
2026_IWD_1024612_2
WBIW/EE/BNKID/eNIT-03/26-27
Open Tender
CIVIL WORKS
Percentage
30 days
INDPUR
REFER TO TENDER DOCUMENTS
6 documents required · 6 mandatory
₹15,374
Yes
9 Jul 2026
21 May 2026
29 May 2026
21 May 2026
29 May 2026
21 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30cm.girth including removing as directed by Engineer-in-charge. | 1 | Sqm | 5.96 | ₹5.95 |
| 2 | Supplying, spreading and consolidating Moorum to a depth of 75 mm at desired density and C.B.R. as per specification with power roller to proper gradient and camber including watering as necessary, and lighting, guarding, barricading and making adequate earthen bundh where necessary to protect the edges and curing with water for 2 to 3days, mending cracks by rolling where necessary including all incidental charges of roller, cost of fuel & lubricants etc. complete as per pecification. | 1 | Cum | 1,069.04 | ₹1,067.97 |
| 3 | “Cast-in-situ cement concrete blocks or lining units as per designed section and specification, in normal mix propotion 1:1.5:3 (corrsponding to M20 grade with well graded 20 mm down stone metal aggregate, laid in position by casting in alternative panels or otherwise to keep a gap of 12mm between the adjacent units, over a layer of polythene sheet of thickness not less than 100 to act as aseperator between the bottom surface of the block and the sand cushion/filter material laid below the blocks ,including dressing , ramming, shuttering, finishing the exposed surface by trowel without adding any additional cement and sand mortar ,curing and filling the gaps between the adjacent units by 5.6mm down coarse aggregate to be compacted properly, with all leads and lifts including supply and carriage of all materials, complete, without the cost of sand cushion/filter.
(The rate is exclusive of the cost of stone aggregate and its carriage upto site. Construction wing has to add the cost of same from the SoR of PW (Roads) to derive the consolidated rate. Consumption chart of the USoR may be used for assessing the quantity of coarse aggregates per cum of concrete).
(Stone Aggregate of Pakur or Rajmahal,or broken stone of North Bengal varieties)
Note:provisions of the latest departmental manual for lining in Irrigation Canals are to be followed ,when ever applicable. | - | Cum | 7,662.37 | - |
| 4 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading
and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in
requisite profile, levelling as per direction of the Engineer-in-charge within a lead of
NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking.
A) Beyond 500 metre and upto 1.00 km | - | Cum | 259.81 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
WBForm2911eNIT03SL2.pdf
Tender Documents • 0.54 MB
BOQ_2518051.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .